mpRes » Single Event » Kyoto 250 » 2 » Race 3de | en

Kyoto 250 Season 2 - Race 3 (replay) download
Version LfS 0.5Z XRT RB4 FZ5 KY1
Time 07.03.2009, 16:06:41
Distance 140 Laps (417.12 km)
Daytime Afternoon
Weather Cloudy
Wind Low (3.60 km/h)
Statistics Tables

Race Result

Pos. (Start) Name Car Laps Total Time Gap [s] Stops Open Penalties Best Lap Leading Laps LH AU SH BH AC CV ST
31 of 31 cars finished the race.
1 (+1) 9 P.Diaz XRT 140 2h 20:24.12 0 - 47.57 63 (4, 56-98, 122-140) X X X W
2 (+1) 16 N.Scott XRT 140 + 1.37 0 - 47.57 57 (12-55, 99, 101-104, 107-114) X X W
3 (+5) 12 K.Järve XRT 140 + 10.40 + 9.03 2 - 48.12 0 X X W
4 (+15) 73 K.O'Keefe XRT 140 + 10.67 + 0.27 1 - 47.99 8 (100, 115-121) X X W
5 (-1) 5 S.Burlovich XRT 140 + 11.11 + 0.44 1 - 48.07 0 X X W
6 (+22) 4 N.Ðaković XRT 140 + 12.78 + 1.67 4 - 48.12 0 X X W
7 (+6) 828 A.Hőnyi XRT 140 + 12.85 + 0.07 2 - 48.12 0 X X X W
8 (+2) 54 O. Maška XRT 140 + 13.58 + 0.73 1 - 47.96 0 X X W
9 (+6) 66 D.Richardson XRT 140 + 19.06 + 5.48 1 - 48.25 0 X X W
10 (+15) 77 D. Buck XRT 140 + 26.92 + 7.86 3 - 48.27 0 X X W
11 (+18) 19 M.Kurt XRT 140 + 49.52 + 22.60 1 - 48.36 2 (105-106) X X W
12 (+5) 13 T.Martelle XRT 139 + 1 Lap + 1 Lap 3 - 48.17 0 X X W
13 (+7) 808 K.Myers XRT 139 + 1 Lap + 3.46 5 - 48.23 0 X X W
14 (+9) 648 M.Dagli XRT 139 + 1 Lap + 10.39 2 - 48.43 0 X X W
15 (-1) 2 Z.Cagaš XRT 138 + 2 Laps + 1 Lap 2 - 47.88 0 X X W
16 (+2) 41 E.Derinay XRT 136 + 4 Laps + 2 Laps 2 - 48.50 0 X X X W
17 (+4) 55 B. Holmberg XRT 134 + 6 Laps + 2 Laps 4 - 48.11 0 X X W
18 (+8) 991 S.Martin XRT 132 + 8 Laps + 2 Laps 7 - 48.82 0 X X X W
19 (-7) 7 Ü.Mikk XRT 108 + 32 Laps + 24 Laps 2 - 48.09 0 X X X W
20 (+4) 777 D.Stefanov XRT 106 + 34 Laps + 2 Laps 1 - 48.68 0 X X W
21 (-10) 38 J.Bjornson XRT 103 + 37 Laps + 3 Laps 1 - 48.29 0 X X W
22 (-15) 14 B.Goga XRT 102 + 38 Laps + 1 Lap 1 - 47.86 0 X X W
23 (-17) 1 C.Kilpatrick XRT 92 + 48 Laps + 10 Laps 1 - 47.88 0 X X X W
24 (-8) 61 J.Wang XRT 91 + 49 Laps + 1 Lap 1 - 48.20 0 X X W
25 (-16) 333 V.Lombardi XRT 58 + 82 Laps + 33 Laps 2 - 48.31 0 X X X W
26 (-25) 91 K.Kliaudaitis XRT 31 + 109 Laps + 27 Laps 0 - 48.49 10 (1-3, 5-11) X X W
27 (±0) 10 T. El Alaoui XRT 5 + 135 Laps + 26 Laps 0 - 1:31.73 0 X X X W
28 (+2) 53 Y. Laprevotte XRT 5 + 135 Laps + 0.47 0 - 1:31.35 0 X X M
29 (-24) 33 B.Keough XRT 3 + 137 Laps + 2 Laps 0 - 1:34.58 0 X X W
30 (-8) 50 H.K.Fung XRT 2 + 138 Laps + 1 Lap 0 - 1:34.42 0 X X M
31 (±0) Jack Atkinson RB4 1 + 139 Laps + 1 Lap 0 - 8:32.72 0 X W

Pitstops

Name Lap Work Time [s] Total
23 cars made 50 pitstops with a total time of 25:20.43
61 J.Wang 63 131074_0_0 11.41 11.41
14 B.Goga 95 131074_0_0 13.77 13.77
73 K.O'Keefe 49 131074_0_0 22.38 22.38
19 M.Kurt 48 131074_0_0 27.62 27.62
38 J.Bjornson 47 174242_15_0 32.89 32.89
333 V.Lombardi 46 212994_0_0 39.17 39.17
59 65538_0_0 0.00
828 A.Hőnyi 95 131074_0_0 14.45 40.01
105 36930_0_0 25.56
54 O. Maška 95 176322_10_0 44.71 44.71
66 D.Richardson 47 178402_15_0 48.24 48.24
5 S.Burlovich 47 178402_15_0 48.55 48.55
777 D.Stefanov 76 168162_12_0 57.58 57.58
2 Z.Cagaš 47 141474_15_0 26.49 57.82
128 36946_0_0 31.33
1 C.Kilpatrick 39 179442_15_0 57.99 57.99
12 K.Järve 13 17426_0_0 20.89 59.77
63 162018_15_0 38.88
648 M.Dagli 101 139458_10_0 33.16 1:03.76
109 135234_0_0 30.60
7 Ü.Mikk 32 152642_0_0 32.40 1:10.19
104 45266_10_0 37.79
77 D. Buck 7 36946_0_0 31.33 1:22.11
32 33874_0_0 31.33
90 131074_0_0 19.45
41 E.Derinay 52 169042_0_0 1:04.55 1:41.90
113 169042_0_0 37.35
4 N.Ðaković 47 131074_0_0 6.95 1:42.20
52 36930_0_0 26.17
94 36930_0_0 25.31
103 44274_15_0 43.77
13 T.Martelle 47 141474_15_0 24.74 1:56.87
104 179442_15_0 1:06.40
111 36882_0_0 25.73
808 K.Myers 47 145570_15_0 31.23 2:09.34
95 17426_0_0 19.33
104 37954_0_0 31.40
109 32834_0_0 20.40
117 36930_0_0 26.98
55 B. Holmberg 44 37954_0_0 36.79 2:16.82
91 178402_15_0 43.37
107 20546_0_0 19.33
121 37970_0_0 37.33
991 S.Martin 48 131138_0_0 20.34 2:35.33
74 10402_15_0 13.89
78 168130_8_0 37.24
90 20546_0_0 20.29
99 20546_0_0 19.32
106 131074_0_0 12.92
126 45250_10_0 31.33

Average Lap and Stability

Name Average Lap Stability
Sort: Time Veloc. [km/h] Laps Difference [s]
First lap isn't considered for std. deviation.
50 H.K.Fung 1:39.19 108.14 2 0.00
Jack Atkinson 8:32.72 20.92 1 0.00
33 B.Keough 1:36.62 111.01 3 2.56
10 T. El Alaoui 1:36.08 111.64 5 3.10
53 Y. Laprevotte 1:36.17 111.53 5 3.44
61 J.Wang 59.10 181.49 91 17.57
14 B.Goga 58.78 182.49 102 17.91
38 J.Bjornson 58.69 182.76 103 18.09
828 A.Hőnyi 1:00.26 177.98 140 18.53
648 M.Dagli 1:00.78 176.49 139 18.59
77 D. Buck 1:00.36 177.69 140 18.60
777 D.Stefanov 1:01.28 175.03 106 18.94
19 M.Kurt 1:00.53 177.21 140 19.05
1 C.Kilpatrick 59.63 179.88 92 19.07
12 K.Järve 1:00.25 178.04 140 19.16
7 Ü.Mikk 1:01.03 175.75 108 19.30
9 P.Diaz 1:00.17 178.26 140 19.36
16 N.Scott 1:00.18 178.23 140 19.37
73 K.O'Keefe 1:00.25 178.03 140 19.45
54 O. Maška 1:00.27 177.97 140 19.62
66 D.Richardson 1:00.31 177.85 140 19.86
5 S.Burlovich 1:00.25 178.02 140 20.12
2 Z.Cagaš 1:01.05 175.69 138 20.23
333 V.Lombardi 1:04.24 166.98 58 20.51
991 S.Martin 1:04.08 167.40 132 20.52
41 E.Derinay 1:02.08 172.77 136 20.98
4 N.Ðaković 1:00.26 177.99 140 21.06
808 K.Myers 1:00.70 176.70 139 21.29
13 T.Martelle 1:00.68 176.78 139 21.51
91 K.Kliaudaitis 1:09.76 153.76 31 21.82
55 B. Holmberg 1:02.90 170.52 134 32.88

Sector Times

Name Best Sector 1 Best Sector 2 Best Possibe Lap Best Lap
Sort: Time Gap [s] Lap Time Gap [s] Lap Time Gap [s] Time Gap [s] Lap
Combined Best Lap: 47.51
16 N.Scott 16.53 --- 126 30.98 --- 125 47.51 0.06 47.57 --- 126
9 P.Diaz 16.53 --- 126 30.99 0.01 125 47.52 0.05 47.57 --- 126
14 B.Goga 16.69 0.16 23 31.17 0.19 88 47.86 --- 47.86 0.29 88
2 Z.Cagaš 16.64 0.11 101 31.20 0.22 138 47.84 0.04 47.88 0.31 137
1 C.Kilpatrick 16.64 0.11 55 31.19 0.21 54 47.83 0.05 47.88 0.31 54
54 O. Maška 16.68 0.15 35 31.18 0.20 127 47.86 0.10 47.96 0.39 127
73 K.O'Keefe 16.68 0.15 71 31.18 0.20 75 47.86 0.13 47.99 0.42 75
5 S.Burlovich 16.74 0.21 22 31.26 0.28 137 48.00 0.07 48.07 0.50 137
7 Ü.Mikk 16.71 0.18 91 31.35 0.37 56 48.06 0.03 48.09 0.52 91
55 B. Holmberg 16.73 0.20 44 31.33 0.35 54 48.06 0.05 48.11 0.54 86
828 A.Hőnyi 16.71 0.18 79 31.31 0.33 135 48.02 0.10 48.12 0.55 133
12 K.Järve 16.77 0.24 134 31.23 0.25 24 48.00 0.12 48.12 0.55 24
4 N.Ðaković 16.74 0.21 92 31.31 0.33 131 48.05 0.07 48.12 0.55 133
13 T.Martelle 16.77 0.24 23 31.33 0.35 129 48.10 0.07 48.17 0.60 129
61 J.Wang 16.68 0.15 35 31.36 0.38 69 48.04 0.16 48.20 0.63 35
808 K.Myers 16.75 0.22 75 31.41 0.43 38 48.16 0.07 48.23 0.66 42
66 D.Richardson 16.86 0.33 42 31.28 0.30 28 48.14 0.11 48.25 0.68 28
77 D. Buck 16.78 0.25 117 31.41 0.43 57 48.19 0.08 48.27 0.70 58
38 J.Bjornson 16.76 0.23 71 31.40 0.42 38 48.16 0.13 48.29 0.72 92
333 V.Lombardi 16.77 0.24 40 31.43 0.45 23 48.20 0.11 48.31 0.74 25
19 M.Kurt 16.76 0.23 85 31.48 0.50 71 48.24 0.12 48.36 0.79 71
648 M.Dagli 16.89 0.36 86 31.51 0.53 82 48.40 0.03 48.43 0.86 86
91 K.Kliaudaitis 16.80 0.27 21 31.53 0.55 19 48.33 0.16 48.49 0.92 22
41 E.Derinay 16.90 0.37 32 31.55 0.57 131 48.45 0.05 48.50 0.93 34
777 D.Stefanov 16.90 0.37 25 31.67 0.69 56 48.57 0.11 48.68 1.11 56
991 S.Martin 16.97 0.44 36 31.78 0.80 38 48.75 0.07 48.82 1.25 42
53 Y. Laprevotte 33.04 16.51 2 57.84 26.86 5 1:30.88 0.47 1:31.35 43.78 5
10 T. El Alaoui 32.86 16.33 2 57.93 26.95 1 1:30.79 0.94 1:31.73 44.16 5
50 H.K.Fung 33.22 16.69 2 60.70 29.72 1 1:33.92 0.50 1:34.42 46.85 2
33 B.Keough 33.29 16.76 4 60.92 29.94 1 1:34.21 0.37 1:34.58 47.01 3
Jack Atkinson 55.89 39.36 1 456.83 425.85 1 8:32.72 --- 8:32.72 465.15 1

Flags

Name Yellows Caused Blues Seen
31 cars caused 2588 yellow and 17 cars got 766 blue flags.
9 P.Diaz 105 0
16 N.Scott 115 0
12 K.Järve 112 25
73 K.O'Keefe 120 0
5 S.Burlovich 104 0
4 N.Ðaković 98 48
828 A.Hőnyi 115 0
54 O. Maška 112 0
66 D.Richardson 106 0
77 D. Buck 103 75
19 M.Kurt 118 1
13 T.Martelle 102 57
808 K.Myers 90 48
648 M.Dagli 89 35
2 Z.Cagaš 112 5
41 E.Derinay 106 86
55 B. Holmberg 94 101
991 S.Martin 91 64
7 Ü.Mikk 84 91
777 D.Stefanov 84 32
38 J.Bjornson 76 0
14 B.Goga 68 0
1 C.Kilpatrick 62 63
61 J.Wang 63 15
333 V.Lombardi 56 0
91 K.Kliaudaitis 45 0
10 T. El Alaoui 21 0
53 Y. Laprevotte 19 0
33 B.Keough 81 11
50 H.K.Fung 31 9
Jack Atkinson 6 0

Penalties

Name Lap Description
3 cars got a total of 3 penalties.
19 M.Kurt 23 DT (Admin)
26 DT Cleared
648 M.Dagli 101 DT (Speeding)
105 DT Cleared
7 Ü.Mikk 32 DT (Speeding)
48 DT Cleared

Lap by Lap Analysis

Lap 9 P.Diaz 16 N.Scott 12 K.Järve 73 K.O'Keefe 5 S.Burlovich 4 N.Ðaković 828 A.Hőnyi 54 O. Maška 66 D.Richardson 77 D. Buck 19 M.Kurt 13 T.Martelle 808 K.Myers 648 M.Dagli 2 Z.Cagaš 41 E.Derinay 55 B. Holmberg 991 S.Martin 7 Ü.Mikk 777 D.Stefanov 38 J.Bjornson 14 B.Goga 1 C.Kilpatrick 61 J.Wang 333 V.Lombardi 91 K.Kliaudaitis 10 T. El Alaoui 53 Y. Laprevotte 33 B.Keough 50 H.K.Fung Jack Atkinson
Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph
Total 2h 20:24.12 2h 20:25.49 2h 20:34.52 2h 20:34.79 2h 20:35.23 2h 20:36.90 2h 20:36.97 2h 20:37.70 2h 20:43.18 2h 20:51.04 2h 21:13.64 2h 20:34.00 2h 20:37.46 2h 20:47.85 2h 20:25.17 2h 20:43.15 2h 20:28.70 2h 20:57.90 1h 49:51.17 1h 48:15.65 1h 40:45.03 1h 39:55.25 1h 31:25.91 1h 29:38.15 1h 02:05.77 36:02.53 8:00.38 8:00.85 4:49.87 3:18.37 8:32.72
+ 1.37 + 10.40 + 10.67 + 11.11 + 12.78 + 12.85 + 13.58 + 19.06 + 26.92 + 49.52 + 1 Lap + 1 Lap + 1 Lap + 2 Laps + 4 Laps + 6 Laps + 8 Laps + 32 Laps + 34 Laps + 37 Laps + 38 Laps + 48 Laps + 49 Laps + 82 Laps + 109 Laps + 135 Laps + 135 Laps + 137 Laps + 138 Laps + 139 Laps
100%: 47.57 101%: 48.05 103%: 49.00 105%: 49.95 107%: 50.90 >107%: >50.90 Pitstop Takeover Penalty Lap Rejoin
1 1:39.77 1:39.98 1:40.83 1:43.23 1:40.15 1:45.58 1:41.85 1:41.09 1:42.16 1:44.66 1:45.57 1:42.53 1:43.58 1:44.14 1:41.78 1:43.15 1:43.69 1:45.10 1:41.39 1:44.23 1:41.53 1:40.64 1:40.49 1:42.24 1:41.07 1:39.77 1:45.34 1:46.55 1:40.22 1:43.95 8:32.72
2 1:34.88 1:34.88 1:34.76 1:34.31 1:34.85 1:34.20 1:34.91 1:34.88 1:34.91 1:34.42 1:33.99 1:34.82 1:34.46 1:34.44 1:34.89 1:34.54 1:34.37 1:34.38 1:34.95 1:34.47 1:34.93 1:34.98 1:34.81 1:34.83 1:35.03 1:34.85 1:34.00 1:33.77 1:35.07 1:34.42  
3 1:34.65 1:34.65 1:34.74 1:34.69 1:34.60 1:35.04 1:34.63 1:34.64 1:34.61 1:35.04 1:35.48 1:34.60 1:34.64 1:35.00 1:34.61 1:34.65 1:34.62 1:34.88 1:34.72 1:34.55 1:34.68 1:34.61 1:34.60 1:34.61 1:34.74 1:34.66 1:35.54 1:35.47 1:34.58    
4 1:34.65 1:34.75 1:34.72 1:35.14 1:34.67 1:34.46 1:34.90 1:34.83 1:34.93 1:34.36 1:33.80 1:35.04 1:34.92 1:34.56 1:35.00 1:34.90 1:35.04 1:34.44 1:34.77 1:34.80 1:34.80 1:34.70 1:34.66 1:34.99 1:34.75 1:34.68 1:33.77 1:33.71      
5 1:33.48 1:33.23 1:32.98 1:32.14 1:33.31 1:30.71 1:32.48 1:32.88 1:32.48 1:31.79 1:31.52 1:32.42 1:32.56 1:32.00 1:32.45 1:32.69 1:32.00 1:31.93 1:32.86 1:32.55 1:32.59 1:32.99 1:33.24 1:32.50 1:32.81 1:33.43 1:31.73 1:31.35      
6 1:03.27 1:02.86 1:04.44 1:08.44 1:03.54 1:08.71 1:06.31 1:05.00 1:06.84 1:15.30 1:15.75 1:07.56 1:09.60 1:11.41 1:06.97 1:09.41 1:08.63 1:13.66 1:05.97 1:12.44 1:05.63 1:04.23 1:03.68 1:07.44 1:05.44 1:02.71          
7 1:29.44 1:29.52 1:28.81 1:27.88 1:29.27 1:28.11 1:28.39 1:28.33 1:28.41 2:10.75 1:25.81 1:28.50 1:28.27 1:27.02 1:28.29 1:27.97 1:28.22 1:26.26 1:28.14 1:26.60 1:28.40 1:28.85 1:29.17 1:28.21 1:28.44 1:29.54          
8 1:35.01 1:35.04 1:35.07 1:34.04 1:35.07 1:33.67 1:34.79 1:35.09 1:34.52 1:00.89 1:32.24 1:34.21 1:34.60 1:34.58 1:34.57 1:33.96 1:33.72 1:33.25 1:35.09 1:33.97 1:34.96 1:35.01 1:35.11 1:34.60 1:34.99 1:35.07          
9 1:33.80 1:33.82 1:34.16 1:34.76 1:33.95 1:35.58 1:34.35 1:34.40 1:34.22 1:24.54 1:37.03 1:34.43 1:35.81 1:36.54 1:34.32 1:35.85 1:34.97 1:36.99 1:34.35 1:36.52 1:34.36 1:34.15 1:33.98 1:34.08 1:34.31 1:33.83          
10 1:34.41 1:34.44 1:33.95 1:34.08 1:34.28 1:34.11 1:33.97 1:33.72 1:33.90 1:32.20 1:32.20 1:34.28 1:33.23 1:32.40 1:33.90 1:33.76 1:34.26 1:32.09 1:34.14 1:32.52 1:34.12 1:34.06 1:34.23 1:33.90 1:34.17 1:34.45          
11 1:31.96 1:32.03 1:31.41 1:29.58 1:31.91 1:28.88 1:30.75 1:31.06 1:31.02 1:27.22 1:27.82 1:29.81 1:28.23 1:28.05 1:30.94 1:28.19 1:29.16 1:27.68 1:30.80 1:27.59 1:30.75 1:31.56 1:31.74 1:30.44 1:30.66 1:32.11          
12 51.02 51.06 51.69 50.94 52.08 51.03 51.17 52.28 51.61 53.01 51.94 52.07 51.06 53.74 51.50 52.10 51.41 56.57 51.37 51.98 51.70 52.33 51.86 51.18 51.90 51.66          
13 51.12 50.71 2:00.25 56.66 51.87 58.01 54.29 54.29 56.98 1:03.62 1:01.68 1:00.00 1:00.05 1:01.87 57.15 1:01.24 58.91 1:05.05 54.62 1:02.19 56.93 53.79 53.95 55.58 55.46 51.32          
14 1:25.57 1:25.80 1:18.59 1:21.22 1:24.30 1:20.01 1:22.33 1:22.35 1:21.17 1:15.78 1:17.12 1:19.38 1:19.13 1:17.03 1:21.05 1:18.69 1:19.69 1:12.37 1:22.32 1:17.33 1:21.35 1:22.55 1:22.62 1:21.85 1:22.26 1:25.33          
15 1:33.92 1:33.97 50.24 1:33.54 1:33.61 1:33.49 1:33.64 1:33.55 1:33.34 1:32.64 1:32.46 1:32.86 1:32.84 1:32.04 1:33.43 1:32.56 1:33.43 1:33.21 1:33.69 1:32.21 1:33.62 1:33.51 1:33.54 1:33.54 1:33.67 1:33.78          
16 1:34.55 1:34.43 1:29.11 1:34.91 1:34.70 1:35.57 1:34.83 1:34.71 1:35.27 1:37.27 1:37.22 1:37.14 1:37.33 1:37.75 1:35.10 1:37.35 1:35.94 1:36.39 1:34.76 1:37.52 1:34.79 1:34.86 1:34.74 1:34.87 1:34.74 1:34.63          
17 1:33.14 1:33.34 1:25.05 1:31.36 1:32.85 1:31.10 1:32.26 1:32.46 1:31.53 1:29.94 1:26.81 1:29.62 1:28.93 1:28.28 1:31.54 1:30.09 1:30.90 1:27.19 1:32.68 1:30.31 1:32.11 1:32.32 1:32.70 1:31.66 1:32.29 1:32.95          
18 51.63 51.69 51.14 51.14 53.29 51.78 51.83 51.94 51.25 52.67 51.19 51.98 51.48 53.34 51.14 53.03 51.35 54.13 52.29 52.66 52.42 51.50 52.92 51.66 52.46 51.50          
19 48.70 48.51 48.59 48.68 49.23 49.74 48.54 48.59 49.19 49.97 49.62 49.04 49.04 51.88 48.82 49.93 49.11 51.34 49.31 50.29 49.63 48.54 50.13 49.44 48.93 48.70          
20 49.20 48.47 49.02 48.38 48.74 49.82 48.56 48.64 49.40 49.07 48.97 49.68 48.87 50.13 48.74 49.76 49.26 49.60 49.02 49.01 50.18 48.73 49.09 49.27 48.89 49.03          
21 48.76 48.49 48.92 48.50 48.39 49.61 48.52 48.80 49.14 48.63 48.57 50.54 48.59 50.84 48.40 49.27 48.55 48.97 49.49 48.89 49.12 49.03 49.33 48.63 48.56 48.72          
22 48.19 48.39 48.44 48.25 48.15 48.46 49.01 48.29 48.98 48.62 48.48 48.82 49.03 49.63 48.14 49.03 48.86 48.85 49.42 48.87 48.43 49.08 49.47 48.78 48.68 48.49          
23 48.40 48.33 48.65 48.68 49.07 48.70 48.62 49.44 48.45 48.39 48.56 48.52 48.90 48.84 48.57 50.09 48.26 49.07 52.03 48.81 48.71 49.41 50.71 49.01 48.48 49.27          
24 48.26 48.34 48.12 48.28 48.98 48.59 48.97 48.03 48.45 49.01 48.46 49.02 48.59 49.51 48.47 48.90 48.81 48.86 49.52 48.76 48.30 48.91 50.68 48.32 48.42 48.79          
25 48.35 48.39 48.36 48.31 48.51 48.58 48.36 48.62 48.42 51.96 1:08.36 48.63 48.72 49.51 48.68 49.43 48.31 49.72 49.81 48.77 48.62 48.43 49.59 48.36 48.31 48.74          
26 48.33 48.38 48.40 48.50 48.43 48.51 49.19 49.81 48.46 48.61 1:00.08 48.42 48.60 49.07 48.65 48.83 48.56 51.63 49.09 49.01 48.58 48.60 49.48 48.35 48.35 48.56          
27 48.23 48.33 48.34 48.40 48.88 48.51 49.03 48.70 48.69 48.52 48.45 48.49 48.50 49.47 48.49 48.84 48.21 50.28 49.29 49.09 48.38 48.62 50.07 48.46 48.87 48.69          
28 48.21 48.31 48.32 48.24 48.71 48.26 48.70 48.74 48.25 48.56 48.46 48.32 49.31 48.71 48.51 48.63 48.29 49.45 49.33 49.09 48.72 48.32 49.54 48.78 48.38 48.82          
29 48.29 48.25 48.45 48.31 48.61 48.71 48.59 48.95 50.56 48.66 48.68 48.50 48.90 49.18 48.46 48.70 49.73 49.46 49.30 49.50 48.73 48.23 49.36 48.65 48.90 50.06          
30 48.25 48.31 48.35 48.16 48.81 48.50 48.82 48.63 48.56 50.03 48.48 48.29 48.68 48.80 48.46 49.18 48.91 48.95 50.44 49.53 48.54 48.55 52.47 48.72 48.55 49.43          
31 48.28 48.40 48.57 48.25 48.71 49.57 48.68 48.74 48.29 48.99 48.44 48.38 48.66 49.74 48.48 48.81 49.18 49.37 49.73 49.21 48.32 48.43 50.79 48.80 48.76 48.96          
32 48.39 48.33 48.73 48.19 48.53 49.32 48.95 48.64 48.66 1:43.17 48.53 48.97 48.67 51.04 48.49 48.73 48.65 49.40 1:50.16 49.34 48.55 48.45 51.51 48.94 48.56            
33 48.32 48.35 48.39 48.30 48.95 48.68 48.84 48.78 48.49 59.33 49.05 48.69 48.68 50.86 48.43 48.83 48.71 51.42 1:01.11 49.26 48.55 48.95 51.30 48.59 48.53            
34 48.33 48.35 48.43 48.24 48.64 48.45 49.02 48.33 48.86 48.74 48.51 48.44 48.44 49.09 48.34 48.50 48.59 50.42 48.53 49.18 48.87 48.41 51.91 48.29 48.62            
35 48.31 48.29 48.57 48.23 48.20 48.35 48.45 48.02 48.35 48.71 48.77 48.21 48.50 48.82 48.37 48.60 48.74 49.74 48.31 49.03 48.49 48.30 52.11 48.20 48.35            
36 48.27 48.26 48.63 48.20 48.40 48.54 49.13 48.23 48.78 48.63 48.65 48.42 48.71 49.03 48.38 48.65 48.41 48.95 48.32 48.94 49.01 48.32 51.55 48.39 48.50            
37 48.32 48.27 48.28 48.25 48.33 48.59 48.49 48.23 48.49 48.32 48.50 48.52 48.41 48.98 48.32 48.60 48.43 49.57 48.81 48.98 48.55 48.49 52.85 48.33 48.67            
38 48.25 48.27 48.33 48.26 48.73 48.68 49.66 48.26 48.64 48.42 48.47 48.42 48.28 49.33 48.29 48.80 48.57 48.96 48.34 49.07 48.62 48.49 1:06.84 48.34 48.73            
39 48.37 48.34 48.30 48.19 48.37 48.71 49.18 48.24 48.73 48.62 48.51 48.94 49.35 52.07 48.28 48.96 49.26 51.21 48.33 49.32 48.96 48.68 2:21.09 48.38 48.61            
40 48.27 48.30 48.34 48.23 48.39 48.75 48.77 48.27 48.89 48.43 48.64 48.62 48.51 49.70 48.34 49.93 48.86 50.97 48.38 49.19 48.65 48.35 1:00.94 48.33 48.83            
41 48.29 48.34 48.39 48.20 48.32 48.62 48.54 48.21 48.49 48.52 48.50 48.46 48.53 49.32 48.24 48.63 48.30 49.12 48.41 49.35 48.67 48.39 49.54 48.47 49.10            
42 48.31 48.24 48.68 48.23 48.37 48.85 48.43 48.24 48.46 48.44 48.52 48.49 48.23 49.68 48.32 48.61 48.30 48.82 48.53 49.13 48.64 48.29 52.08 48.30 48.53            
43 48.26 48.19 48.51 48.23 48.39 49.21 48.78 48.11 48.74 49.03 48.89 48.64 48.54 48.92 48.36 49.16 48.53 49.12 48.59 48.85 48.57 48.36 57.72 48.33 48.54            
44 48.24 48.35 48.79 48.28 48.48 49.67 48.64 48.44 1:04.47 50.51 49.87 48.49 48.90 49.54 48.39 51.82 6:00.41 50.53 50.53 49.63 51.66 48.60 1:29.26 48.34 48.52            
45 50.00 50.03 49.91 49.78 50.44 54.43 50.38 50.45 53.19 50.72 49.51 55.76 55.64 49.36 50.15 53.29 1:21.77 50.45 48.81 53.45 53.68 50.71 1:28.53 50.15 49.84            
46 1:18.73 1:19.17 1:11.95 1:18.76 1:12.34 1:03.11 1:08.94 1:13.42 55.09 1:25.22 50.23 1:04.06 1:03.65 50.67 1:14.76 55.53 1:21.69 49.16 1:22.78 55.81 1:03.88 1:13.31 1:28.66 1:12.84 2:01.63            
47 1:31.25 1:31.28 1:30.94 1:31.43 2:33.71 1:57.82 1:31.14 1:31.12 2:32.51 1:24.91 1:24.77 2:10.26 2:16.90 1:24.97 2:12.06 1:28.22 1:28.84 1:22.82 1:34.21 1:27.22 2:18.46 1:31.23 1:26.53 1:31.28 1:03.05            
48 1:29.59 1:29.53 1:29.42 1:29.47 1:00.64 1:05.40 1:29.08 1:29.33 1:01.03 51.07 2:10.88 1:01.30 1:00.60 1:27.75 1:00.95 1:28.24 54.90 2:07.79 1:22.36 1:28.72 1:00.50 1:29.43 1:29.07 1:29.37 1:11.14            
49 1:29.01 1:29.08 1:28.64 2:04.53 1:01.37 1:26.06 1:28.73 1:28.91 56.50 49.39 1:03.00 1:19.45 1:15.31 1:27.69 1:21.35 1:28.64 49.39 1:08.57 1:28.49 1:28.00 1:13.12 1:28.74 52.86 1:28.71 1:27.47            
50 1:29.03 1:29.02 1:28.88 1:03.15 1:28.64 1:28.95 1:28.62 1:28.83 1:28.88 1:24.52 1:14.99 1:29.55 1:29.12 1:28.30 1:29.12 1:28.41 48.57 1:12.64 1:23.11 1:28.40 1:29.03 1:28.83 48.85 1:28.92 1:28.47            
51 1:29.02 1:29.04 1:28.35 1:23.61 1:24.86 1:26.37 1:28.28 1:28.88 1:24.79 1:24.26 1:24.40 1:25.88 1:27.14 1:27.75 1:25.88 1:28.23 48.31 1:24.46 54.94 1:27.78 1:25.47 1:28.54 48.30 1:28.68 1:27.32            
52 53.27 52.12 53.56 52.73 54.25 1:54.06 53.90 52.85 1:09.25 1:07.50 56.70 53.52 56.55 1:06.47 55.10 2:40.41 48.17 1:04.35 49.73 53.34 55.90 51.95 48.19 52.94 54.62            
53 48.69 48.77 48.88 48.42 49.15 59.90 50.21 48.46 49.15 48.84 48.77 48.99 48.91 51.05 48.90 1:04.65 48.19 53.97 49.86 50.08 48.78 48.84 48.02 48.71 50.76            
54 48.07 48.73 48.50 48.64 48.64 48.64 49.69 48.61 48.70 48.59 48.85 49.22 48.78 50.72 48.76 49.64 48.18 49.82 49.04 48.94 48.66 48.78 47.88 48.36 50.80            
55 48.20 48.66 48.52 48.32 48.64 48.84 49.12 48.69 48.74 48.40 48.80 49.50 48.66 50.08 48.71 49.35 48.65 52.30 49.24 48.77 48.54 49.02 47.96 48.42 51.11            
56 48.06 48.42 48.35 48.29 49.46 48.63 49.13 49.49 48.78 48.31 48.65 49.28 48.66 49.81 48.46 48.79 51.81 52.13 48.29 48.68 48.96 48.79 48.39 48.78 51.74            
57 47.83 48.21 48.41 48.29 48.40 48.48 48.55 48.73 48.50 48.28 48.64 48.31 48.46 49.17 48.38 49.15 49.58 49.19 48.72 48.71 48.74 48.21 48.23 48.37 51.62            
58 47.97 48.08 48.24 48.27 48.56 48.53 49.09 48.17 48.51 48.27 48.61 48.77 48.45 49.26 48.44 48.98 48.99 49.24 48.33 49.51 48.50 48.19 48.07 48.68 52.84            
59 48.40 48.20 50.59 48.32 48.72 48.50 48.69 48.76 48.86 48.39 52.66 48.63 50.39 49.17 48.45 48.80 49.06 49.49 49.09 48.91 48.57 48.22 48.23 49.49 Retired            
60 48.21 47.94 49.25 48.30 48.92 48.38 48.88 48.40 48.62 48.37 49.16 48.32 48.93 48.79 48.44 48.72 48.80 49.57 50.24 49.16 48.54 48.25 48.54 50.48              
61 48.08 48.10 48.83 48.33 49.57 48.59 48.72 48.49 48.64 48.31 48.55 49.31 48.58 48.93 48.51 48.83 48.45 49.39 48.73 48.91 48.88 48.27 48.31 48.89              
62 48.44 48.37 50.35 48.24 49.00 48.48 48.99 48.46 48.57 48.89 48.68 48.94 48.49 50.03 48.73 48.85 49.15 49.00 48.78 48.88 48.85 48.17 48.44 1:00.94              
63 48.33 48.29 1:51.63 48.34 48.40 48.50 48.37 48.40 48.60 48.60 48.41 48.53 48.59 48.89 48.52 48.72 49.29 49.20 48.60 48.77 48.46 48.30 48.08 1:31.57              
64 48.31 48.34 59.42 48.29 48.82 49.21 49.44 48.46 48.53 48.37 48.92 49.26 48.44 49.15 48.47 48.75 49.11 49.23 49.56 48.87 48.97 48.28 48.14 59.22              
65 48.45 48.54 48.63 48.20 49.02 48.52 49.73 48.41 48.43 48.38 48.75 49.14 48.85 49.18 48.35 48.69 49.29 50.19 49.08 48.81 49.49 48.27 48.14 49.00              
66 48.07 47.97 48.50 48.24 48.46 48.29 57.50 48.43 48.72 48.39 48.44 48.59 48.78 48.91 48.33 48.70 48.89 53.02 48.60 48.72 50.50 48.28 48.36 48.76              
67 48.14 48.20 48.36 48.38 48.66 48.47 51.38 48.46 48.47 48.44 48.64 48.62 48.50 48.67 48.40 48.67 48.79 53.73 48.45 48.79 49.14 48.29 48.08 48.59              
68 48.13 48.04 48.52 48.25 48.20 48.45 49.34 48.44 48.45 48.30 48.46 48.60 48.67 48.84 48.32 48.73 48.53 54.06 48.36 48.74 48.58 48.23 48.00 49.04              
69 48.37 48.60 48.47 48.31 48.44 48.35 48.98 48.52 48.70 48.36 48.38 48.58 48.50 48.68 48.57 48.66 49.41 52.06 48.46 48.86 48.78 48.18 48.23 48.31              
70 48.08 48.54 48.57 48.19 48.54 48.37 48.50 48.39 48.53 48.48 48.49 48.78 48.59 48.95 48.46 48.74 48.34 54.75 48.59 48.79 48.55 48.18 48.17 49.16              
71 48.00 47.93 48.37 48.20 48.59 48.43 48.95 48.13 48.58 48.40 48.36 48.82 48.71 51.83 48.42 48.73 48.51 50.95 48.72 48.98 48.45 48.16 48.48 48.90              
72 48.24 47.89 48.40 48.30 48.39 48.45 49.09 48.71 48.44 48.31 48.45 48.99 48.87 49.87 48.31 48.71 48.54 51.33 49.32 49.17 48.75 48.17 48.12 48.95              
73 48.17 48.16 48.46 48.25 49.11 48.42 48.78 48.06 48.69 48.32 48.58 49.00 48.69 48.97 48.62 48.79 48.51 55.87 48.84 49.42 48.89 48.21 48.11 48.82              
74 48.46 48.20 48.39 48.20 48.72 48.61 49.51 48.25 48.51 48.35 48.44 48.72 48.83 49.12 48.40 48.89 48.35 1:34.99 48.48 49.07 48.52 48.18 48.16 48.65              
75 48.13 48.20 48.34 47.99 48.46 48.48 48.97 48.36 48.57 48.43 48.49 48.45 48.39 48.99 48.36 49.22 48.49 1:16.98 48.35 48.92 48.78 48.12 48.26 48.53              
76 48.10 48.09 48.43 48.36 48.49 48.40 48.38 48.50 48.49 48.35 48.38 48.43 48.86 48.97 48.43 48.73 48.37 58.18 49.09 2:09.33 48.75 48.09 48.11 48.59              
77 48.17 48.17 48.34 48.22 48.59 48.53 48.40 48.36 48.59 48.62 48.69 48.42 48.65 48.75 48.40 48.77 48.26 52.31 48.49 1:01.12 48.99 48.22 48.16 48.70              
78 48.25 48.29 48.49 48.30 48.55 48.45 48.42 48.44 48.47 48.45 48.75 48.35 48.62 48.66 48.31 48.86 48.46 1:59.07 48.35 49.03 48.35 48.17 48.09 48.54              
79 48.12 48.24 48.60 48.19 48.91 48.45 48.31 48.44 48.61 48.30 48.65 48.55 48.89 48.79 48.34 48.69 49.17 1:03.19 48.41 48.81 48.47 48.13 48.12 48.58              
80 48.16 48.18 48.42 48.21 48.52 48.23 48.86 48.41 48.54 48.53 48.90 48.45 49.07 48.83 48.41 48.67 48.44 49.17 48.37 49.02 48.52 48.27 48.06 48.50              
81 48.10 48.03 48.46 48.21 48.46 48.34 48.42 48.37 48.63 48.40 48.41 48.43 48.44 48.65 48.36 48.66 48.45 51.31 48.74 49.08 48.46 48.32 48.04 48.68              
82 48.11 47.97 48.42 48.17 48.12 48.28 48.16 48.42 48.50 49.36 48.45 48.68 48.42 48.44 48.36 49.05 48.34 52.09 48.58 49.40 48.47 48.23 48.10 48.23              
83 48.06 48.04 48.48 48.20 48.31 48.80 48.58 48.46 48.51 48.64 48.56 48.69 48.37 50.08 48.28 49.61 48.32 52.42 48.36 49.40 48.55 48.04 48.27 48.42              
84 48.03 48.11 48.47 48.24 48.46 48.54 48.62 48.44 48.52 48.35 48.60 48.44 48.67 51.09 48.29 48.58 48.46 51.95 48.72 48.96 48.43 48.16 48.02 48.33              
85 48.11 48.04 48.45 48.18 48.50 48.35 48.39 48.35 48.49 48.39 48.96 48.36 49.09 48.88 48.28 48.84 48.32 50.75 48.56 48.99 48.51 48.17 48.22 48.52              
86 48.27 48.34 48.38 48.15 48.49 48.34 48.38 48.34 48.39 48.38 48.68 48.53 48.83 48.43 48.29 48.75 48.11 55.65 48.52 49.21 48.44 48.13 48.00 48.78              
87 48.02 47.95 48.43 48.28 48.31 48.54 48.55 48.42 48.53 48.82 48.56 48.43 48.56 48.65 48.27 48.80 49.61 50.63 48.49 49.14 48.49 48.16 48.14 48.53              
88 48.22 48.38 48.33 48.21 48.34 48.31 49.86 48.38 48.50 50.24 48.54 48.42 48.51 48.53 48.26 48.73 49.69 58.09 48.54 49.04 48.51 47.86 48.17 48.34              
89 47.99 47.82 48.47 48.19 48.57 48.25 48.80 48.45 48.45 48.88 48.60 48.47 48.62 50.95 48.33 48.68 48.65 1:22.83 48.40 49.47 48.45 48.09 48.35 48.22              
90 48.15 48.11 49.17 48.24 48.53 48.40 48.76 48.41 48.52 1:29.17 48.65 48.42 48.88 49.28 48.31 48.66 51.93 2:07.52 48.51 50.89 48.39 48.16 48.00 48.36              
91 48.26 48.31 48.35 48.16 48.47 48.27 48.65 48.47 48.52 58.73 48.58 48.38 48.81 49.47 48.24 59.18 2:04.36 1:09.94 48.09 50.09 48.46 48.07 48.59 48.34              
92 48.25 48.30 48.90 48.13 48.44 1:05.55 48.51 48.35 48.48 48.34 48.59 48.36 48.46 48.93 48.25 1:16.80 1:01.35 1:12.49 48.77 49.66 48.29 48.04 48.63                
93 48.00 47.98 49.16 48.20 48.44 51.99 49.73 48.33 48.54 51.15 48.46 48.39 48.68 51.61 48.25 1:27.92 59.88 53.77 52.42 1:01.67 48.61 48.02                  
94 54.69 54.84 53.70 50.75 49.24 1:39.79 51.26 50.97 50.05 59.83 50.76 53.53 52.29 1:14.06 51.38 1:29.05 1:22.35 49.83 1:04.93 1:26.17 52.13 55.90                  
95 1:23.14 1:23.20 1:25.87 1:21.69 1:08.68 59.74 1:33.71 2:16.25 59.91 1:26.52 1:03.96 1:05.00 1:38.37 1:00.17 1:14.97 1:28.55 52.37 49.22 1:27.41 1:27.44 1:04.30 1:49.47                  
96 1:29.21 1:29.21 1:26.94 1:28.27 1:28.29 58.28 1:01.77 1:01.07 1:26.38 1:27.81 1:26.57 1:27.55 59.58 52.08 1:28.20 54.16 48.78 50.10 1:26.62 1:26.91 1:27.06 1:06.52                  
97 1:29.45 1:29.44 1:26.20 1:29.29 1:29.15 1:20.83 1:13.59 1:04.37 1:27.66 1:26.43 1:28.73 1:29.07 1:20.63 1:12.93 1:29.27 49.50 48.65 50.36 1:28.72 52.55 1:28.76 1:27.06                  
98 1:28.89 1:28.68 52.60 1:28.42 1:28.15 51.67 1:25.82 1:24.38 1:27.60 52.15 1:27.62 1:28.03 1:26.92 1:25.31 1:28.42 49.16 48.33 58.19 52.04 1:03.93 1:27.90 1:27.52                  
99 51.65 51.24 49.08 51.41 51.81 48.41 51.85 51.07 52.62 48.86 51.74 51.86 52.48 53.14 51.55 50.68 49.07 1:56.75 49.85 49.01 52.06 51.85                  
100 48.41 48.51 48.46 48.33 48.22 48.62 49.53 49.21 49.04 48.48 49.17 49.20 49.23 49.11 48.53 49.76 52.88 1:14.86 48.91 48.91 48.98 49.48                  
101 48.49 48.45 48.34 48.69 48.31 49.93 49.75 48.84 49.36 48.43 48.63 49.13 49.12 1:52.80 48.11 1:08.25 1:40.13 1:39.29 49.49 51.18 48.65 48.89                  
102 48.25 48.30 48.43 56.72 49.29 1:17.02 50.44 48.36 49.27 48.98 48.64 48.68 52.28 1:05.31 49.07 1:10.08 1:41.65 1:38.63 55.27 1:01.23 48.88 48.30                  
103 48.14 48.13 51.79 48.99 48.33 3:11.74 49.10 48.50 49.63 55.68 48.64 52.83 55.56 1:07.64 48.40 1:25.11 1:38.60 1:33.54 1:01.27 1:18.49 50.53                    
104 53.26 53.05 1:39.27 51.81 52.05 59.63 1:07.42 55.55 52.91 1:35.82 55.12 2:59.91 2:47.36 1:24.07 52.33 2:05.43 1:37.45 1:02.11 2:06.05 1:39.10                      
105 1:40.57 1:40.50 1:42.97 1:36.49 1:41.59 56.42 1:53.27 1:27.67 1:27.24 1:42.67 1:27.82 1:12.31 1:16.66 1:12.08 1:41.09 1:38.74 1:36.02 1:27.88 1:04.88 1:38.21                      
106 1:42.96 1:43.10 1:37.84 1:40.51 1:42.17 49.33 1:11.97 1:25.62 1:25.45 1:39.08 1:24.91 1:38.54 1:38.09 1:37.35 1:42.44 1:34.09 59.82 2:11.66 1:37.07 1:38.49                      
107 1:39.24 1:39.28 53.13 1:38.65 1:39.08 1:11.11 1:38.09 2:04.43 2:04.56 1:37.52 2:05.23 1:38.82 1:38.56 1:38.92 1:39.14 1:11.81 1:58.70 1:10.33 1:38.96                        
108 1:37.72 1:37.71 52.69 1:38.04 1:37.71 1:32.84 1:39.13 1:38.77 1:38.70 1:36.43 1:38.38 1:32.52 1:33.23 1:33.63 1:37.85 1:18.77 1:13.85 1:22.33 1:33.09                        
109 1:36.08 1:36.18 1:32.28 1:35.46 1:35.73 58.49 1:33.38 1:34.69 1:34.61 59.48 1:35.34 1:15.66 2:02.95 2:19.04 1:35.87 1:36.61 1:32.52 54.31                          
110 58.34 58.20 1:01.19 58.61 58.42 1:29.18 59.89 1:09.54 1:05.07 1:13.90 59.59 1:16.32 59.74 1:07.77 58.83 1:35.25 1:31.35 56.23                          
111 1:30.21 1:30.24 1:26.71 1:30.14 1:30.25 1:37.28 1:28.62 1:21.42 1:25.28 50.31 1:29.31 2:15.85 1:08.18 50.86 1:30.14 1:33.52 51.63 56.82                          
112 1:37.22 1:37.21 1:36.96 1:37.36 1:37.33 1:34.16 1:37.15 1:36.57 1:36.81 1:04.78 1:37.30 1:03.42 1:33.37 1:26.33 1:37.26 1:00.77 48.83 1:11.29                          
113 1:34.47 1:34.50 1:34.37 1:34.31 1:34.35 1:32.65 1:34.07 1:34.67 1:34.35 1:34.79 1:34.22 1:22.16 1:31.56 1:31.52 1:34.37 2:03.76 49.65 1:35.42                          
114 1:33.76 1:33.86 1:32.85 1:33.60 1:33.78 51.42 1:33.36 1:32.92 1:33.43 1:32.56 1:33.69 1:05.39 51.33 55.83 1:33.83 1:05.63 1:26.51 1:40.97                          
115 51.63 51.66 51.70 50.94 51.53 48.84 52.15 51.77 52.48 51.05 51.46 49.35 48.70 51.65 51.75 1:25.56 1:35.55 54.30                          
116 48.63 48.63 49.09 48.65 48.62 50.29 49.06 48.40 49.53 49.38 49.27 53.42 1:02.93 56.27 49.56 1:38.93 1:42.38 56.66                          
117 49.32 48.93 58.88 48.78 49.48 1:14.02 50.09 1:00.80 50.24 1:01.67 51.45 1:11.11 1:56.55 1:13.87 49.46 54.01 53.41 50.83                          
118 1:28.45 1:28.73 1:19.08 1:28.77 1:28.39 48.90 1:26.61 1:17.32 1:25.35 1:17.28 1:26.24 1:34.93 1:00.95 1:35.58 1:27.20 49.29 49.30 49.04                          
119 1:36.52 1:36.50 1:36.32 1:36.48 1:36.52 1:05.53 1:36.51 1:36.17 1:36.22 1:35.44 1:36.29 1:41.38 1:33.13 1:40.44 1:36.51 49.06 49.17 50.05                          
120 1:41.03 1:41.00 1:40.54 1:41.08 1:41.14 1:38.72 1:40.95 1:40.33 1:41.10 1:39.87 1:40.85 52.87 52.53 53.07 1:41.08 48.79 49.15 49.05                          
121 51.88 52.51 52.41 52.19 53.14 52.21 53.11 52.34 53.37 52.79 52.06 48.94 49.25 49.75 52.89 49.68 2:08.71 49.73                          
122 48.69 48.47 49.62 48.90 48.84 49.09 49.16 48.86 49.34 49.37 49.04 48.81 48.96 49.11 48.84 49.03 59.16 50.64                          
123 48.77 48.64 49.09 48.71 48.81 49.23 48.61 49.41 49.24 50.01 49.23 48.55 49.24 48.77 49.58 48.84 48.49 50.52                          
124 47.89 47.89 49.70 48.36 49.10 49.79 49.73 49.64 49.19 48.97 50.07 48.35 48.65 49.79 49.36 49.27 48.37 50.80                          
125 47.65 47.65 49.11 48.75 48.45 49.71 49.50 48.81 49.55 49.97 49.10 48.46 48.84 49.24 48.63 48.66 48.64 53.14                          
126 47.57 47.57 48.74 48.73 48.61 48.47 49.37 48.78 48.85 49.20 49.10 48.34 48.61 48.95 48.50 48.66 48.25 1:52.96                          
127 47.91 47.93 48.45 48.56 48.28 48.39 48.73 47.96 48.59 49.06 49.20 48.36 48.72 49.51 49.26 48.70 48.34 1:06.44                          
128 48.10 48.10 48.44 48.56 48.17 48.88 48.44 48.20 49.38 49.30 1:01.98 48.55 48.51 48.78 1:59.40 48.73 48.30 50.60                          
129 48.10 48.11 48.30 48.53 48.19 48.29 48.38 48.29 49.24 49.33 50.18 48.17 48.31 49.31 59.91 48.68 48.19 51.27                          
130 47.93 47.91 48.19 48.55 48.20 48.37 48.51 48.39 49.05 49.95 50.21 48.66 48.56 49.11 48.66 48.54 48.23 50.47                          
131 48.23 48.25 48.23 48.45 48.08 48.15 48.36 48.19 48.77 49.14 50.22 48.58 48.56 48.53 52.59 48.52 48.23 50.30                          
132 48.16 48.14 48.51 48.37 48.30 48.14 48.20 48.32 48.96 49.28 50.09 48.27 48.88 48.77 49.72 48.86 48.34 49.57                          
133 48.11 48.13 48.26 48.66 48.33 48.12 48.12 49.99 48.54 49.12 50.34 48.91 48.77 50.47 48.24 48.66 48.25                            
134 48.11 48.10 48.35 48.62 48.80 48.32 48.31 49.12 48.95 49.65 50.35 49.25 48.82 50.28 48.25 48.61 48.27                            
135 47.97 48.23 48.27 48.67 49.09 48.52 48.19 48.12 48.90 49.44 50.98 48.48 48.83 48.90 48.15 48.58                              
136 48.14 48.57 48.24 48.36 48.22 48.37 48.28 48.25 49.05 49.67 50.95 48.35 48.62 48.63 48.36 48.75                              
137 48.14 48.63 48.29 48.36 48.07 48.44 48.59 48.57 48.66 49.26 50.14 48.43 48.73 48.71 47.88                                
138 48.15 48.32 48.22 48.86 48.50 48.36 48.66 48.81 48.60 49.23 50.24 48.45 48.63 48.59 47.95                                
139 48.05 47.88 48.34 49.25 48.29 48.65 48.64 48.65 48.72 49.06 50.02 48.71 48.77 48.93                                  
140 48.09 48.20 48.26 49.22 50.91 48.80 48.93 49.45 48.53 49.58 50.89                                        

Lap by Lap Chart (click to enlarge)

Race Progress Chart (click to enlarge)