mpRes » Single Event » Kyoto 250 » 5 » Race 3de | en

Kyoto 250 Season 5 - Race 3 (replay) download
Version LfS 0.6B XRT RB4 FZ5 KY1
Time 31.03.2012, 17:01:05
Distance 140 Laps (417.12 km)
Daytime Day
Weather Clear
Wind Low (14.88 km/h)
Statistics Tables

Race Result

Pos. (Start) Name Car Laps Total Time Gap [s] Stops Open Penalties Best Lap Leading Laps LH AU SH BH AC CV ST
31 of 31 cars finished the race.
1 (±0) 77 R.Friskopps XRT 140 2h 12:08.29 1 - 47.84 65 (1-3, 6-50, 83-85, 96-108, 140) X X W
2 (+2) 9 P.Diaz XRT 140 + 0.03 1 - 47.78 63 (51-82, 109-139) X X X W
3 (+6) 83 A.Terho XRT 140 + 1.16 + 1.13 1 - 48.15 0 X X W
4 (+6) 33 Y.Laprevotte XRT 140 + 1.17 + 0.01 1 - 48.02 0 X X W
5 (+24) 05 C.Corns XRT 140 + 1.28 + 0.11 3 - 48.20 0 X X X W
6 (-1) 21 M.Kingsbury XRT 140 + 1.67 + 0.39 1 - 47.78 0 X X X W
7 (-1) 87 N.Puntola XRT 140 + 1.95 + 0.28 1 - 47.83 0 X W
8 (-6) 07 M.Garbolewski XRT 140 + 1.99 + 0.04 1 - 48.07 2 (4-5) X X W
9 (+15) 333 D.Jundt XRT 140 + 1.99 + 0.00 1 - 47.75 0 X X X W
10 (+17) 510 E.Harmon XRT 140 + 2.11 + 0.12 2 - 48.43 0 X X W
11 (+1) 17 N.Lamothe XRT 140 + 2.17 + 0.06 2 - 47.80 0 X X X W
12 (+10) 25 R.Kingsbury XRT 140 + 3.00 + 0.83 2 - 47.79 0 X X X W
13 (-10) 08 P.Krzyżanowski XRT 140 + 3.26 + 0.26 3 - 47.86 0 X X M
14 (+3) 64 M.Kapal XRT 140 + 3.55 + 0.29 0 - 47.90 0 X X W
15 (+8) 69 P.Rozenbajger XRT 139 + 1 Lap + 1 Lap 1 - 47.98 10 (86-95) X X X X W
16 (-3) 93 E.liņš XRT 139 + 1 Lap + 0.29 1 - 48.25 0 X X W
17 (+3) 730 D.Nawrocki XRT 139 + 1 Lap + 0.71 3 - 47.87 0 X W
18 (+12) 52 T.Korený XRT 139 + 1 Lap + 0.45 0 - 48.24 0 X X W
19 (-8) 23 J.Dohnalík XRT 139 + 1 Lap + 4.70 2 - 48.32 0 X X M
20 (-1) 50 B. Holmberg XRT 138 + 2 Laps + 1 Lap 1 - 48.18 0 X X W
21 (-5) 27 Ü.Mikk XRT 138 + 2 Laps + 0.31 2 - 48.17 0 X X W
22 (-1) 96 R.Kronpušs XRT 138 + 2 Laps + 2.21 3 - 48.24 0 X X X W
23 (-16) 58 R.Blauwhoff XRT 137 + 3 Laps + 1 Lap 2 - 48.24 0 X X X W
24 (+4) 74 M.Braksator XRT 137 + 3 Laps + 54.64 3 - 48.23 0 X X W
25 (±0) 121 J.Babowicz XRT 136 + 4 Laps + 1 Lap 4 - 48.23 0 X X X W
26 (-18) 97 Ł.Paszczyk XRT 105 + 35 Laps + 31 Laps 1 - 47.95 0 X X W
27 (-12) 555 R.Suur XRT 70 + 70 Laps + 35 Laps 2 - 48.27 0 X X W
28 (-14) 55 L.Matonis XRT 50 + 90 Laps + 20 Laps 0 - 48.62 0 X X W
29 (-11) 991 S.Martin XRT 5 + 135 Laps + 45 Laps 0 - 1:45.43 0 X X W
30 (+1) Jonathan Palmer RB4 0 + 140 Laps + 5 Laps 0 - 0.00 0 X X X M
31 (-5) 28 Z.Cagaš XRT 0 + 140 Laps + 0.00 0 - 0.00 0 X X W

Pitstops

Name Lap Work Time [s] Total
25 cars made 45 pitstops with a total time of 23:05.82
333 D.Jundt 133 131074_0_0 4.13 4.13
93 E.liņš 130 131074_0_0 5.12 5.12
33 Y.Laprevotte 86 131074_0_0 7.22 7.22
69 P.Rozenbajger 96 141474_15_0 17.10 17.10
87 N.Puntola 86 141442_11_0 17.90 17.90
77 R.Friskopps 86 174242_15_0 29.10 29.10
83 A.Terho 86 168130_8_0 30.28 30.28
97 Ł.Paszczyk 86 176290_14_0 36.28 36.28
50 B. Holmberg 109 178402_15_0 41.10 41.10
07 M.Garbolewski 86 178418_15_0 48.62 48.62
58 R.Blauwhoff 86 141474_15_0 18.23 49.56
105 21586_0_0 31.33
05 C.Corns 7 131074_0_0 2.42 51.71
11 147458_0_0 8.21
85 178402_15_0 41.08
21 M.Kingsbury 86 179442_15_0 53.08 53.08
555 R.Suur 7 164946_0_0 32.45 58.71
11 151634_0_0 26.26
27 Ü.Mikk 7 151634_0_0 27.16 1:08.25
102 177346_10_0 41.09
23 J.Dohnalík 86 168002_0_0 30.98 1:08.30
115 47330_15_0 37.32
9 P.Diaz 86 146594_15_0 1:09.49 1:09.49
25 R.Kingsbury 7 162018_15_0 46.07 1:19.23
86 141474_15_0 33.16
08 P.Krzyżanowski 7 168978_0_0 32.82 1:22.87
11 16466_0_0 20.57
86 174242_15_0 29.48
730 D.Nawrocki 7 168018_0_0 33.05 1:28.01
86 178402_15_0 41.33
93 10402_15_0 13.63
17 N.Lamothe 11 179442_15_0 51.31 1:29.24
86 141474_15_0 37.93
510 E.Harmon 86 179442_15_0 51.51 1:29.58
137 37970_0_0 38.07
96 R.Kronpušs 7 32834_0_0 19.31 1:31.04
26 163922_0_0 40.41
84 43234_15_0 31.32
74 M.Braksator 7 152658_0_0 33.15 1:32.67
11 131074_0_0 3.41
59 179442_15_0 56.11
121 J.Babowicz 7 152594_0_0 27.74 1:57.23
65 162034_15_0 44.87
112 36930_0_0 25.31
133 32834_0_0 19.31

Average Lap and Stability

Name Average Lap Stability
Sort: Time Veloc. [km/h] Laps Difference [s]
First lap isn't considered for std. deviation.
991 S.Martin 1:50.98 96.65 5 4.15
333 D.Jundt 56.64 189.36 140 18.48
52 T.Korený 57.07 187.95 139 18.48
05 C.Corns 56.64 189.37 140 18.74
93 E.liņš 57.06 187.98 139 19.01
64 M.Kapal 56.66 189.32 140 19.10
33 Y.Laprevotte 56.64 189.38 140 19.42
121 J.Babowicz 58.33 183.88 136 19.47
69 P.Rozenbajger 57.06 187.99 139 19.47
83 A.Terho 56.64 189.38 140 19.63
50 B. Holmberg 57.48 186.61 138 19.65
23 J.Dohnalík 57.10 187.84 139 19.72
87 N.Puntola 56.64 189.36 140 19.81
510 E.Harmon 56.65 189.35 140 19.84
74 M.Braksator 57.91 185.21 137 19.93
27 Ü.Mikk 57.48 186.60 138 20.06
58 R.Blauwhoff 57.51 186.49 137 20.23
07 M.Garbolewski 56.64 189.36 140 20.24
96 R.Kronpušs 57.50 186.55 138 20.24
730 D.Nawrocki 57.06 187.96 139 20.31
21 M.Kingsbury 56.64 189.36 140 20.51
77 R.Friskopps 56.63 189.40 140 20.55
25 R.Kingsbury 56.65 189.33 140 20.57
17 N.Lamothe 56.65 189.35 140 20.62
08 P.Krzyżanowski 56.65 189.33 140 20.80
555 R.Suur 59.28 180.93 70 21.17
9 P.Diaz 56.63 189.40 140 21.55
97 Ł.Paszczyk 58.02 184.86 105 21.56
55 L.Matonis 1:03.33 169.37 50 23.07

Sector Times

Name Best Sector 1 Best Sector 2 Best Possibe Lap Best Lap
Sort: Time Gap [s] Lap Time Gap [s] Lap Time Gap [s] Time Gap [s] Lap
Combined Best Lap: 47.51
333 D.Jundt 16.83 0.24 94 30.92 --- 94 47.75 --- 47.75 --- 94
9 P.Diaz 16.67 0.08 43 30.94 0.02 94 47.61 0.17 47.78 0.03 43
21 M.Kingsbury 16.66 0.07 82 31.06 0.14 73 47.72 0.06 47.78 0.03 73
25 R.Kingsbury 16.61 0.02 82 31.07 0.15 73 47.68 0.11 47.79 0.04 73
17 N.Lamothe 16.59 --- 82 31.08 0.16 73 47.67 0.13 47.80 0.05 73
87 N.Puntola 16.68 0.09 43 31.06 0.14 97 47.74 0.09 47.83 0.08 97
77 R.Friskopps 16.70 0.11 93 30.94 0.02 94 47.64 0.20 47.84 0.09 103
08 P.Krzyżanowski 16.70 0.11 72 31.08 0.16 79 47.78 0.08 47.86 0.11 79
730 D.Nawrocki 16.71 0.12 72 31.09 0.17 79 47.80 0.07 47.87 0.12 79
64 M.Kapal 16.76 0.17 123 31.09 0.17 121 47.85 0.05 47.90 0.15 122
97 Ł.Paszczyk 16.76 0.17 79 31.09 0.17 46 47.85 0.10 47.95 0.20 39
69 P.Rozenbajger 16.74 0.15 33 31.06 0.14 105 47.80 0.18 47.98 0.23 33
33 Y.Laprevotte 16.75 0.16 79 31.24 0.32 21 47.99 0.03 48.02 0.27 79
07 M.Garbolewski 16.79 0.20 129 31.17 0.25 128 47.96 0.11 48.07 0.32 128
83 A.Terho 16.80 0.21 73 31.25 0.33 19 48.05 0.10 48.15 0.40 19
27 Ü.Mikk 16.82 0.23 111 31.31 0.39 110 48.13 0.04 48.17 0.42 110
50 B. Holmberg 16.85 0.26 43 31.29 0.37 132 48.14 0.04 48.18 0.43 132
05 C.Corns 16.84 0.25 77 31.31 0.39 76 48.15 0.05 48.20 0.45 77
121 J.Babowicz 16.79 0.20 77 31.30 0.38 75 48.09 0.14 48.23 0.48 75
74 M.Braksator 16.83 0.24 27 31.31 0.39 92 48.14 0.09 48.23 0.48 27
52 T.Korený 16.76 0.17 97 31.32 0.40 96 48.08 0.16 48.24 0.49 96
96 R.Kronpušs 16.88 0.29 78 31.30 0.38 67 48.18 0.06 48.24 0.49 131
58 R.Blauwhoff 16.83 0.24 119 31.25 0.33 118 48.08 0.16 48.24 0.49 131
93 E.liņš 16.89 0.30 27 31.30 0.38 59 48.19 0.06 48.25 0.50 106
555 R.Suur 16.82 0.23 36 31.36 0.44 46 48.18 0.09 48.27 0.52 36
23 J.Dohnalík 16.87 0.28 19 31.33 0.41 23 48.20 0.12 48.32 0.57 23
510 E.Harmon 16.86 0.27 115 31.38 0.46 51 48.24 0.19 48.43 0.68 50
55 L.Matonis 16.86 0.27 21 31.68 0.76 20 48.54 0.08 48.62 0.87 21
991 S.Martin 36.48 19.89 4 63.24 32.32 3 1:39.72 5.71 1:45.43 57.68 4

Flags

Name Yellows Caused Blues Seen
31 cars caused 1591 yellow and 16 cars got 518 blue flags.
77 R.Friskopps 41 0
9 P.Diaz 49 0
83 A.Terho 47 0
33 Y.Laprevotte 43 0
05 C.Corns 71 22
21 M.Kingsbury 57 0
87 N.Puntola 43 0
07 M.Garbolewski 59 0
333 D.Jundt 60 4
510 E.Harmon 50 0
17 N.Lamothe 52 0
25 R.Kingsbury 58 0
08 P.Krzyżanowski 71 0
64 M.Kapal 38 0
69 P.Rozenbajger 51 34
93 E.liņš 66 6
730 D.Nawrocki 62 58
52 T.Korený 57 17
23 J.Dohnalík 60 10
50 B. Holmberg 53 15
27 Ü.Mikk 60 22
96 R.Kronpušs 58 76
58 R.Blauwhoff 60 19
74 M.Braksator 71 86
121 J.Babowicz 71 95
97 Ł.Paszczyk 51 0
555 R.Suur 34 41
55 L.Matonis 39 7
991 S.Martin 15 0
Jonathan Palmer 3 0
28 Z.Cagaš 41 6

Penalties

Name Lap Description
5 cars got a total of 6 penalties.
08 P.Krzyżanowski 21 DT (Admin)
25 DT Cleared
730 D.Nawrocki 22 DT (Admin)
24 DT Cleared
74 M.Braksator 17 DT (Admin)
18 DT Cleared
121 J.Babowicz 22 DT (Admin)
23 DT Cleared
555 R.Suur 17 DT (Admin)
20 SG (Admin)
21 SG Cleared

Lap by Lap Analysis

Lap 77 R.Friskopps 9 P.Diaz 83 A.Terho 33 Y.Laprevotte 05 C.Corns 21 M.Kingsbury 87 N.Puntola 07 M.Garbolewski 333 D.Jundt 510 E.Harmon 17 N.Lamothe 25 R.Kingsbury 08 P.Krzyżanowski 64 M.Kapal 69 P.Rozenbajger 93 E.liņš 730 D.Nawrocki 52 T.Korený 23 J.Dohnalík 50 B. Holmberg 27 Ü.Mikk 96 R.Kronpušs 58 R.Blauwhoff 74 M.Braksator 121 J.Babowicz 97 Ł.Paszczyk 555 R.Suur 55 L.Matonis 991 S.Martin Jonathan Palmer 28 Z.Cagaš
Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph
Total 2h 12:08.29 2h 12:08.32 2h 12:09.45 2h 12:09.46 2h 12:09.57 2h 12:09.96 2h 12:10.24 2h 12:10.28 2h 12:10.28 2h 12:10.40 2h 12:10.46 2h 12:11.29 2h 12:11.55 2h 12:11.84 2h 12:10.93 2h 12:11.22 2h 12:11.93 2h 12:12.38 2h 12:17.08 2h 12:12.16 2h 12:12.47 2h 12:14.68 2h 11:19.48 2h 12:14.12 2h 12:12.97 1h 41:32.30 1h 09:09.77 52:46.55 9:14.89 0.00 0.00
+ 0.03 + 1.16 + 1.17 + 1.28 + 1.67 + 1.95 + 1.99 + 1.99 + 2.11 + 2.17 + 3.00 + 3.26 + 3.55 + 1 Lap + 1 Lap + 1 Lap + 1 Lap + 1 Lap + 2 Laps + 2 Laps + 2 Laps + 3 Laps + 3 Laps + 4 Laps + 35 Laps + 70 Laps + 90 Laps + 135 Laps + 140 Laps + 140 Laps
100%: 47.75 101%: 48.23 103%: 49.18 105%: 50.14 107%: 51.09 >107%: >51.09 Pitstop Takeover Penalty Lap Rejoin
1 1:54.94 1:56.39 1:59.10 1:59.72 2:09.37 1:56.75 1:57.43 1:55.31 2:07.10 2:07.81 2:00.82 2:06.39 1:56.07 2:04.07 2:06.68 2:01.41 2:05.44 2:10.19 2:00.45 2:04.98 2:02.86 2:05.94 1:58.26 2:08.55 2:07.21 1:58.62 2:02.24 2:01.66 2:04.30    
2 1:50.22 1:50.92 1:49.77 1:49.47 1:48.89 1:50.97 1:50.71 1:51.44 1:48.77 1:48.81 1:49.03 1:48.77 1:50.91 1:48.59 1:49.05 1:48.73 1:49.00 1:48.89 1:48.92 1:49.21 1:48.94 1:49.03 1:50.08 1:49.62 1:49.08 1:49.98 1:48.70 1:48.95 1:49.05    
3 1:49.53 1:48.53 1:49.09 1:48.84 1:47.59 1:48.36 1:48.27 1:48.22 1:48.61 1:48.42 1:48.91 1:48.59 1:48.42 1:48.51 1:48.40 1:48.60 1:48.02 1:47.06 1:48.90 1:47.83 1:48.87 1:48.38 1:49.06 1:47.47 1:48.68 1:48.79 1:49.24 1:48.70 1:48.33    
4 1:49.38 1:48.55 1:47.53 1:47.46 1:43.18 1:48.26 1:48.30 1:49.05 1:43.99 1:43.79 1:47.13 1:44.04 1:55.07 1:45.76 1:44.47 1:47.46 1:45.06 1:43.43 1:47.68 1:45.61 1:46.53 1:44.96 1:47.54 1:43.61 1:45.55 1:47.64 1:46.33 1:46.97 1:45.43    
5 1:49.96 1:49.67 1:48.97 1:49.06 1:47.05 1:49.83 1:49.53 1:49.94 1:47.27 1:47.06 1:48.93 1:47.58 1:45.98 1:48.46 1:47.16 1:48.81 1:47.53 1:46.57 1:48.80 1:47.85 1:49.95 1:47.25 1:49.30 1:46.86 1:46.06 1:49.43 1:48.73 1:48.66 1:47.78    
6 57.11 1:01.51 1:04.64 1:05.09 1:09.01 1:00.69 1:01.80 1:00.23 1:13.64 1:10.01 1:05.45 1:13.41 1:09.01 1:07.82 1:08.34 1:06.29 1:13.10 1:08.47 1:05.32 1:08.24 1:13.15 1:13.02 1:02.74 1:14.51 1:13.24 1:03.23 1:13.79 1:05.35      
7 1:45.85 1:43.14 1:41.67 1:41.76 1:50.53 1:43.20 1:43.26 1:43.59 1:37.89 1:40.14 1:41.93 2:31.78 2:17.12 1:40.69 1:41.15 1:41.64 2:14.91 1:40.97 1:41.83 1:41.12 2:14.17 2:03.98 1:43.14 2:13.92 2:09.26 1:42.70 2:17.82 1:41.98      
8 1:49.98 1:49.25 1:48.35 1:48.34 1:40.12 1:49.46 1:48.97 1:49.43 1:48.07 1:48.06 1:48.41 1:00.34 1:14.99 1:48.31 1:48.09 1:48.27 1:14.86 1:48.22 1:48.47 1:48.18 1:14.77 1:23.63 1:48.46 1:14.04 1:17.53 1:48.43 1:12.86 1:48.68      
9 1:49.21 1:48.99 1:48.83 1:48.10 1:44.62 1:49.09 1:48.77 1:49.23 1:44.85 1:45.68 1:47.42 1:39.85 1:42.61 1:46.12 1:45.41 1:47.01 1:42.46 1:45.64 1:47.54 1:45.62 1:41.41 1:44.03 1:48.71 1:42.11 1:43.71 1:48.86 1:40.62 1:47.17      
10 54.75 59.70 1:06.43 1:03.45 1:16.09 59.72 1:01.06 57.52 1:10.85 1:10.86 1:18.61 1:13.45 1:14.35 1:09.57 1:10.74 1:08.36 1:11.91 1:10.92 1:06.11 1:10.04 1:15.18 1:14.98 1:01.09 1:16.46 1:15.86 1:02.74 1:16.53 1:06.75      
11 1:40.04 1:35.63 1:30.82 1:32.68 1:40.89 1:35.38 1:34.61 1:37.30 1:28.23 1:28.20 2:24.53 1:26.91 1:53.60 1:29.07 1:28.65 1:29.62 1:27.59 1:28.16 1:30.57 1:28.85 1:26.35 1:26.25 1:34.84 1:40.48 1:26.78 1:33.06 1:59.59 1:30.71      
12 1:55.46 1:55.45 1:56.43 1:56.27 1:42.71 1:55.24 1:55.93 1:55.44 1:56.40 1:56.38 1:01.56 1:56.31 1:32.54 1:56.01 1:56.06 1:56.38 1:56.21 1:56.43 1:56.59 1:56.22 1:56.58 1:56.52 1:55.71 1:42.62 1:56.34 1:55.79 1:24.96 1:56.60      
13 1:49.54 1:48.68 1:45.39 1:46.54 1:40.35 1:49.23 1:48.00 1:49.38 1:43.28 1:43.61 1:37.19 1:42.16 1:39.41 1:44.98 1:44.17 1:44.82 1:42.90 1:43.78 1:45.70 1:44.66 1:41.46 1:41.99 1:47.69 1:39.53 1:40.40 1:47.73 1:38.51 1:45.02      
14 51.56 52.06 52.60 52.19 58.13 53.56 51.55 51.52 52.24 52.78 51.78 52.19 55.67 52.00 51.48 52.45 51.18 52.16 51.51 51.98 52.54 51.96 51.70 51.32 52.05 51.90 51.53 52.43      
15 48.38 49.48 49.13 49.12 49.33 49.12 48.90 50.24 49.05 50.41 49.33 49.33 49.11 49.17 49.16 49.67 54.18 49.88 49.47 49.77 49.35 49.96 49.48 49.53 50.20 49.08 49.28 49.83      
16 48.43 49.09 50.34 49.09 48.74 48.76 48.83 51.74 49.81 50.09 49.57 49.58 48.59 50.59 50.07 49.56 48.69 49.46 48.88 49.95 52.78 49.82 48.87 49.89 50.31 49.03 50.76 49.55      
17 48.40 48.45 49.39 48.43 48.70 48.60 48.54 51.77 49.35 49.56 49.11 49.11 48.52 49.75 49.20 50.53 48.66 50.06 48.64 51.02 49.91 49.29 48.38 1:08.97 49.20 48.40 50.05 49.52      
18 48.35 48.48 48.43 48.73 48.68 48.64 48.40 50.78 49.04 49.97 48.85 48.84 48.72 49.18 48.56 51.25 49.15 49.09 49.06 49.25 48.62 49.41 48.85 58.90 49.74 48.65 49.00 49.45      
19 48.21 48.17 48.15 48.38 48.71 48.41 48.31 50.69 48.81 49.06 48.29 48.30 48.23 48.75 48.15 50.93 48.13 48.92 48.33 48.72 48.60 49.97 48.76 48.70 50.47 48.17 49.03 48.93      
20 48.51 48.19 48.27 48.79 48.64 48.72 48.40 50.36 49.11 48.90 48.75 48.74 48.23 48.77 48.26 48.70 48.23 48.89 48.64 48.62 48.86 49.31 48.67 48.56 49.04 48.23 48.63 48.85      
21 48.45 48.29 48.28 48.37 48.66 48.72 48.38 49.23 48.58 48.79 48.26 48.34 48.62 48.39 48.20 49.05 48.66 48.74 48.40 48.77 48.76 49.28 48.34 48.74 48.62 48.48 1:21.99 48.62      
22 48.41 48.55 49.07 48.68 48.68 48.72 48.49 49.10 48.81 48.67 48.48 48.41 48.86 48.69 48.48 48.64 48.85 48.89 48.66 48.88 48.91 49.60 48.64 48.68 1:07.42 48.74 59.36 49.99      
23 48.41 48.49 48.74 48.44 48.41 48.57 48.43 49.13 48.42 48.45 48.21 48.21 48.33 48.19 48.37 48.55 1:05.93 49.37 48.32 49.06 48.43 49.53 48.39 48.65 58.77 48.55 48.52 50.32      
24 48.32 48.56 48.54 48.77 48.78 48.86 48.51 48.91 48.67 48.45 48.36 48.34 1:06.91 48.35 48.44 48.71 58.48 48.65 48.57 48.62 48.96 49.58 48.69 48.52 48.73 48.57 48.65 49.19      
25 48.36 48.47 48.79 48.69 48.47 48.13 48.41 48.80 48.55 49.05 48.54 48.55 58.60 48.60 48.19 48.76 48.89 48.47 48.51 48.39 48.50 49.86 48.40 48.34 48.65 48.56 48.88 49.17      
26 48.44 48.51 48.76 48.98 48.93 48.22 48.55 48.82 48.64 48.71 48.44 48.43 48.48 48.41 48.21 49.41 48.53 48.93 49.04 48.66 49.01 1:50.85 48.41 48.58 48.74 48.64 48.59 49.18      
27 48.48 48.43 48.65 48.90 48.52 48.60 48.48 49.16 49.30 48.55 48.62 48.63 48.51 48.29 48.26 48.61 48.44 48.89 48.77 48.79 48.41 58.81 48.41 48.23 48.81 48.45 48.89 49.24      
28 48.49 48.55 48.78 49.06 56.53 49.50 48.54 48.95 49.01 48.51 48.34 48.34 48.74 48.25 48.44 48.50 48.48 48.44 49.96 48.61 48.65 48.47 48.39 48.93 48.85 48.63 49.38 48.97      
29 48.60 48.50 48.47 48.78 48.72 49.02 48.50 48.89 48.85 48.55 48.39 48.39 48.46 48.79 48.50 48.71 48.64 48.85 49.37 48.69 48.84 48.58 48.45 48.94 48.55 48.46 48.68 48.95      
30 48.34 48.34 48.80 48.43 48.90 48.35 48.34 48.92 48.89 48.72 48.64 48.64 48.58 48.61 48.41 48.57 48.64 48.60 49.27 48.75 48.51 48.62 48.47 48.81 48.73 48.77 48.80 49.73      
31 48.34 48.39 48.70 48.45 48.67 48.45 48.35 48.99 48.77 48.64 48.46 48.46 48.33 49.30 48.37 48.42 48.42 49.08 50.85 48.71 48.49 48.65 48.51 48.80 48.69 48.48 48.30 49.72      
32 48.69 48.47 48.64 48.42 48.52 48.42 48.42 48.99 48.71 48.61 48.41 48.41 48.53 48.52 48.26 49.23 48.45 48.74 49.01 48.76 48.52 48.55 48.60 48.84 48.88 48.56 48.59 49.67      
33 48.39 48.45 48.61 48.15 48.94 48.15 48.45 49.36 48.66 48.53 48.29 48.29 48.53 48.79 47.98 48.53 48.40 48.69 49.10 48.77 48.67 48.54 49.36 48.74 48.68 49.23 48.51 49.47      
34 48.34 48.45 48.60 48.33 48.80 48.33 48.52 49.10 48.66 48.81 48.22 48.21 48.58 48.56 48.45 48.67 48.54 48.38 48.92 48.68 48.83 48.57 48.76 48.66 48.76 48.67 48.74 49.30      
35 48.39 48.27 48.39 48.33 48.74 48.35 48.33 48.96 48.77 48.55 48.17 48.19 48.56 48.46 48.41 48.42 48.57 48.38 48.83 48.52 48.83 48.57 48.92 49.06 48.83 49.28 48.54 49.61      
36 48.29 48.32 48.51 48.67 48.94 48.64 48.39 48.99 48.69 48.60 48.42 48.40 48.39 48.32 48.41 1:01.35 48.34 48.54 48.98 48.54 48.62 48.49 49.98 49.03 48.67 49.12 48.27 49.51      
37 48.23 48.32 48.45 48.23 48.75 48.26 48.43 48.73 48.60 48.53 48.68 48.69 48.36 48.47 48.33 48.83 48.45 48.51 48.99 48.81 48.71 48.49 49.05 49.09 48.77 48.81 48.70 49.92      
38 48.48 48.43 48.69 48.33 48.65 48.31 48.52 48.90 48.75 48.60 48.35 48.35 48.51 48.85 48.39 48.68 48.50 49.01 49.07 48.79 48.63 48.42 48.85 49.03 48.75 48.63 48.41 49.79      
39 48.41 48.30 48.59 48.39 48.76 48.39 48.38 48.78 48.34 48.52 47.99 47.99 48.50 48.47 48.38 48.79 48.46 48.64 49.14 48.66 48.36 48.51 48.45 48.86 48.62 47.95 48.62 50.65      
40 48.30 48.43 48.56 48.33 48.65 48.33 48.40 48.77 48.58 48.77 48.23 48.23 48.64 48.51 48.34 48.79 48.48 48.88 48.96 48.86 48.54 48.45 48.78 48.99 48.96 48.25 49.07 50.81      
41 48.23 48.40 48.55 48.26 48.70 48.28 48.58 48.66 48.87 48.65 48.40 48.40 48.53 48.55 48.35 50.01 48.48 48.47 49.31 48.40 48.70 48.45 48.67 49.00 48.70 48.38 48.81 50.08      
42 48.09 47.93 48.95 48.23 48.78 48.94 48.27 48.72 48.61 48.66 48.27 48.33 48.45 48.49 48.29 48.55 48.38 48.42 49.21 48.55 48.84 49.46 48.77 48.86 48.72 48.41 48.69 49.90      
43 48.24 47.78 48.70 48.66 48.59 49.25 47.84 48.43 48.73 48.53 48.85 48.79 48.42 48.44 48.40 48.43 48.59 48.70 49.04 48.56 48.55 48.93 48.81 48.85 48.77 48.87 48.58 49.84      
44 48.24 48.08 48.53 48.61 48.56 48.43 48.02 48.44 48.57 48.57 48.42 48.43 48.40 48.69 48.43 48.40 48.45 48.84 49.10 48.86 48.75 48.58 48.61 48.88 48.69 48.37 48.41 50.25      
45 48.35 47.90 48.49 48.65 48.59 48.29 47.92 48.68 48.34 49.07 48.29 48.28 48.37 48.89 48.56 48.36 48.31 48.69 49.32 48.54 48.74 48.52 48.55 50.39 48.59 48.31 48.74 49.73      
46 48.22 48.01 48.55 48.48 48.64 48.04 48.00 48.62 48.49 48.77 48.06 48.06 48.99 48.75 48.31 48.34 48.51 48.62 49.09 48.53 48.56 48.48 48.53 49.39 48.76 47.99 48.46 50.14      
47 48.38 48.09 48.45 48.95 48.73 48.23 48.10 48.63 48.35 48.47 48.23 48.23 48.50 48.48 48.34 48.40 48.52 48.47 49.07 48.53 48.66 49.34 48.70 49.19 48.62 48.37 48.68 51.31      
48 48.27 48.14 48.53 48.49 48.62 49.00 48.13 48.59 48.47 48.67 48.88 50.67 48.34 48.71 48.35 48.45 48.42 50.36 48.96 48.46 48.63 48.66 48.56 49.38 48.81 48.50 49.41 52.62      
49 48.33 47.96 48.76 48.63 48.60 50.29 47.96 48.67 48.61 48.53 50.48 48.70 48.40 48.72 48.57 48.34 48.46 48.83 49.02 48.79 48.60 49.01 48.68 49.28 49.07 48.79 48.37 51.13      
50 48.49 47.91 48.48 48.46 48.58 48.56 47.91 48.47 48.29 48.43 48.46 48.48 48.48 48.62 48.34 48.41 48.44 48.61 48.89 48.58 48.50 49.17 48.45 52.46 49.39 48.86 48.73 53.98      
51 48.61 48.19 48.50 48.81 48.78 48.30 48.19 48.66 48.46 48.43 48.32 48.29 48.50 48.50 48.32 48.65 48.51 48.55 48.85 48.54 48.48 48.64 48.44 51.70 48.84 48.62 48.71        
52 47.98 48.00 48.57 48.60 48.50 48.75 47.99 48.58 48.61 48.75 48.76 48.76 48.23 48.64 48.40 48.50 48.40 48.57 48.98 49.09 48.54 48.56 48.46 50.21 48.69 48.61 48.67        
53 47.94 47.93 48.37 48.65 48.59 48.42 47.94 48.57 48.53 48.58 48.41 48.40 48.40 48.69 48.44 48.42 48.55 48.48 48.95 48.76 48.55 48.54 48.51 50.13 48.63 48.41 48.79        
54 49.51 49.03 48.60 48.22 48.57 48.30 49.24 48.72 48.61 48.74 48.30 48.31 48.42 48.61 48.35 48.39 48.45 48.74 48.98 48.70 48.53 48.73 48.43 50.36 49.06 48.23 48.94        
55 48.31 48.80 48.68 48.22 48.41 48.50 48.59 48.71 48.48 48.84 48.38 48.44 48.45 48.41 48.36 48.41 48.48 48.45 49.01 48.57 48.40 48.45 48.46 50.62 48.93 48.22 48.98        
56 48.24 48.22 48.62 48.40 48.42 48.48 48.25 48.69 48.49 49.46 48.60 48.54 48.46 48.68 48.38 48.43 48.43 48.72 48.89 48.77 48.53 48.51 48.45 50.34 48.68 48.40 48.55        
57 48.07 48.09 48.35 48.08 48.66 48.44 48.05 48.97 48.62 50.96 48.29 48.30 48.36 48.60 48.20 48.45 48.50 48.74 48.95 48.59 48.82 48.50 48.30 50.72 48.77 48.13 48.80        
58 48.13 48.10 48.52 48.11 1:05.37 48.44 48.11 48.66 48.52 48.95 48.58 48.57 48.35 48.54 48.36 48.59 48.68 48.55 48.95 48.76 48.59 48.56 48.43 50.69 48.79 48.06 48.73        
59 48.26 48.24 48.47 48.39 48.70 48.28 48.23 48.52 48.41 48.82 48.29 48.29 48.40 48.39 48.48 48.30 48.48 48.86 48.89 48.54 48.36 48.61 48.48 2:07.37 48.57 48.38 48.91        
60 48.25 48.28 48.39 48.22 49.03 48.21 48.30 48.54 48.43 48.82 48.18 48.18 48.12 48.50 48.51 48.34 48.28 48.85 49.05 48.58 48.45 48.37 48.26 59.75 49.09 48.59 48.74        
61 47.88 47.90 48.71 48.38 48.81 48.21 47.89 48.47 48.24 49.08 48.25 48.25 48.98 48.45 48.38 48.41 49.02 49.15 48.89 48.99 48.65 48.55 48.38 49.03 48.58 48.47 48.76        
62 48.06 48.02 48.44 48.42 49.22 48.29 48.02 48.60 48.38 48.94 48.24 48.25 48.44 48.28 48.39 48.55 48.39 48.70 48.99 48.74 48.58 49.24 48.43 49.24 49.01 48.37 49.11        
63 48.40 48.15 48.43 48.68 49.08 48.43 48.43 48.68 48.35 48.92 48.44 48.42 48.05 48.35 48.37 48.44 47.99 48.71 48.95 48.65 48.44 48.52 48.54 48.69 48.95 48.51 48.71        
64 48.51 48.25 48.70 48.52 48.53 48.39 48.52 48.57 48.28 48.87 48.42 48.43 48.25 48.52 49.01 48.42 48.31 48.58 48.94 48.61 48.50 48.30 48.66 48.67 50.68 48.38 48.76        
65 48.52 48.25 48.59 48.48 48.29 48.73 48.69 48.35 48.36 48.91 48.74 48.73 48.19 48.47 48.65 48.46 48.20 48.86 48.81 48.60 48.60 48.26 48.58 48.71 1:56.08 48.39 49.15        
66 48.18 48.35 48.49 48.23 48.26 48.21 48.20 48.62 48.32 48.85 48.19 48.19 48.08 48.36 48.31 48.62 48.05 48.49 48.81 48.46 48.49 48.41 48.40 48.46 59.73 48.23 48.94        
67 48.04 48.29 48.50 48.10 48.42 48.01 48.36 48.42 48.47 48.82 48.03 48.04 48.38 48.58 48.23 48.47 48.39 48.61 48.91 48.71 48.53 48.44 48.34 49.48 48.92 48.11 48.98        
68 48.22 48.40 48.49 48.23 48.43 48.13 48.51 48.53 48.55 48.96 48.13 48.12 48.39 48.47 48.38 48.47 48.40 48.57 48.88 48.58 48.52 48.71 48.38 48.83 48.55 48.22 48.75        
69 48.33 48.34 48.49 48.14 48.41 48.50 48.52 48.64 48.47 48.93 48.45 48.47 48.20 48.51 48.27 48.44 48.18 48.78 48.90 48.59 48.59 48.52 48.48 49.12 48.64 48.14 49.39        
70 48.30 48.41 49.17 48.17 48.55 48.45 48.63 48.75 48.47 48.65 48.39 48.38 48.19 48.51 48.31 48.41 48.16 48.78 48.87 48.79 48.58 48.36 48.48 49.47 48.83 48.18 48.83        
71 48.09 48.26 48.72 48.09 48.62 48.13 48.47 48.64 48.42 48.90 48.24 48.23 47.99 48.47 48.21 48.35 48.04 48.61 48.87 48.73 48.38 48.43 48.53 48.82 48.70 48.08          
72 48.32 48.32 48.54 48.14 48.44 48.27 48.45 48.61 48.32 48.87 48.25 48.27 48.53 48.49 48.27 48.53 48.53 48.60 48.92 48.85 48.56 48.53 48.49 48.49 48.68 48.50          
73 48.21 48.22 48.48 48.36 48.55 47.78 48.35 48.42 48.49 49.00 47.80 47.79 48.01 48.50 48.16 49.38 48.01 48.51 48.96 48.62 48.67 48.50 48.38 48.71 48.45 48.55          
74 48.29 48.28 48.50 48.59 48.48 48.31 48.27 48.39 48.48 48.86 48.24 48.24 47.98 48.73 48.28 48.62 47.96 48.45 48.86 48.51 48.38 48.53 48.54 48.62 48.34 48.44          
75 48.27 48.29 48.52 48.46 48.54 48.34 48.43 48.92 48.52 48.87 48.40 48.41 48.00 48.53 48.30 48.64 48.02 48.52 49.03 48.66 48.48 48.90 48.34 48.62 48.23 48.39          
76 48.34 48.33 48.66 48.71 48.42 48.36 48.29 48.65 48.57 48.90 48.34 48.34 48.29 48.61 48.20 48.28 48.30 48.58 48.84 48.64 48.45 48.96 48.59 48.77 48.44 48.38          
77 48.33 48.32 48.43 48.48 48.20 48.02 48.31 48.43 48.34 48.69 48.06 48.05 48.28 48.29 48.20 48.31 48.18 48.35 48.87 48.43 48.38 48.74 48.37 48.63 48.32 48.34          
78 48.26 48.27 48.65 48.20 49.96 48.35 48.19 48.87 48.32 48.77 48.34 48.34 48.06 48.79 48.23 48.45 48.14 48.44 49.03 48.50 48.30 48.34 48.53 49.08 48.54 48.19          
79 48.31 48.30 48.55 48.02 49.83 47.98 48.25 48.52 48.55 48.68 47.97 47.97 47.86 48.39 48.18 48.44 47.87 48.66 48.93 48.54 48.54 48.44 48.61 48.68 48.71 48.03          
80 48.19 48.20 48.67 48.16 49.09 47.94 48.24 48.68 49.06 48.73 47.96 47.96 48.14 48.62 48.49 49.76 48.13 48.66 48.83 48.49 48.33 48.59 48.55 52.01 48.84 48.14          
81 48.39 48.39 48.29 48.16 48.59 47.89 48.39 48.67 48.55 48.73 47.89 47.89 48.17 48.29 48.36 49.53 48.11 48.50 48.87 48.64 48.43 48.50 48.49 52.28 51.49 48.17          
82 48.27 48.31 48.55 48.60 1:08.85 48.04 48.40 48.51 48.31 48.72 48.02 48.03 48.02 48.55 48.41 48.64 48.09 48.34 48.73 48.41 48.40 55.40 48.74 1:02.80 1:30.28 48.39          
83 48.43 48.76 50.32 49.53 52.17 1:02.00 49.24 52.09 50.25 51.57 48.71 48.86 54.33 50.80 48.60 54.85 53.85 52.10 54.18 53.04 52.59 1:19.35 48.99 1:47.40 1:50.14 49.27          
84 52.20 52.21 51.35 54.80 1:04.92 50.45 1:01.69 56.13 56.14 56.93 54.48 54.53 53.58 56.63 56.95 52.57 53.93 52.81 52.95 51.37 51.90 2:30.57 49.36 1:50.28 1:01.15 54.45          
85 1:29.95 1:30.10 1:12.81 1:19.24 2:41.93 1:12.45 1:18.92 52.47 1:07.79 51.97 1:19.42 1:19.42 52.21 1:07.61 1:19.09 50.88 52.24 1:02.60 52.34 1:04.22 1:04.80 1:17.22 1:18.15 1:53.52 59.69 1:19.58          
86 2:28.60 3:08.87 2:32.90 2:06.01 1:05.05 2:52.12 2:16.83 2:45.66 1:48.29 2:57.94 2:37.85 2:34.66 2:58.68 1:48.40 1:49.89 1:46.40 2:39.98 1:47.61 2:29.28 1:47.49 1:48.15 1:54.20 2:18.21 1:44.49 1:54.34 2:39.65          
87 1:21.08 1:01.96 1:12.67 1:38.18 1:00.27 1:04.19 1:30.52 1:04.28 1:49.80 1:02.16 1:11.13 1:13.21 1:03.64 1:49.75 1:52.60 1:49.82 1:03.62 1:50.32 1:09.73 1:49.65 1:49.55 1:41.14 1:26.34 51.66 1:39.36 1:10.09          
88 1:54.37 1:37.36 1:54.41 1:54.19 56.43 1:46.75 1:53.95 1:47.46 1:53.77 1:38.67 1:54.40 1:53.94 1:35.75 1:53.78 1:53.67 1:54.05 1:53.05 1:53.44 1:54.47 1:53.92 1:53.61 51.34 1:53.97 48.41 52.10 1:54.09          
89 1:42.42 1:40.79 1:41.07 1:43.83 1:38.78 1:40.61 1:43.78 1:40.44 1:46.94 1:40.94 1:40.87 1:41.96 1:40.58 1:46.97 1:46.98 1:44.29 1:40.42 1:45.54 1:40.16 1:46.03 1:46.84 48.89 1:43.02 48.79 50.15 1:40.44          
90 51.81 50.76 52.26 52.31 53.30 51.70 51.86 52.07 52.31 51.36 53.08 53.36 50.68 52.02 51.67 53.37 51.53 52.49 52.22 52.89 52.33 49.07 51.94 48.47 48.75 51.92          
91 50.12 48.62 49.93 50.01 49.72 49.58 49.17 49.86 50.48 49.81 49.83 49.89 49.78 48.61 48.83 57.86 51.87 50.41 52.58 51.10 51.50 49.02 52.97 49.23 48.66 50.04          
92 48.60 48.26 48.53 48.98 49.09 49.33 48.62 49.38 48.74 49.33 49.33 49.26 49.00 48.83 48.88 49.55 49.37 48.72 50.48 49.34 49.15 48.60 50.14 48.32 48.35 49.00          
93 47.99 48.14 48.45 48.44 48.80 48.69 48.48 48.95 48.35 48.82 48.50 48.50 49.02 48.44 48.42 48.71 1:23.67 48.77 48.72 51.04 48.46 48.56 48.89 48.60 48.89 48.52          
94 47.86 47.78 48.85 48.28 49.20 48.56 48.30 48.31 47.75 48.44 48.14 48.15 48.65 48.61 48.58 48.55 58.93 48.74 48.71 49.44 48.52 49.67 49.10 49.22 48.59 48.26          
95 48.00 47.95 48.63 48.59 49.38 48.73 48.26 49.21 48.32 49.16 48.48 48.47 48.60 48.60 48.33 48.48 48.68 49.78 49.46 49.65 49.02 48.90 50.77 48.57 48.26 48.67          
96 48.22 48.27 49.87 48.30 49.15 48.36 48.26 48.58 48.71 48.96 48.39 48.38 48.38 48.80 1:26.53 48.43 48.66 48.24 49.40 49.75 48.47 48.67 49.97 48.49 48.69 48.86          
97 47.91 47.83 49.12 48.29 48.87 48.81 47.83 48.68 48.42 48.59 48.65 48.70 48.86 48.28 58.83 48.80 48.48 48.37 48.85 49.18 48.55 48.35 49.87 48.72 48.35 48.87          
98 47.97 47.98 49.47 48.49 49.02 49.07 47.98 49.34 48.25 49.96 48.38 48.34 48.87 48.27 48.35 49.00 48.45 49.00 48.54 49.09 48.78 48.63 49.57 49.10 48.47 48.70          
99 47.98 47.99 48.96 48.53 50.64 48.35 48.00 49.05 48.31 50.17 48.34 48.33 48.35 48.40 48.18 49.34 48.39 50.96 48.56 49.32 51.88 48.48 50.08 51.10 48.74 51.40          
100 48.19 48.19 48.59 48.28 48.73 47.97 48.18 48.62 48.55 48.59 48.01 48.03 47.98 48.39 48.38 48.92 48.48 48.90 48.83 50.18 51.39 49.18 50.97 49.07 49.06 55.95          
101 48.29 48.29 48.66 48.53 48.68 48.31 48.29 48.56 49.08 48.77 48.16 48.15 48.30 48.33 48.30 48.43 48.65 48.63 48.82 49.72 50.17 48.89 50.99 48.61 49.08 50.34          
102 48.10 48.09 48.59 49.10 48.51 49.02 48.40 48.45 48.61 48.65 48.69 48.70 48.38 48.38 48.36 48.37 49.17 49.02 48.62 49.58 1:58.84 49.03 52.35 48.88 49.02 50.06          
103 47.84 47.84 48.65 48.66 48.63 48.66 48.52 48.47 48.34 48.71 48.64 48.67 48.53 48.49 48.26 48.70 49.29 48.97 48.94 49.14 59.52 50.64 51.11 48.60 49.98 49.91          
104 48.21 48.22 48.69 48.55 48.75 48.73 48.25 48.48 48.40 48.78 49.16 49.13 48.56 48.47 48.35 48.62 48.49 48.99 49.03 49.30 48.92 49.00 50.65 48.91 48.64 49.97          
105 48.22 48.22 48.46 48.33 48.55 48.40 48.36 48.22 48.36 48.66 48.23 48.21 48.49 48.28 48.05 48.30 48.51 48.97 48.72 49.19 48.34 48.77 1:44.67 48.59 48.54 49.87          
106 48.17 48.16 48.31 48.40 48.71 48.42 48.49 48.31 48.52 48.48 48.15 48.16 48.53 48.38 48.27 48.25 48.18 48.89 48.67 49.35 48.38 48.74 1:01.33 48.97 48.66            
107 48.26 48.26 48.47 48.46 48.67 49.10 48.75 48.47 48.26 48.57 48.36 48.37 48.15 48.32 48.44 48.84 48.03 49.07 48.67 49.06 48.31 49.38 49.90 48.78 52.12            
108 48.23 48.22 48.49 48.39 48.56 48.48 48.65 48.50 48.29 48.66 48.25 48.24 48.04 48.78 48.22 48.47 48.26 48.96 48.56 49.15 48.19 48.45 49.23 48.72 49.73            
109 48.42 48.28 48.46 48.35 48.58 48.73 48.56 48.46 48.38 48.90 48.13 48.12 48.25 48.38 48.25 48.39 48.01 48.90 48.63 1:57.37 48.25 48.59 48.65 49.04 49.85            
110 48.40 48.40 48.74 48.58 48.95 48.81 48.53 48.72 48.25 48.82 47.97 47.98 48.02 48.31 48.29 48.71 48.23 48.77 48.51 59.39 48.17 48.86 48.31 49.45 58.34            
111 48.46 48.44 50.06 48.92 48.44 48.86 48.67 48.47 48.48 48.92 48.32 48.32 48.23 48.41 48.18 48.70 48.33 48.81 48.69 49.07 48.58 48.78 48.26 49.38 50.26            
112 48.15 48.16 49.29 49.14 49.59 48.74 48.65 48.75 48.19 50.25 48.22 48.22 48.33 48.51 48.09 48.42 48.22 55.38 48.82 48.63 55.22 48.72 48.52 48.66 1:37.07            
113 48.23 48.24 48.73 48.55 48.66 49.23 48.49 49.37 48.26 48.77 48.12 48.11 48.25 48.78 48.22 48.47 48.30 50.52 48.73 48.64 48.77 48.91 48.51 49.11 59.85            
114 48.60 48.61 48.59 48.58 48.57 49.11 48.69 49.00 48.57 48.52 48.05 48.06 48.27 48.39 48.45 48.42 48.31 49.55 48.62 48.67 48.83 49.05 48.34 48.32 48.92            
115 48.02 48.03 48.78 48.32 48.78 48.54 48.39 48.56 48.54 49.68 48.08 48.09 48.30 48.49 48.34 48.63 48.00 49.58 1:46.91 48.63 48.78 48.76 48.33 48.35 49.45            
116 48.10 48.08 48.43 48.21 48.52 48.43 48.51 48.37 49.29 49.39 48.14 48.16 48.03 48.43 48.33 48.74 48.13 49.50 59.15 48.63 48.57 48.58 48.74 48.61 49.16            
117 48.37 48.36 48.51 48.35 48.75 48.11 48.24 48.10 48.35 48.91 48.11 48.08 48.11 48.22 48.51 48.47 47.97 49.57 48.73 48.53 48.54 48.57 48.40 48.55 48.93            
118 48.28 48.29 49.06 48.33 48.66 48.49 48.21 48.47 48.25 48.92 48.40 48.40 47.97 48.22 48.35 48.44 48.38 49.13 48.65 48.57 48.46 48.60 48.27 48.42 48.68            
119 48.27 48.26 48.68 48.38 48.71 48.40 48.22 48.29 48.39 49.02 48.20 48.20 48.38 48.24 48.49 48.35 48.01 49.14 48.81 48.42 48.33 48.53 48.58 48.42 48.33            
120 48.23 48.23 48.69 48.28 48.75 48.25 48.60 48.11 48.38 48.83 48.11 48.11 48.01 48.46 48.26 48.52 48.06 49.21 48.64 48.63 48.48 48.62 48.53 48.46 48.27            
121 48.22 48.24 48.57 48.13 48.56 48.50 48.18 48.63 48.19 48.97 48.00 48.02 48.10 48.16 48.32 48.30 48.41 49.17 48.68 48.51 48.51 48.55 48.56 48.52 48.48            
122 48.31 48.27 48.54 48.51 48.56 48.57 47.90 48.38 48.30 48.88 48.14 48.11 48.26 47.90 48.22 48.54 48.84 49.71 48.48 48.63 48.58 48.57 48.64 48.44 48.81            
123 48.18 48.20 48.68 48.43 48.66 48.37 47.96 48.56 49.17 49.12 48.10 48.11 48.70 47.93 48.42 48.84 49.33 49.49 48.54 48.54 48.55 48.43 48.52 48.69 48.69            
124 48.18 48.16 48.72 48.56 48.74 48.26 47.97 48.26 49.17 49.08 48.02 48.04 48.40 47.99 48.51 48.58 48.56 49.11 48.59 48.51 48.49 49.33 48.43 48.46 48.29            
125 48.19 48.18 48.79 48.56 48.53 48.21 48.19 48.18 48.37 49.00 47.91 47.89 48.58 48.14 48.34 48.73 48.29 48.87 48.81 48.62 48.40 48.71 48.37 48.60 48.34            
126 48.21 48.22 48.85 48.49 48.56 48.21 48.10 48.38 48.57 48.95 48.03 48.03 48.52 48.16 48.29 48.46 48.48 49.29 48.45 48.64 48.48 48.51 48.35 48.32 48.38            
127 48.26 48.27 48.67 48.52 48.86 48.35 48.38 48.21 49.06 49.57 48.21 48.21 48.49 47.95 48.20 48.34 48.27 49.12 48.57 48.57 48.61 48.78 48.46 48.33 48.74            
128 48.13 48.13 48.68 48.57 48.72 48.40 48.70 48.07 48.76 49.55 48.51 48.58 48.29 48.19 48.26 48.52 48.62 50.47 48.77 48.71 48.43 48.71 48.28 48.62 48.33            
129 48.31 48.32 48.74 48.39 48.69 48.90 48.89 48.27 48.36 49.66 48.68 48.60 48.46 48.28 48.24 48.36 48.52 51.34 48.77 48.63 48.50 48.60 48.61 48.29 48.52            
130 48.28 48.29 48.62 48.54 48.50 48.67 48.30 48.42 48.34 49.65 48.04 48.06 48.52 48.37 48.42 1:16.53 48.47 54.03 48.76 48.52 48.29 48.36 48.48 48.50 48.52            
131 48.23 48.23 48.64 48.59 48.81 48.86 48.00 48.43 48.39 49.07 48.14 48.13 48.54 48.40 48.31 59.63 48.32 52.72 48.74 48.65 48.39 48.24 48.24 48.50 1:11.83            
132 48.30 48.26 48.47 48.45 48.50 48.51 48.34 48.30 48.43 49.40 48.33 48.33 48.32 48.26 48.33 49.23 48.41 51.63 48.60 48.18 48.49 48.51 48.45 49.17 57.08            
133 48.18 48.21 48.55 48.54 48.67 48.73 48.49 48.20 1:19.63 49.24 48.43 48.47 48.40 48.26 48.37 48.65 48.36 56.65 48.50 50.79 49.40 49.70 49.12 55.67 1:30.14            
134 48.27 48.26 48.56 48.77 48.55 48.64 48.63 48.35 59.41 49.34 48.68 48.64 48.41 48.26 56.27 51.02 50.48 59.02 48.67 54.09 54.52 56.90 54.16 1:09.39 1:32.92            
135 48.25 48.26 54.65 49.62 52.21 49.82 54.41 50.11 57.83 51.53 49.27 48.90 51.15 49.82 53.51 54.20 54.31 1:05.70 51.37 1:11.73 1:13.46 1:05.70 1:14.54 1:54.96 1:44.82            
136 51.80 51.51 1:04.32 54.99 1:04.02 54.14 54.32 54.25 54.16 55.76 57.22 57.62 54.11 56.49 1:15.72 1:11.20 1:14.09 58.28 59.76 1:55.97 1:56.24 1:55.03 1:56.92 1:46.63 51.11            
137 1:26.91 1:26.57 55.11 1:13.45 58.30 1:11.06 1:14.41 1:11.34 49.37 1:56.56 1:15.66 1:15.91 1:14.08 1:17.23 1:56.23 1:54.77 1:55.49 1:47.06 1:44.01 1:46.67 1:47.16 1:45.83 1:46.81 52.81              
138 1:55.63 1:56.12 1:48.49 1:54.43 1:42.76 1:52.15 1:54.90 1:54.01 1:31.49 1:00.22 1:55.48 1:55.41 1:54.81 1:55.54 1:49.45 1:46.84 1:49.16 1:45.36 1:45.01 51.35 52.21 53.57                  
139 1:49.16 1:49.29 1:46.61 1:47.14 1:46.54 1:46.84 1:48.32 1:46.94 1:46.63 1:30.55 1:48.93 1:48.75 1:48.42 1:49.08 51.35 50.87 52.24 51.16 55.29                        
140 50.92 51.05 51.08 51.41 51.02 51.73 52.69 52.15 51.37 51.16 52.86 53.59 53.70 54.32                                  

Lap by Lap Chart (click to enlarge)

Race Progress Chart (click to enlarge)