mpRes » Single Event » Kyoto 250 » 7 » Race 3de | en

Kyoto 250 Season 7 - Race 3 (replay) download
Version LfS 0.6E XRT RB4 KY1
Time 30.03.2014, 17:36:08
Distance 140 Laps (417.12 km)
Daytime Afternoon RAC FZ5
Weather Cloudy
Wind Low (10.05 km/h)
Statistics Tables

Race Result

Pos. (Start) Name Car Laps Total Time Gap [s] Stops Open Penalties Best Lap Leading Laps LH AU SH BH AC CV ST
31 of 31 cars finished the race.
1 (+1) 777 R.Friskopps XRT 140 2h 26:03.43 1 - 47.45 68 (73-140) X X W
2 (+22) 911 J.Teien XRT 140 + 0.04 1 - 47.45 0 X X W
3 (+9) 7 M.Wentjärvi XRT 140 + 2.79 + 2.75 1 - 47.60 0 X X W
4 (-1) 9 P.Diaz XRT 140 + 2.94 + 0.15 1 - 47.60 2 (52-53) X X X W
5 (+2) 17 N.Lamothe XRT 140 + 4.02 + 1.08 1 - 47.57 0 X X X W
6 (-2) 420 R.Majoor XRT 140 + 4.11 + 0.09 1 - 47.57 0 X X W
7 (+1) 77 M.Velikov XRT 140 + 5.31 + 1.20 2 - 47.61 0 X X W
8 (+15) 720 J.Lavrikov XRT 140 + 5.78 + 0.47 2 - 47.75 0 X X X M
9 (+7) 34 K. Motiejuitis XRT 140 + 5.99 + 0.21 1 - 47.52 0 X X W
10 (-4) 19 P.Wdowiarz XRT 140 + 6.44 + 0.45 2 - 47.67 0 X X X M
11 (-10) 32 P.Hall XRT 140 + 6.93 + 0.49 1 - 47.75 63 (1-51, 54-63, 66-67) X X X M
12 (+10) 69 J.Sedgwick XRT 140 + 7.43 + 0.50 4 - 47.77 0 X X X W
13 (-2) 33 Y.Laprevotte XRT 140 + 9.27 + 1.84 1 - 47.68 0 X X W
14 (+12) 991 S.Martin XRT 140 + 9.92 + 0.65 2 (Admin) 47.75 0 X X W
15 (-5) 21 M.Kingsbury XRT 140 + 10.33 + 0.41 4 (Admin) 47.73 0 X X W
16 (-3) 14 B.Goga XRT 140 + 11.11 + 0.78 2 - 48.30 0 X X X M
17 (-12) 96 R.Kronpušs XRT 139 + 1 Lap + 1 Lap 5 - 48.12 0 X X X W
18 (-1) 46 B.Botev XRT 139 + 1 Lap + 1.64 3 - 47.73 7 (64-65, 68-72) X X W
19 (-1) 510 E.Harmon XRT 139 + 1 Lap + 2.19 2 - 48.33 0 X X W
20 (-1) 27 T.Wilber XRT 139 + 1 Lap + 0.40 2 - 47.96 0 X X W
21 (+8) 66 N.Mangani XRT 139 + 1 Lap + 5.31 1 - 48.55 0 X X W
22 (-8) 28 Z.Cagaš XRT 138 + 2 Laps + 1 Lap 4 - 47.74 0 X X W
23 (+4) 1 M.Garbolewski XRT 138 + 2 Laps + 6.77 6 - 47.71 0 X X W
24 (-9) 91 J.Cameron XRT 138 + 2 Laps + 2.40 3 - 47.97 0 X X X W
25 (-4) 25 R.Kingsbury XRT 138 + 2 Laps + 4.48 4 - 47.67 0 X X X W
26 (-6) 63 G.Pucėta XRT 123 + 17 Laps + 15 Laps 1 - 47.73 0 X X X W
27 (-18) 3 J.Letteriello XRT 111 + 29 Laps + 12 Laps 4 DT (Speeding) 47.89 0 X X W
28 (±0) 999 J Bento XRT 96 + 44 Laps + 15 Laps 2 - 48.28 0 X X X W
29 (-4) 15 J.Telkkälä XRT 16 + 124 Laps + 80 Laps 1 - 48.63 0 X X W
30 (±0) Sigitas Šakys RB4 0 + 140 Laps + 16 Laps 0 - 0.00 0 X X X X M
31 (±0) Jonathan Palmer RB4 0 + 140 Laps + 0.00 0 - 0.00 0 X X M

Pitstops

Name Lap Work Time [s] Total
29 cars made 65 pitstops with a total time of 29:50.60
420 R.Majoor 54 131074_0_0 4.34 4.34
32 P.Hall 73 131266_8_0 12.59 12.59
777 R.Friskopps 54 10402_15_0 13.32 13.32
911 J.Teien 54 141474_15_0 14.08 14.08
63 G.Pucėta 116 141474_15_0 14.95 14.95
7 M.Wentjärvi 54 141474_15_0 15.21 15.21
17 N.Lamothe 54 141474_15_0 17.10 17.10
720 J.Lavrikov 54 131074_0_0 6.99 20.31
59 10402_15_0 13.32
34 K. Motiejuitis 7 229394_0_0 23.51 23.51
9 P.Diaz 54 47266_15_0 31.71 31.71
15 J.Telkkälä 1 131074_0_0 38.24 38.24
66 N.Mangani 63 37970_0_0 38.32 38.32
19 P.Wdowiarz 55 20546_0_0 19.31 38.62
73 32834_0_0 19.31
77 M.Velikov 17 36930_0_0 25.34 42.46
73 141474_15_0 17.12
33 Y.Laprevotte 54 179378_15_0 47.08 47.08
27 T.Wilber 7 151618_0_0 21.54 48.39
55 155842_10_0 26.85
999 J Bento 7 135234_0_0 15.80 48.62
54 168018_0_0 32.82
510 E.Harmon 7 36930_0_0 25.95 1:03.82
73 44258_15_0 37.87
14 B.Goga 8 164882_0_0 26.76 1:07.88
73 178402_15_0 41.12
21 M.Kingsbury 7 168002_0_0 26.79 1:17.34
54 141474_15_0 17.09
73 33810_0_0 25.32
75 4098_0_0 8.14
991 S.Martin 6 179442_15_0 50.57 1:21.89
73 43234_15_0 31.32
28 Z.Cagaš 17 36946_0_0 31.32 1:53.86
21 227490_15_0 31.89
73 47266_15_0 31.33
122 32834_0_0 19.32
91 J.Cameron 54 178418_15_0 48.98 1:57.62
73 43234_15_0 31.32
136 47330_15_0 37.32
25 R.Kingsbury 7 147474_0_0 16.38 1:58.65
54 131074_0_0 15.63
59 44210_15_0 37.32
136 48370_15_0 49.32
96 R.Kronpušs 7 178402_15_0 38.85 2:04.80
17 141474_15_0 15.97
21 30882_15_0 25.34
54 14562_15_0 25.32
63 14498_15_0 19.32
3 J.Letteriello 6 141474_15_0 29.15 2:10.59
7 178402_15_0 39.13
54 141474_15_0 18.99
73 47346_15_0 43.32
69 J.Sedgwick 7 27874_15_0 31.34 2:16.24
54 174242_15_0 27.22
63 113890_15_0 46.34
73 47266_15_0 31.34
46 B.Botev 7 179442_15_0 49.70 2:20.18
17 162018_15_0 31.70
73 175330_15_0 58.78
1 M.Garbolewski 17 37970_0_0 37.31 2:28.88
21 32850_0_0 25.31
54 32834_0_0 19.31
59 20546_0_0 19.31
73 37954_0_0 31.31
111 141474_15_0 16.33

Average Lap and Stability

Name Average Lap Stability
Sort: Time Veloc. [km/h] Laps Difference [s]
First lap isn't considered for std. deviation.
3 J.Letteriello 1:05.65 163.37 111 23.75
33 Y.Laprevotte 1:02.66 171.17 140 23.81
66 N.Mangani 1:03.12 169.93 139 23.82
27 T.Wilber 1:03.08 170.03 139 23.92
34 K. Motiejuitis 1:02.64 171.24 140 24.04
63 G.Pucėta 1:03.98 167.65 123 24.19
720 J.Lavrikov 1:02.64 171.24 140 24.19
91 J.Cameron 1:03.58 168.71 138 24.20
21 M.Kingsbury 1:02.67 171.15 140 24.20
510 E.Harmon 1:03.08 170.04 139 24.30
14 B.Goga 1:02.68 171.14 140 24.32
96 R.Kronpušs 1:03.05 170.12 139 24.47
69 J.Sedgwick 1:02.65 171.21 140 24.51
19 P.Wdowiarz 1:02.64 171.23 140 24.57
1 M.Garbolewski 1:03.56 168.75 138 24.62
25 R.Kingsbury 1:03.61 168.62 138 24.76
7 M.Wentjärvi 1:02.62 171.30 140 24.78
911 J.Teien 1:02.60 171.35 140 24.80
17 N.Lamothe 1:02.62 171.28 140 24.87
77 M.Velikov 1:02.63 171.25 140 24.87
32 P.Hall 1:02.65 171.22 140 24.90
420 R.Majoor 1:02.63 171.27 140 24.93
991 S.Martin 1:02.67 171.16 140 24.98
777 R.Friskopps 1:02.60 171.35 140 25.08
28 Z.Cagaš 1:03.51 168.88 138 25.10
999 J Bento 1:07.67 158.50 96 25.11
9 P.Diaz 1:02.62 171.30 140 25.11
46 B.Botev 1:03.06 170.08 139 25.77
15 J.Telkkälä 1:27.84 122.11 16 27.45

Sector Times

Name Best Sector 1 Best Sector 2 Best Possibe Lap Best Lap
Sort: Time Gap [s] Lap Time Gap [s] Lap Time Gap [s] Time Gap [s] Lap
Combined Best Lap: 47.34
777 R.Friskopps 16.58 0.10 133 30.86 --- 123 47.44 0.01 47.45 --- 123
911 J.Teien 16.58 0.10 123 30.87 0.01 123 47.45 --- 47.45 --- 123
34 K. Motiejuitis 16.48 --- 80 30.97 0.11 81 47.45 0.07 47.52 0.07 80
420 R.Majoor 16.57 0.09 136 30.96 0.10 30 47.53 0.04 47.57 0.12 136
17 N.Lamothe 16.56 0.08 136 30.95 0.09 132 47.51 0.06 47.57 0.12 136
7 M.Wentjärvi 16.58 0.10 116 30.94 0.08 134 47.52 0.08 47.60 0.15 134
9 P.Diaz 16.57 0.09 116 30.93 0.07 134 47.50 0.10 47.60 0.15 80
77 M.Velikov 16.56 0.08 85 30.93 0.07 70 47.49 0.12 47.61 0.16 70
19 P.Wdowiarz 16.56 0.08 85 31.06 0.20 110 47.62 0.05 47.67 0.22 85
25 R.Kingsbury 16.55 0.07 110 31.00 0.14 109 47.55 0.12 47.67 0.22 109
33 Y.Laprevotte 16.58 0.10 85 31.10 0.24 85 47.68 --- 47.68 0.23 85
1 M.Garbolewski 16.63 0.15 32 30.96 0.10 127 47.59 0.12 47.71 0.26 127
63 G.Pucėta 16.61 0.13 90 31.00 0.14 105 47.61 0.12 47.73 0.28 110
21 M.Kingsbury 16.65 0.17 122 31.03 0.17 120 47.68 0.05 47.73 0.28 119
46 B.Botev 16.66 0.18 42 31.00 0.14 70 47.66 0.07 47.73 0.28 119
28 Z.Cagaš 16.68 0.20 130 31.06 0.20 130 47.74 --- 47.74 0.29 130
991 S.Martin 16.64 0.16 106 31.00 0.14 105 47.64 0.11 47.75 0.30 110
720 J.Lavrikov 16.61 0.13 133 31.05 0.19 52 47.66 0.09 47.75 0.30 133
32 P.Hall 16.64 0.16 122 31.04 0.18 44 47.68 0.07 47.75 0.30 32
69 J.Sedgwick 16.64 0.16 112 31.07 0.21 113 47.71 0.06 47.77 0.32 109
3 J.Letteriello 16.70 0.22 42 31.11 0.25 48 47.81 0.08 47.89 0.44 48
27 T.Wilber 16.62 0.14 126 31.32 0.46 123 47.94 0.02 47.96 0.51 126
91 J.Cameron 16.73 0.25 98 31.24 0.38 98 47.97 --- 47.97 0.52 98
96 R.Kronpušs 16.82 0.34 135 31.25 0.39 70 48.07 0.05 48.12 0.67 134
999 J Bento 16.71 0.23 97 31.28 0.42 80 47.99 0.29 48.28 0.83 96
14 B.Goga 16.84 0.36 132 31.36 0.50 30 48.20 0.10 48.30 0.85 30
510 E.Harmon 16.83 0.35 41 31.39 0.53 94 48.22 0.11 48.33 0.88 41
66 N.Mangani 16.96 0.48 92 31.53 0.67 86 48.49 0.06 48.55 1.10 91
15 J.Telkkälä 17.00 0.52 15 31.49 0.63 14 48.49 0.14 48.63 1.18 14

Flags

Name Yellows Caused Blues Seen
31 cars caused 2899 yellow and 13 cars got 262 blue flags.
777 R.Friskopps 80 0
911 J.Teien 113 0
7 M.Wentjärvi 89 0
9 P.Diaz 93 0
17 N.Lamothe 111 0
420 R.Majoor 98 0
77 M.Velikov 97 0
720 J.Lavrikov 112 0
34 K. Motiejuitis 88 0
19 P.Wdowiarz 106 0
32 P.Hall 88 0
69 J.Sedgwick 101 0
33 Y.Laprevotte 93 0
991 S.Martin 114 20
21 M.Kingsbury 104 0
14 B.Goga 97 7
96 R.Kronpušs 98 23
46 B.Botev 107 7
510 E.Harmon 113 13
27 T.Wilber 123 14
66 N.Mangani 105 29
28 Z.Cagaš 87 22
1 M.Garbolewski 111 41
91 J.Cameron 105 35
25 R.Kingsbury 117 10
63 G.Pucėta 116 9
3 J.Letteriello 97 32
999 J Bento 103 0
15 J.Telkkälä 27 0
Sigitas Šakys 2 0
Jonathan Palmer 4 0

Penalties

Name Lap Description
5 cars got a total of 9 penalties.
720 J.Lavrikov 66 DT (Admin)
68 DT Cleared
991 S.Martin 73 DT (Speeding)
75 (Admin)
21 M.Kingsbury 73 DT (Speeding)
74 (Admin)
91 J.Cameron 78 DT (Admin)
80 DT Cleared
126 DT (Admin)
129 DT Cleared
3 J.Letteriello 82 DT (Admin)
85 DT Cleared
112 DT (Speeding)

Lap by Lap Analysis

Lap 777 R.Friskopps 911 J.Teien 7 M.Wentjärvi 9 P.Diaz 17 N.Lamothe 420 R.Majoor 77 M.Velikov 720 J.Lavrikov 34 K. Motiejuitis 19 P.Wdowiarz 32 P.Hall 69 J.Sedgwick 33 Y.Laprevotte 991 S.Martin 21 M.Kingsbury 14 B.Goga 96 R.Kronpušs 46 B.Botev 510 E.Harmon 27 T.Wilber 66 N.Mangani 28 Z.Cagaš 1 M.Garbolewski 91 J.Cameron 25 R.Kingsbury 63 G.Pucėta 3 J.Letteriello 999 J Bento 15 J.Telkkälä Sigitas Šakys Jonathan Palmer
Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph
Total 2h 26:03.43 2h 26:03.47 2h 26:06.22 2h 26:06.37 2h 26:07.45 2h 26:07.54 2h 26:08.74 2h 26:09.21 2h 26:09.42 2h 26:09.87 2h 26:10.36 2h 26:10.86 2h 26:12.70 2h 26:13.35 2h 26:13.76 2h 26:14.54 2h 26:04.17 2h 26:05.81 2h 26:08.00 2h 26:08.40 2h 26:13.71 2h 26:04.70 2h 26:11.47 2h 26:13.87 2h 26:18.35 2h 11:09.59 2h 01:27.56 1h 48:16.51 23:25.39 0.00 0.00
+ 0.04 + 2.79 + 2.94 + 4.02 + 4.11 + 5.31 + 5.78 + 5.99 + 6.44 + 6.93 + 7.43 + 9.27 + 9.92 + 10.33 + 11.11 + 1 Lap + 1 Lap + 1 Lap + 1 Lap + 1 Lap + 2 Laps + 2 Laps + 2 Laps + 2 Laps + 17 Laps + 29 Laps + 44 Laps + 124 Laps + 140 Laps + 140 Laps
100%: 47.45 101%: 47.92 103%: 48.87 105%: 49.82 107%: 50.77 >107%: >50.77 Pitstop Takeover Penalty Lap Rejoin
1 1:59.73 2:11.31 2:05.30 2:00.08 2:02.33 2:00.53 2:02.75 2:10.92 2:07.96 2:01.89 1:58.55 2:10.60 2:04.83 2:11.81 2:03.62 2:05.77 2:01.36 2:08.60 2:09.07 2:15.40 2:14.35 2:07.05 2:12.23 2:07.40 2:10.15 2:09.74 6:13.38 2:13.11 2:57.37    
2 1:51.14 1:54.89 1:50.52 1:51.05 1:50.80 1:51.04 1:50.83 1:54.71 1:51.02 1:50.61 1:51.56 1:54.78 1:50.50 1:54.69 1:50.68 1:50.56 1:50.73 1:52.50 1:52.65 1:52.81 1:53.57 1:49.47 1:54.98 1:50.44 1:54.86 1:53.91 49.43 1:54.51 1:11.78    
3 1:50.14 1:46.78 1:49.29 1:50.36 1:50.14 1:50.39 1:49.87 1:46.92 1:49.90 1:50.34 1:50.19 1:46.88 1:49.24 1:47.01 1:49.68 1:49.63 1:50.33 1:48.74 1:48.19 1:48.23 1:47.90 1:51.79 1:46.64 1:50.70 1:46.52 1:47.37 49.32 1:47.17 1:48.74    
4 1:48.58 1:47.54 1:48.48 1:48.58 1:48.13 1:48.18 1:48.15 1:47.60 1:47.22 1:48.14 1:49.22 1:46.85 1:48.97 1:47.75 1:48.32 1:48.30 1:48.15 1:47.18 1:47.52 1:46.84 1:47.12 1:46.51 1:47.78 1:46.42 1:47.87 1:47.37 1:27.30 1:47.63 1:46.71    
5 1:47.62 1:38.45 1:44.27 1:47.09 1:46.40 1:47.18 1:46.14 1:39.18 1:42.45 1:46.66 1:47.51 1:39.73 1:44.61 1:38.23 1:45.60 1:44.02 1:47.08 1:41.33 1:41.23 1:36.47 1:37.32 1:43.58 1:37.43 1:43.29 1:39.60 1:40.29 1:19.93 1:37.53 1:34.93    
6 53.75 58.88 54.11 52.26 54.62 54.03 1:00.64 1:17.68 1:30.23 53.91 52.15 1:20.18 59.42 2:35.82 1:08.53 1:17.27 1:22.12 1:16.90 1:19.50 1:14.58 1:17.12 56.42 57.77 54.70 1:08.03 1:17.20 2:05.70 1:16.86 1:00.94    
7 1:42.61 1:38.83 1:42.50 1:43.61 1:42.45 1:42.47 1:38.81 1:23.21 1:57.55 1:42.51 1:43.35 2:08.11 1:38.90 1:56.31 2:07.62 1:37.41 2:15.30 2:24.62 2:09.55 1:56.33 1:23.04 1:40.87 1:39.40 1:42.36 1:58.95 1:23.72 2:00.36 1:56.09 1:38.48    
8 1:48.47 1:50.86 1:48.64 1:48.50 1:48.61 1:48.45 1:51.23 1:49.98 1:09.00 1:48.54 1:48.55 1:08.65 1:50.74 1:50.17 1:20.87 2:15.05 1:02.76 1:07.46 1:08.63 1:21.61 1:50.27 1:50.06 1:49.91 1:48.58 1:25.92 1:50.30 1:00.71 1:20.05 1:50.49    
9 1:51.89 1:51.31 1:51.81 1:51.69 1:51.93 1:52.07 1:50.88 1:50.76 1:47.94 1:52.07 1:51.43 1:48.28 1:51.28 1:49.06 1:48.55 1:18.39 1:47.11 1:38.36 1:48.15 1:50.21 1:50.64 1:50.89 1:50.99 1:52.24 1:50.31 1:50.84 49.04 1:50.07 1:50.98    
10 1:49.87 1:48.63 1:49.89 1:50.13 1:49.85 1:49.76 1:48.48 1:48.50 1:50.37 1:49.81 1:50.40 1:49.96 1:48.78 1:44.01 1:49.55 1:49.70 1:49.89 1:49.82 1:49.95 1:49.21 1:48.80 1:49.64 1:49.66 1:49.52 1:49.19 1:48.39 1:01.41 1:49.36 1:48.51    
11 1:46.33 1:44.10 1:45.86 1:46.57 1:45.60 1:46.14 1:43.92 1:42.74 1:40.46 1:46.09 1:46.86 1:40.26 1:44.28 52.69 1:40.91 1:38.82 1:39.96 1:39.16 1:40.26 1:42.00 1:42.42 1:44.94 1:44.65 1:45.32 1:41.76 1:42.70 1:38.36 1:41.94 1:42.69    
12 51.52 51.79 51.68 51.62 51.56 51.50 52.16 51.74 51.29 51.70 51.69 51.03 52.06 49.05 51.30 52.04 51.67 51.94 52.38 51.80 52.86 51.91 51.86 51.53 51.62 51.84 51.41 51.96 52.42    
13 48.17 48.04 48.48 48.18 48.49 48.18 48.72 48.70 48.71 48.42 48.20 49.23 48.88 49.35 48.79 49.76 49.85 48.63 49.36 49.42 50.73 49.04 48.05 48.48 49.02 49.33 48.82 50.15 48.93    
14 48.29 47.94 48.20 48.30 48.21 48.27 48.55 48.57 48.63 48.27 48.22 48.57 48.83 51.10 48.60 49.39 48.53 48.39 49.13 48.55 49.16 48.68 47.93 48.21 48.74 48.53 48.39 49.41 48.63    
15 48.00 48.54 48.11 47.99 48.48 47.99 48.34 48.34 48.68 48.11 48.06 48.55 48.32 1:01.27 48.37 50.93 48.33 48.77 53.28 49.17 51.56 48.69 48.46 48.50 48.38 48.35 48.50 1:03.68 48.65    
16 50.55 55.36 54.93 50.00 54.75 52.98 54.73 54.93 1:02.96 52.66 49.00 1:02.85 1:06.50 1:26.64 59.58 1:00.11 1:02.12 1:14.57 1:01.77 1:02.28 59.89 1:15.19 1:08.56 56.20 56.44 55.09 1:02.56 59.45 55.14    
17 1:40.17 1:35.43 1:36.03 1:40.15 1:36.02 1:37.97 2:08.16 1:35.20 1:27.01 1:37.84 1:40.67 1:27.35 1:26.92 1:47.53 1:30.49 1:27.03 1:53.38 2:03.86 1:24.83 1:27.46 1:26.65 2:05.81 2:14.48 1:35.55 1:33.06 1:35.03 1:27.48 1:18.46      
18 1:50.99 1:50.97 1:50.85 1:51.21 1:50.91 1:51.18 1:24.65 1:50.76 1:50.51 1:51.07 1:51.45 1:50.45 1:50.25 54.25 1:50.45 1:49.75 1:26.83 1:09.28 1:48.78 1:50.59 1:50.21 1:07.01 1:07.05 1:50.62 1:50.73 1:50.73 1:50.54 1:47.67      
19 1:46.99 1:46.01 1:46.32 1:47.07 1:46.24 1:46.60 1:41.35 1:45.64 1:44.49 1:46.52 1:47.18 1:44.16 1:43.70 52.93 1:44.76 1:43.57 1:42.76 1:39.16 1:43.21 1:44.03 1:43.80 1:40.90 1:40.95 1:45.92 1:45.01 1:45.50 1:44.02 1:43.36      
20 51.77 51.99 52.12 51.85 52.01 51.96 53.47 52.78 53.88 51.97 51.83 52.21 53.59 54.40 53.22 54.02 1:05.30 54.21 53.82 53.91 54.84 57.87 58.98 52.27 53.07 51.82 52.36 55.35      
21 1:43.29 1:44.65 1:44.10 1:43.13 1:44.44 1:43.27 1:46.45 1:45.28 1:45.75 1:43.38 1:42.94 1:45.28 1:45.79 1:47.04 1:46.15 1:45.97 2:14.69 1:46.00 1:45.75 1:45.83 1:46.47 2:21.13 2:12.56 1:45.05 1:45.95 1:44.71 1:45.54 1:46.37      
22 1:49.89 1:49.87 1:49.28 1:49.80 1:49.39 1:50.01 1:50.16 1:49.33 1:49.55 1:49.92 1:49.92 1:49.22 1:50.63 1:50.56 1:49.85 1:50.74 1:15.32 1:51.18 1:50.76 1:50.73 1:50.04 1:15.75 1:22.41 1:49.63 1:49.19 1:49.86 1:49.24 1:51.19      
23 1:46.21 1:44.68 1:45.76 1:46.59 1:45.37 1:46.02 1:41.20 1:43.92 1:42.22 1:45.97 1:46.76 1:44.06 1:40.89 1:39.55 1:42.19 1:40.96 1:38.97 1:39.68 1:41.01 1:41.04 1:41.21 1:39.09 1:39.14 1:44.28 1:43.12 1:44.45 1:43.50 1:39.89      
24 51.41 51.15 51.19 51.47 51.35 51.38 50.82 51.37 51.64 51.23 51.51 52.01 51.41 50.93 51.25 51.17 50.83 50.95 51.21 51.31 51.55 50.96 50.44 51.49 51.37 51.17 51.24 51.75      
25 48.13 48.05 48.09 48.12 48.05 48.43 49.07 48.97 48.89 47.97 48.12 48.89 48.90 48.76 49.14 49.19 49.82 48.44 49.20 49.02 49.25 48.82 48.33 49.21 49.14 48.14 48.64 49.28      
26 48.22 48.12 48.22 48.24 48.12 48.11 48.50 48.38 48.51 49.62 48.25 48.85 48.92 48.66 48.48 51.87 48.38 48.37 48.93 48.75 49.70 48.76 48.17 48.14 48.48 48.92 48.64 49.20      
27 48.00 47.98 48.29 47.99 48.23 48.13 48.37 48.44 50.00 48.58 47.98 48.47 48.49 48.40 48.15 49.40 48.82 48.41 49.31 48.79 49.09 48.59 48.19 48.42 48.14 48.57 48.80 49.43      
28 47.98 47.96 47.93 47.98 47.86 47.96 48.25 48.17 49.24 48.19 47.99 48.69 48.55 48.59 48.29 48.50 48.49 48.26 48.70 48.71 48.89 48.53 48.33 48.19 48.28 48.20 48.94 48.95      
29 47.95 47.91 47.94 47.94 47.93 47.90 48.17 48.88 48.46 48.25 47.95 48.60 48.43 48.56 48.77 48.56 48.59 48.71 48.76 49.09 48.88 48.58 48.82 50.43 48.79 48.81 48.65 48.68      
30 47.96 47.68 47.79 47.98 47.78 47.69 48.56 48.83 48.37 48.50 47.97 48.62 48.74 48.44 48.42 48.30 48.41 48.25 48.56 48.60 48.96 48.44 48.51 49.16 48.35 48.82 48.29 48.68      
31 47.88 47.88 48.01 47.87 48.00 47.89 49.12 48.35 48.56 48.52 47.88 50.08 49.26 48.67 48.26 48.51 48.51 48.59 48.67 48.54 48.79 48.49 48.17 49.24 48.31 48.82 48.56 48.55      
32 47.75 47.75 47.94 47.76 47.95 47.75 48.46 48.44 48.21 48.36 47.75 48.29 48.43 48.49 48.07 48.43 48.42 48.35 48.51 48.26 48.72 48.49 48.20 49.88 48.09 48.78 48.51 48.44      
33 47.85 47.85 47.91 47.85 48.02 47.86 48.11 48.40 48.15 48.45 47.85 48.46 48.69 48.63 48.28 48.50 48.47 48.40 48.64 48.76 48.63 48.46 48.52 49.14 48.26 49.23 48.63 48.61      
34 47.87 47.86 48.04 47.88 47.93 48.04 48.57 48.40 48.14 48.51 47.86 49.02 48.48 48.71 48.12 48.51 48.42 48.67 48.68 49.79 48.74 48.66 48.21 49.16 48.14 49.13 48.49 48.64      
35 47.84 47.85 48.02 47.81 48.01 48.28 48.36 48.30 49.01 48.60 47.84 48.63 48.96 48.58 48.19 48.52 48.66 48.45 48.61 52.15 49.02 48.64 48.21 49.07 48.11 49.36 48.42 48.91      
36 47.85 47.85 47.91 47.86 47.93 48.16 48.23 48.34 48.60 48.36 47.86 48.64 48.62 48.57 48.36 48.55 48.41 48.11 48.59 48.77 48.96 48.51 48.09 50.23 48.45 48.70 48.47 49.02      
37 47.80 47.79 47.95 47.82 47.96 47.79 48.11 48.20 48.74 48.14 47.81 48.52 48.64 48.48 48.05 48.65 48.58 48.12 48.46 48.70 1:02.29 48.50 48.06 51.54 48.05 48.65 48.49 57.27      
38 47.92 47.97 48.24 47.91 48.01 48.11 48.16 48.34 48.36 48.14 47.91 48.52 49.03 48.43 49.10 48.43 48.55 48.17 48.44 48.56 51.74 48.55 49.59 49.61 48.43 48.83 48.98 49.40      
39 47.91 47.88 49.30 47.88 48.39 48.67 47.90 48.26 48.52 48.33 47.88 48.59 48.66 48.51 48.93 48.50 48.39 47.89 48.51 48.56 49.44 48.53 48.64 49.61 48.34 49.00 48.06 49.24      
40 48.05 48.02 48.35 47.91 48.14 48.14 48.04 48.11 48.68 48.12 47.91 48.39 48.72 48.63 48.09 48.54 48.45 48.06 48.62 48.53 49.28 48.64 48.53 49.70 48.12 48.72 48.27 49.27      
41 48.12 48.13 48.29 47.92 48.05 48.08 47.95 47.86 48.49 47.99 47.92 48.36 48.51 48.35 47.86 48.72 48.55 47.92 48.33 48.37 48.97 48.48 48.44 49.50 47.98 48.50 48.15 49.16      
42 47.74 47.84 48.22 47.88 47.85 47.82 47.91 47.91 48.79 48.06 47.87 48.43 48.94 48.97 47.93 48.60 48.55 48.66 48.97 48.55 48.82 48.66 48.45 49.38 48.07 48.94 47.91 49.23      
43 48.21 48.11 48.29 48.46 47.97 47.97 48.35 47.93 48.36 47.82 48.28 48.96 48.90 48.70 47.91 48.56 48.99 48.54 48.73 48.62 49.15 48.74 48.50 49.45 47.83 48.72 48.04 49.20      
44 48.04 48.03 48.17 47.74 47.86 47.86 48.26 48.01 48.56 47.95 47.93 48.50 49.36 49.24 48.01 48.71 48.62 48.16 49.38 48.84 49.06 48.61 48.50 49.37 47.94 48.67 48.04 49.63      
45 48.03 48.04 48.22 47.82 48.03 48.03 48.28 47.87 48.93 47.98 47.82 48.59 48.89 48.52 47.88 48.64 48.50 47.99 49.02 48.78 48.77 48.58 48.49 49.36 47.98 48.86 48.13 49.37      
46 47.92 47.92 48.19 48.10 47.88 47.87 48.28 47.94 48.69 48.08 48.11 48.41 48.69 48.35 47.96 48.50 48.45 48.29 48.84 48.54 48.79 48.95 48.52 49.21 48.10 48.71 48.20 49.50      
47 47.83 47.83 48.18 47.96 47.99 47.99 48.31 48.05 48.12 48.09 47.95 48.10 48.74 48.47 48.02 48.55 48.58 48.20 49.28 48.78 48.95 1:07.90 48.39 49.36 48.15 48.47 48.39 49.62      
48 48.05 48.07 48.13 48.24 47.91 47.92 48.14 48.20 48.04 48.07 48.02 48.06 48.89 48.25 48.43 48.58 48.84 47.90 49.21 48.50 49.00 49.04 48.33 49.53 47.99 48.18 47.89 49.53      
49 48.10 48.10 48.21 48.09 47.93 47.92 48.67 48.28 48.18 48.12 48.30 48.18 48.89 48.65 48.05 48.68 48.83 48.49 49.14 48.48 48.79 48.70 48.39 49.42 48.14 48.50 48.68 49.08      
50 47.99 48.03 48.28 47.97 47.95 47.96 48.17 48.10 48.32 48.19 47.99 48.61 48.89 49.38 48.11 48.57 48.85 48.14 48.91 48.50 48.86 48.71 48.46 49.38 48.41 48.95 48.83 49.45      
51 47.93 47.89 48.24 47.96 47.94 47.93 47.86 48.01 48.95 48.50 47.96 48.67 48.58 48.56 48.01 48.63 48.95 47.85 48.77 48.47 48.72 48.74 48.54 49.33 48.69 49.13 48.77 49.50      
52 48.15 48.17 48.31 48.18 47.90 47.91 47.87 47.83 48.52 48.51 48.30 48.94 48.85 48.75 47.99 48.43 49.04 47.89 49.08 49.89 49.68 49.35 48.67 49.89 48.21 48.98 48.60 49.80      
53 53.19 53.51 49.61 52.85 52.74 52.83 54.16 48.48 1:06.57 49.57 54.39 1:06.96 1:05.78 1:04.08 1:04.64 1:03.76 1:05.61 1:00.10 1:05.34 1:09.98 51.47 53.30 57.07 50.16 50.60 1:04.29 59.03 52.56      
54 1:52.95 1:53.35 1:53.26 2:10.79 1:56.19 1:49.78 1:19.48 2:15.22 1:05.17 1:26.43 1:30.39 1:45.08 2:03.04 1:04.27 1:39.65 1:04.12 1:40.33 1:13.73 1:00.65 55.50 53.98 55.67 1:40.94 2:03.87 2:05.80 1:04.24 1:41.26 1:51.11      
55 1:37.27 1:36.77 1:35.26 1:23.21 1:34.32 1:38.23 1:51.49 1:15.94 1:47.64 2:18.01 1:52.01 1:16.63 1:02.14 1:47.88 1:31.35 1:48.33 1:16.72 1:51.71 1:48.29 2:21.60 1:47.13 1:47.88 1:30.18 1:00.18 1:21.45 1:48.05 1:31.08 1:03.39      
56 1:48.85 1:48.89 1:48.98 1:48.39 1:49.08 1:49.98 1:50.06 1:47.75 1:49.88 1:35.19 1:50.16 1:47.49 1:42.15 1:49.72 1:48.80 1:49.62 1:48.11 1:50.23 1:49.66 1:24.43 1:49.76 1:49.55 1:48.36 1:41.65 1:48.19 1:49.83 1:48.23 1:42.78      
57 1:44.49 1:44.56 1:44.36 1:43.10 1:44.35 1:44.30 1:47.77 1:42.08 1:46.96 1:41.26 1:47.89 1:42.59 1:41.64 1:46.90 1:44.25 1:46.11 1:42.89 1:47.33 1:45.76 1:41.48 1:45.16 1:45.50 1:43.81 1:41.54 1:43.11 1:46.47 1:44.10 1:42.19      
58 1:04.35 1:04.08 1:04.36 1:08.29 1:04.83 1:03.37 58.37 1:20.62 1:01.89 1:09.78 54.85 1:08.45 1:10.84 1:01.95 1:05.56 1:02.52 1:09.11 56.73 1:03.97 1:10.86 1:05.66 1:03.00 1:13.74 1:09.46 1:12.89 1:02.11 1:06.30 1:11.66      
59 1:33.08 1:33.10 1:33.00 1:30.49 1:32.93 1:33.36 1:36.65 1:43.44 1:33.58 1:29.42 1:39.35 1:30.51 1:29.30 1:33.91 1:32.56 1:33.91 1:30.18 1:37.56 1:33.54 1:29.08 1:32.94 1:33.49 1:55.31 1:29.49 2:13.59 1:34.02 1:32.34 1:28.99      
60 1:46.52 1:46.72 1:46.54 1:45.65 1:46.31 1:46.42 1:44.85 1:23.87 1:44.95 1:45.85 1:44.69 1:46.11 1:46.07 1:44.73 1:46.04 1:46.18 1:46.01 1:44.85 1:46.39 1:45.95 1:46.51 1:46.41 1:19.60 1:45.83 1:06.11 1:45.60 1:45.59 1:46.00      
61 1:38.35 1:38.21 1:38.27 1:38.26 1:38.46 1:39.08 1:42.83 1:36.65 1:42.11 1:37.11 1:43.59 1:37.18 1:36.53 1:41.94 1:38.39 1:40.34 1:37.23 1:43.11 1:38.86 1:36.30 1:38.50 1:39.88 1:34.83 1:37.06 1:31.30 1:40.85 1:38.31 1:37.17      
62 52.95 52.89 55.29 53.70 52.82 51.84 52.24 54.32 51.98 53.49 51.86 1:10.21 54.91 53.47 52.87 53.71 59.31 52.04 53.54 59.82 55.73 53.81 54.27 52.38 54.73 53.17 53.53 58.88      
63 1:41.56 1:41.83 1:44.51 1:44.12 1:43.16 1:40.91 1:40.80 1:44.24 1:40.90 1:44.42 1:40.34 2:35.82 1:44.25 1:40.40 1:43.66 1:42.47 2:10.05 1:40.53 1:42.19 1:40.65 2:31.20 1:43.12 1:44.08 1:43.84 1:44.35 1:39.96 1:44.03 1:40.68      
64 1:49.44 1:49.17 1:47.83 1:48.11 1:48.53 1:49.85 1:49.84 1:47.59 1:49.85 1:47.69 1:50.00 1:00.61 1:47.39 1:49.80 1:48.10 1:48.88 1:20.71 1:49.11 1:48.90 1:47.63 1:05.22 1:48.49 1:47.58 1:48.07 1:47.55 1:49.81 1:48.02 1:47.54      
65 1:46.44 1:46.44 1:43.74 1:43.84 1:45.44 1:47.71 1:48.02 1:42.82 1:47.95 1:43.59 1:48.68 1:25.30 1:43.11 1:47.23 1:45.25 1:45.97 1:41.40 1:48.93 1:46.37 1:41.85 1:40.86 1:45.69 1:43.38 1:44.89 1:42.82 1:47.56 1:44.10 1:42.52      
66 51.28 51.16 51.25 51.32 51.17 51.32 51.67 50.80 51.37 50.93 51.50 50.48 51.05 51.86 51.21 54.10 51.33 51.71 55.23 51.36 51.57 51.98 50.72 51.91 50.88 52.00 51.52 51.45      
67 48.01 48.07 48.56 48.61 48.78 48.30 48.37 1:06.38 48.33 48.58 48.32 48.87 49.17 50.35 48.71 50.10 48.91 48.40 50.61 49.36 49.87 48.98 50.76 49.10 49.02 48.97 50.83 49.58      
68 48.27 48.21 48.20 48.19 47.92 48.60 48.59 58.54 47.97 47.99 48.22 48.47 49.18 49.06 47.93 49.13 48.62 47.90 49.68 50.96 49.22 48.67 49.18 49.10 48.78 48.79 1:07.82 48.71      
69 48.08 48.08 48.10 48.10 47.93 48.06 48.07 48.40 47.99 47.88 48.02 48.61 48.58 48.77 47.92 48.76 48.47 47.77 50.30 48.90 48.91 48.64 48.47 48.55 48.48 48.94 48.56 48.50      
70 47.69 47.68 47.88 47.88 48.07 47.90 47.61 48.32 48.43 48.41 48.26 48.16 48.45 48.94 48.47 48.64 48.17 47.78 49.32 48.43 48.77 48.58 48.34 48.18 48.31 48.48 48.56 48.40      
71 47.84 47.85 48.12 48.14 48.53 48.16 48.30 48.23 48.49 48.54 48.28 48.13 48.70 49.06 48.43 48.77 48.88 47.77 48.93 48.59 48.94 48.37 48.42 48.79 48.94 48.73 48.46 48.64      
72 49.15 49.25 49.62 49.26 50.25 49.49 49.26 48.25 50.49 1:02.76 49.36 1:01.58 52.93 53.06 1:04.25 55.96 54.13 48.85 54.35 53.40 57.34 49.42 54.38 54.63 52.09 49.66 48.60 54.10      
73 1:44.26 1:44.34 1:43.11 1:43.20 1:43.18 1:43.83 2:08.68 1:21.40 1:43.09 2:02.70 2:04.06 2:14.36 1:39.56 2:18.25 2:10.64 2:29.36 1:38.59 2:52.18 2:21.64 1:38.10 1:34.16 2:22.28 2:16.93 2:17.38 1:40.37 1:43.88 2:20.55 1:39.11      
74 1:49.12 1:49.22 1:48.95 1:48.91 1:48.89 1:49.13 1:33.27 1:48.16 1:49.06 1:24.17 1:36.76 1:14.36 1:48.88 1:16.70 1:16.10 1:02.56 1:48.92 1:08.39 1:06.51 1:48.39 1:48.37 1:16.51 1:16.54 1:16.21 1:48.97 1:48.98 1:03.37 1:48.36      
75 1:48.42 1:48.26 1:48.68 1:48.64 1:48.67 1:48.38 1:46.07 1:47.28 1:48.46 1:45.82 1:47.21 1:46.74 1:47.68 1:46.65 2:03.08 1:46.17 1:47.60 1:35.76 1:46.56 1:47.33 1:47.23 1:45.84 1:46.53 1:45.64 1:47.40 1:47.35 1:45.13 1:47.42      
76 1:48.33 1:48.40 1:48.71 1:48.79 1:48.95 1:48.48 1:48.21 1:48.24 1:48.77 1:48.18 1:48.29 1:47.31 1:48.47 1:47.50 1:34.77 1:47.11 1:48.35 1:47.08 1:47.24 1:48.26 1:48.23 1:48.21 1:47.24 1:48.15 1:48.47 1:48.41 1:47.07 1:48.27      
77 1:47.24 1:47.17 1:45.68 1:45.87 1:45.40 1:47.12 1:43.01 1:43.70 1:46.29 1:42.52 1:42.61 1:40.54 1:44.21 1:40.79 1:39.90 1:40.30 1:44.22 1:40.14 1:40.68 1:44.03 1:44.11 1:41.94 1:41.13 1:41.64 1:44.82 1:45.05 1:40.36 1:44.22      
78 51.57 51.44 51.35 51.37 51.71 52.01 51.23 51.80 51.60 50.94 51.44 51.48 52.12 52.25 51.40 51.43 51.94 51.00 57.72 52.81 53.31 51.12 51.43 50.81 51.49 52.14 51.67 51.99      
79 48.04 48.06 48.01 48.05 48.15 48.32 48.99 49.05 48.22 48.54 48.45 48.85 48.66 49.41 48.54 49.54 49.05 48.45 48.84 49.67 49.48 48.60 48.81 1:07.81 48.21 48.88 48.76 48.83      
80 47.73 47.72 47.61 47.60 47.91 47.91 48.16 48.05 47.52 48.43 48.11 48.05 48.38 48.12 48.05 48.48 48.76 48.25 48.61 49.04 49.14 50.00 48.41 59.32 47.93 48.70 48.05 48.36      
81 47.63 47.63 47.63 47.64 47.87 47.87 47.90 49.45 47.63 48.31 48.22 49.56 48.20 48.47 49.79 49.19 57.57 49.62 49.04 48.87 49.08 49.40 48.49 48.76 48.00 48.59 1:05.42 48.51      
82 47.69 47.68 47.68 47.68 48.22 48.01 48.14 48.37 47.69 48.46 48.19 48.48 48.08 48.40 48.55 48.71 51.33 49.03 48.97 48.93 48.88 49.12 48.26 49.01 47.85 48.78 50.45 48.35      
83 47.62 47.63 47.85 47.75 47.93 47.92 48.32 48.69 48.40 48.21 48.27 48.39 48.35 48.99 48.45 48.90 48.43 48.59 49.25 48.87 48.64 48.66 48.04 48.73 47.93 48.04 49.01 48.35      
84 47.74 47.76 47.92 48.03 47.84 47.84 47.92 48.24 48.26 47.95 48.18 48.19 48.13 48.40 48.54 48.47 48.26 48.48 48.86 48.58 48.71 48.69 48.52 48.52 47.84 48.36 1:05.81 48.67      
85 47.80 47.78 47.76 47.76 47.72 47.68 47.69 48.17 48.36 47.67 48.27 48.00 47.68 48.29 48.49 48.52 48.36 48.59 48.68 48.58 48.73 48.50 48.19 48.45 47.72 48.60 58.74 48.44      
86 47.62 47.62 47.97 47.97 48.18 47.97 47.97 48.15 48.50 47.98 47.98 48.29 47.99 48.29 48.56 48.74 48.27 48.34 48.79 48.64 48.58 48.95 48.41 48.50 48.19 48.77 48.42 48.53      
87 47.49 47.49 48.10 48.23 48.31 48.28 48.68 48.21 48.33 48.18 48.61 48.24 48.55 48.30 48.33 48.64 48.71 48.23 48.65 48.55 48.77 48.76 48.18 48.57 48.57 48.38 49.44 48.92      
88 47.70 47.71 47.95 47.97 48.08 48.18 48.57 48.38 48.07 48.18 48.63 48.35 48.68 48.34 48.94 48.84 48.44 48.45 48.51 48.49 48.77 48.49 48.23 48.55 48.05 48.82 48.84 48.75      
89 47.91 47.89 48.06 48.05 48.17 48.20 47.98 48.12 48.38 48.27 47.97 48.15 47.97 48.48 48.50 48.62 48.51 48.42 48.81 49.03 48.65 48.66 48.22 48.58 48.48 48.24 48.53 48.98      
90 47.82 47.82 47.93 47.93 48.22 48.59 48.12 48.97 48.52 48.26 48.16 48.68 48.15 48.56 48.48 48.81 48.50 48.56 48.72 48.45 48.57 48.52 48.29 48.67 48.41 48.18 48.33 48.83      
91 47.68 47.69 47.75 47.75 47.79 47.78 48.04 48.63 48.07 48.13 48.02 48.49 48.02 48.27 48.40 48.71 48.32 48.40 48.63 48.41 48.55 48.50 48.10 48.57 48.07 48.45 48.46 48.67      
92 47.73 47.73 47.93 47.92 47.89 47.90 47.87 48.34 48.14 48.24 48.33 48.49 47.92 48.47 48.58 48.35 48.44 48.43 48.85 48.52 48.94 48.35 48.22 48.40 48.14 48.72 48.21 48.61      
93 47.81 47.80 47.80 47.81 47.89 47.88 47.91 48.45 48.26 47.91 48.35 48.48 48.41 48.22 48.78 48.80 48.40 48.27 48.62 49.04 49.03 48.34 48.30 48.43 48.76 48.77 48.40 48.63      
94 47.70 47.71 47.77 47.77 47.85 47.86 48.12 48.02 48.85 48.00 48.39 48.27 48.95 48.39 48.51 48.54 48.28 48.31 48.34 48.71 48.72 48.47 48.34 48.55 48.85 48.29 48.44 48.46      
95 47.80 47.80 47.84 47.84 47.84 47.84 48.59 48.12 48.89 48.09 48.21 48.24 48.25 48.44 48.40 48.50 48.28 48.34 48.43 48.68 48.75 48.93 48.26 48.61 48.70 48.51 49.28 48.47      
96 47.80 47.79 47.88 47.88 47.86 47.86 48.52 48.04 48.44 48.37 48.23 48.06 48.16 48.59 48.39 48.47 48.29 48.30 48.39 48.65 48.64 48.48 48.23 48.67 48.76 48.70 49.14 48.28      
97 47.75 47.76 47.96 47.96 47.78 47.77 48.23 47.84 48.24 48.13 48.20 47.87 48.53 48.37 48.45 48.52 48.42 48.28 48.73 48.64 48.86 48.48 48.24 48.65 48.38 48.46 49.50        
98 47.90 47.90 47.84 47.84 47.76 47.77 48.10 48.28 48.02 48.13 48.23 48.34 48.66 48.42 48.58 48.39 48.55 48.55 48.44 49.02 48.81 48.43 48.17 47.97 48.10 48.63 49.51        
99 47.92 47.91 48.05 48.04 47.73 47.72 47.92 48.05 48.06 48.06 48.25 47.94 48.78 48.32 48.75 48.47 48.46 48.37 48.69 49.14 48.76 48.49 48.19 48.44 47.94 48.44 49.48        
100 47.89 47.89 47.78 47.79 47.66 47.66 47.97 47.76 48.05 48.06 48.30 47.78 48.40 48.18 48.57 48.41 48.35 48.37 48.57 48.53 48.67 48.22 48.20 48.72 47.95 48.46 49.90        
101 47.82 47.85 47.76 47.75 47.75 47.76 48.17 47.95 47.95 47.94 48.28 47.93 48.48 48.38 48.17 48.52 48.41 48.43 48.49 49.27 48.84 48.16 48.47 48.68 48.48 48.50 49.00        
102 48.08 48.11 47.86 47.87 47.85 47.85 48.76 47.94 47.96 47.96 48.18 47.94 48.60 48.06 47.94 48.52 48.21 48.30 48.43 48.92 48.80 47.96 48.20 48.46 48.63 48.05 49.07        
103 47.96 47.90 47.79 47.78 47.82 47.82 48.08 47.92 47.93 47.94 48.24 47.93 48.40 47.88 47.94 48.56 48.30 48.39 48.98 48.70 48.78 47.94 48.13 48.50 47.89 47.90 50.12        
104 47.73 47.73 47.78 47.78 47.86 47.85 47.81 48.11 48.23 48.09 48.27 48.10 48.83 48.23 48.26 48.71 48.34 48.52 48.57 48.51 48.92 48.51 48.50 48.60 47.81 48.22 49.14        
105 47.73 47.73 47.78 47.78 47.74 47.76 47.91 48.45 48.01 48.14 48.24 48.45 48.49 47.77 48.41 48.78 48.30 48.33 48.51 48.57 48.81 48.31 48.43 48.47 47.92 47.77 49.05        
106 47.63 47.64 47.64 47.64 47.88 47.87 47.78 48.05 48.02 48.16 48.24 48.20 48.48 47.78 48.22 48.49 48.22 48.35 48.44 48.65 48.75 48.28 59.30 48.60 48.05 47.83 48.67        
107 47.86 48.19 47.72 47.73 47.80 47.80 48.86 48.11 48.21 47.97 48.25 48.18 48.47 48.08 48.25 48.47 48.28 48.31 48.66 48.87 48.73 48.19 51.55 48.68 48.92 48.02 49.29        
108 48.29 48.16 47.85 47.84 47.85 47.85 48.51 48.32 48.15 48.17 48.23 48.10 48.52 48.08 48.41 48.33 48.39 48.34 48.51 48.56 49.42 48.73 48.50 48.69 48.21 48.35 48.81        
109 48.02 47.81 47.69 47.74 47.76 47.76 47.70 47.77 48.19 48.07 48.21 47.77 48.45 48.55 48.39 48.38 48.59 48.28 48.52 48.97 48.86 48.63 48.28 48.88 47.67 48.31 51.72        
110 47.90 47.92 47.90 47.86 47.75 47.75 47.70 47.88 47.71 47.91 48.13 47.89 48.31 47.75 48.33 48.55 48.41 48.73 49.41 48.84 49.22 48.39 48.25 48.61 47.71 47.73 50.00        
111 47.74 47.73 47.84 47.83 47.78 47.78 47.79 47.79 47.78 47.78 48.24 47.79 48.70 48.34 48.19 48.35 48.45 48.42 49.35 48.52 51.00 48.27 1:36.13 48.57 47.79 48.46 49.14        
112 47.79 47.79 47.70 47.72 47.73 47.72 48.01 47.83 48.05 48.05 48.09 47.83 48.47 48.53 48.33 48.55 48.32 48.45 48.66 48.63 50.10 48.41 58.96 48.63 48.10 48.76          
113 47.77 47.76 47.63 47.62 47.78 47.79 48.53 47.78 47.89 47.89 48.15 47.77 49.31 49.04 48.36 48.48 48.33 48.28 48.57 48.75 50.10 48.35 48.83 48.71 48.29 49.55          
114 47.73 47.73 47.72 47.71 47.79 47.79 48.22 47.94 47.90 47.87 48.16 47.95 48.44 48.43 48.25 48.57 48.32 48.38 48.65 48.93 49.42 48.47 48.49 48.76 48.23 48.83          
115 47.60 47.61 47.86 47.87 47.89 47.88 48.07 47.93 47.98 48.01 48.02 47.99 48.47 48.76 48.37 48.47 48.23 48.67 48.42 48.94 50.85 48.44 48.53 49.53 48.05 51.85          
116 47.77 47.76 47.71 47.70 47.74 47.74 48.06 48.05 48.61 48.29 48.17 48.21 48.29 48.46 48.29 48.64 48.20 48.32 48.57 48.82 49.49 48.58 48.40 48.72 48.05 1:31.17          
117 47.62 47.63 47.67 47.68 47.82 47.83 48.62 48.24 48.37 48.40 48.06 48.01 48.13 48.10 48.21 48.57 48.32 48.21 48.42 48.68 50.25 48.45 47.72 48.98 48.47 1:01.91          
118 47.81 47.81 47.92 47.91 47.95 47.95 48.10 47.81 48.03 48.33 47.84 47.85 48.15 48.15 48.09 48.67 48.48 48.09 48.64 48.56 49.22 48.54 47.81 48.45 48.41 49.69          
119 47.66 47.65 47.91 47.91 47.66 47.66 48.15 48.38 48.18 47.90 48.36 48.37 48.23 48.23 47.73 48.59 48.20 47.73 48.63 48.65 49.20 48.44 47.74 48.16 58.03 49.70          
120 47.77 47.77 47.75 47.77 47.67 47.66 48.28 47.96 48.34 48.21 47.94 47.94 48.09 48.09 47.73 48.52 48.19 47.88 48.56 48.60 49.18 48.38 47.98 48.04 50.59 49.68          
121 47.80 47.80 47.66 47.64 47.73 47.73 48.04 47.80 48.16 48.19 47.80 47.80 47.89 47.90 48.10 48.50 48.28 47.94 51.10 48.52 49.25 48.52 48.37 48.49 50.04 49.97          
122 47.65 47.66 47.77 47.77 47.70 47.71 48.02 47.87 48.21 48.08 47.89 47.88 48.20 48.18 47.89 48.38 48.37 47.90 48.36 48.45 49.17 1:29.75 48.28 51.27 50.86 50.19          
123 47.45 47.45 47.66 47.66 47.59 47.58 48.21 48.16 48.34 48.10 49.86 48.15 48.09 48.26 48.56 48.41 48.31 48.69 48.41 48.22 49.36 58.74 48.72 49.60 50.58 50.51          
124 47.69 47.68 47.77 47.83 47.69 47.70 48.23 48.01 48.30 48.35 48.35 48.00 48.33 48.40 48.78 48.31 48.27 48.40 48.81 48.40 49.26 48.52 48.35 49.42 50.03            
125 47.78 47.79 48.05 47.99 48.07 48.06 48.14 47.78 48.21 48.14 48.26 48.03 48.23 48.25 48.30 48.50 49.55 48.56 48.40 48.42 50.49 48.59 48.37 49.30 50.02            
126 47.80 47.80 47.61 47.62 47.84 47.85 48.30 48.36 48.34 49.21 48.24 48.49 48.34 48.34 48.11 48.45 48.76 48.08 48.33 47.96 50.88 50.49 48.69 49.94 50.26            
127 47.60 47.60 47.71 47.71 47.70 47.70 48.46 48.33 48.51 48.58 48.34 48.56 48.28 48.34 48.56 48.41 48.27 48.58 48.68 48.69 49.57 49.93 47.71 49.65 50.50            
128 47.61 47.60 47.69 47.69 47.71 47.70 48.56 48.25 48.34 48.33 48.27 48.60 48.29 48.23 48.15 48.48 48.13 48.14 48.56 52.31 49.62 49.31 48.26 1:07.21 50.05            
129 47.57 47.57 49.23 49.08 47.82 47.82 47.98 47.99 48.37 48.38 48.18 48.39 48.27 48.07 47.92 48.53 48.17 47.90 48.39 50.03 49.36 48.48 49.65 59.30 1:10.36            
130 47.75 47.76 48.33 48.48 47.79 47.80 47.97 47.96 48.20 48.24 48.30 48.38 48.08 48.27 48.03 48.44 48.18 48.15 48.40 51.31 49.44 47.74 52.50 48.98 50.96            
131 47.63 47.63 47.82 47.83 47.72 47.72 47.92 47.92 48.30 48.29 48.21 48.43 48.18 48.48 48.51 48.30 48.47 48.41 48.67 49.32 49.52 47.83 57.70 49.17 50.68            
132 47.74 47.73 47.64 47.62 47.60 47.60 47.82 47.82 48.27 48.22 48.15 48.40 48.33 48.26 48.47 48.35 48.22 48.31 48.64 49.08 49.81 49.03 49.86 49.44 51.03            
133 47.53 47.54 47.87 47.88 47.76 47.76 47.75 47.75 48.63 48.64 48.15 48.37 48.70 48.41 49.40 48.51 48.30 49.60 49.17 48.73 49.36 48.02 48.49 49.27 50.92            
134 47.75 47.75 47.60 47.60 47.64 47.63 47.77 47.76 48.33 48.38 48.19 48.43 48.14 47.96 49.07 48.30 48.12 49.64 48.93 48.82 49.30 47.95 49.81 49.19 50.95            
135 47.58 47.58 47.68 47.67 47.61 47.61 47.94 47.95 48.59 48.52 48.24 48.56 47.98 48.05 48.44 48.42 48.16 49.58 49.12 48.79 49.63 52.07 1:04.02 49.82 1:08.19            
136 47.76 47.85 47.61 47.61 47.57 47.57 48.20 48.41 49.55 49.68 48.41 48.78 49.09 49.59 48.48 52.31 52.47 1:02.75 50.39 49.17 55.99 1:23.99 1:05.23 1:48.73 2:07.76            
137 51.53 53.39 53.86 54.92 55.13 55.25 50.66 50.58 59.48 1:04.15 1:02.64 1:02.48 57.17 57.59 55.11 1:25.16 1:24.54 1:23.49 1:17.75 1:17.02 1:03.17 2:07.74 1:57.57 1:35.22 1:27.77            
138 1:26.59 1:24.97 1:23.04 1:22.46 1:22.33 1:23.51 1:10.23 1:10.68 1:04.07 1:04.62 1:04.50 1:04.66 1:04.60 1:04.20 1:02.65 2:07.73 2:07.79 2:06.66 2:06.24 2:06.17 1:57.26 1:48.30 1:47.61 1:47.55 1:50.92            
139 2:07.93 2:07.92 2:06.92 2:06.88 2:07.07 2:06.18 2:06.20 2:05.92 2:01.66 1:56.52 1:56.69 1:57.28 1:57.10 1:57.03 1:52.95 1:07.64 1:48.06 1:48.73 1:48.17 1:48.25 1:47.99                    
140 1:48.49 1:48.14 1:48.55 1:48.20 1:48.60 1:48.22 1:48.13 1:48.24 1:47.59 1:47.75 1:47.85 1:47.45 1:48.10 1:48.16 1:52.06 51.27                              

Lap by Lap Chart (click to enlarge)

Race Progress Chart (click to enlarge)