mpRes » Single Event » Kyoto 250 » 1 » Racede | en

Kyoto 250 Season 1 - Race (replay) download
Version LfS 0.5Y14 XRT XRR KY1
Time 22.03.2008, 20:03:23
Distance 140 Laps (417.12 km)
Daytime Day
Weather Clear
Wind No Wind
Statistics Tables

Race Result

Pos. (Start) Name Car Laps Total Time Gap [s] Stops Open Penalties Best Lap Leading Laps LH AU SH BH AC CV ST
29 of 29 cars finished the race.
1 (+3) CoRe.DWB XRT 140 2h 22:38.34 1 - 48.10 25 (58-61, 111-112, 121-134, 136-140) X X W
2 (±0) W•マメŽPMD XRT 140 + 0.06 1 - 48.10 67 (8, 14-23, 30, 32-57, 77-105) X X X W
3 (±0) CoRe.BigTime XRT 140 + 0.17 + 0.11 1 - 48.06 21 (24-29, 31, 106-110, 113-120, 135) X X W
4 (+3) [¿] Sarge 91 XRT 140 + 2.04 + 1.87 3 - 48.15 0 X X X W
5 (+8) [TC]›Zoomy‹ XRT 140 + 4.67 + 2.63 1 - 48.38 0 X X X W
6 (+13) Niko XRT 137 + 3 Laps + 3 Laps 1 - 48.64 0 X W
7 (+10) Cimanu XRT 136 + 4 Laps + 1 Lap 2 - 49.09 0 X W
8 (+6) Konata-san XRT 135 + 5 Laps + 1 Lap 4 DT (Speeding) 48.92 0 X X M
9 (-1) 36 Starblue XRT 135 + 5 Laps + 9.75 3 - 48.45 0 X X W
10 (+10) yfb.Zz0 XRT 134 + 6 Laps + 1 Lap 2 - 49.20 0 X X W
11 (+12) -MarK'- XRT 133 + 7 Laps + 1 Lap 4 - 49.04 0 X X W
12 (+3) ァ。K.O'Keefe XRT 130 + 10 Laps + 3 Laps 3 - 48.30 0 X X W
13 (-7) °ァ。MistaTea XRT 108 + 32 Laps + 22 Laps 1 - 48.26 15 (62-76) X X W
14 (+14) [SR]LizardFolk XRT 100 + 40 Laps + 8 Laps 10 - 49.17 0 X X X W
15 (+1) LazLoW82 XRT 89 + 51 Laps + 11 Laps 1 DT (Admin) 48.61 0 X X W
16 (+6) D. Tarlau XRT 79 + 61 Laps + 10 Laps 2 DT (Speeding) 48.92 0 X W
17 (+1) [HR]NightFly XRT 69 + 71 Laps + 10 Laps 3 - 48.67 0 X X X M
18 (-8) [D1GP] ShanK XRT 60 + 80 Laps + 9 Laps 1 - 48.60 0 X X W
19 (+7) Quint XRT 51 + 89 Laps + 9 Laps 3 - 49.42 0 X X X X M
20 (+1) Touge¬M Akina XRT 39 + 101 Laps + 12 Laps 3 - 51.39 0 X X X W
21 (-9) [SR]Andrei221 XRT 38 + 102 Laps + 1 Lap 0 - 49.15 0 X X X X W
22 (+7) Keisu R. #0086 XRT 26 + 114 Laps + 12 Laps 0 - 49.18 0 X X W
23 (+1) [GWR]J Myster XRT 25 + 115 Laps + 1 Lap 0 - 51.16 0 X X W
24 (-23) W•マメ®Ice XRT 22 + 118 Laps + 3 Laps 2 - 48.43 12 (1-7, 9-13) X X X M
25 (-14) © [SR] Mutt XRT 18 + 122 Laps + 4 Laps 1 - 48.83 0 X W
26 (-17) [¿] Falcon 27 XRT 17 + 123 Laps + 1 Lap 1 - 49.36 0 X X X W
27 (-2) Stan XRT 12 + 128 Laps + 5 Laps 1 DT (Speeding) 59.75 0 X X X M
28 (-1) [SR]BlackBird XRT 1 + 139 Laps + 11 Laps 0 - 2:00.60 0 X X W
29 (-24) Stefan Alfons 99 XRT 0 + 140 Laps + 1 Lap 0 - 0.00 0 X X X W

Pitstops

Name Lap Work Time [s] Total
24 cars made 55 pitstops with a total time of 38:16.53
W•マメŽPMD 106 139394_10_0 11.19 11.19
[¿] Falcon 27 15 151618_0_0 22.36 22.36
LazLoW82 85 141314_3_0 23.75 23.75
°ァ。MistaTea 106 141474_15_0 26.52 26.52
Stan 13 139266_2_0 29.46 29.46
CoRe.DWB 62 141474_15_0 33.25 33.25
© [SR] Mutt 9 175282_15_0 39.51 39.51
[D1GP] ShanK 21 178418_15_0 47.18 47.18
Touge¬M Akina 29 169042_0_0 45.06 49.24
35 131074_0_0 4.18
40 131074_0_0 0.00
[TC]›Zoomy‹ 107 178418_15_0 50.86 50.86
W•マメ®Ice 15 151618_0_0 21.51 54.38
18 169026_0_0 32.87
CoRe.BigTime 53 162018_15_0 58.10 58.10
Niko 66 169042_0_0 1:00.91 1:00.91
[¿] Sarge 91 15 163842_0_0 16.23 1:23.54
106 178418_15_0 47.31
114 151618_0_0 20.00
D. Tarlau 7 168018_0_0 33.31 1:23.68
42 169170_8_0 50.37
Cimanu 30 178418_15_0 55.20 1:25.82
97 141474_15_0 30.62
yfb.Zz0 44 179442_15_0 1:01.42 1:38.83
128 47330_15_0 37.41
ァ。K.O'Keefe 62 169026_0_0 40.72 1:44.13
107 10402_15_0 13.33
114 48370_15_0 50.08
Quint 28 179442_15_0 1:08.09 1:59.91
42 10402_15_0 13.47
45 47330_15_0 38.35
-MarK'- 36 148690_8_0 33.12 2:07.64
87 155874_14_0 26.09
96 170050_1_0 32.10
128 176322_10_0 36.33
36 Starblue 27 48370_15_0 49.33 2:21.55
88 163042_15_0 54.89
102 178402_15_0 37.33
Konata-san 48 243938_15_0 55.77 2:47.99
60 47330_15_0 37.32
106 141474_15_0 18.99
135 179442_15_0 55.91
[HR]NightFly 31 169170_8_0 59.02 5:55.34
69 178402_15_0 4:56.32
70 141474_15_0 0.00
[SR]LizardFolk 15 169026_0_0 46.68 7:01.39
16 148482_0_0 24.62
41 151746_8_0 33.63
46 155730_2_0 33.67
53 168018_0_0 40.87
58 149570_1_0 21.78
79 168178_12_0 43.94
82 238674_2_0 38.38
86 37954_0_0 1:45.90
87 29762_2_0 31.92

Average Lap and Stability

Name Average Lap Stability
Sort: Time Veloc. [km/h] Laps Difference [s]
First lap isn't considered for std. deviation.
[SR]BlackBird 2:00.60 88.94 1 0.00
Stan 1:31.40 117.35 12 12.60
[¿] Sarge 91 1:01.15 175.42 140 19.76
[TC]›Zoomy‹ 1:01.16 175.36 140 19.86
W•マメŽPMD 1:01.13 175.46 140 19.91
-MarK'- 1:04.57 166.13 133 20.06
yfb.Zz0 1:03.87 167.94 134 20.14
Cimanu 1:03.07 170.07 136 20.16
CoRe.DWB 1:01.13 175.46 140 20.30
[GWR]J Myster 1:18.78 136.15 25 20.33
°ァ。MistaTea 1:01.76 173.67 108 20.41
[¿] Falcon 27 1:21.21 132.08 17 20.60
ァ。K.O'Keefe 1:02.10 172.73 130 20.67
Niko 1:02.63 171.25 137 20.78
[SR]Andrei221 1:09.93 153.38 38 20.84
LazLoW82 1:04.58 166.08 89 20.87
CoRe.BigTime 1:01.13 175.46 140 20.90
Keisu R. #0086 1:16.95 139.39 26 21.59
Konata-san 1:03.46 169.03 135 21.65
36 Starblue 1:03.53 168.84 135 22.35
D. Tarlau 1:06.80 160.57 79 22.55
W•マメ®Ice 1:24.23 127.34 22 22.76
[D1GP] ShanK 1:06.35 161.65 60 23.10
Touge¬M Akina 1:19.69 134.59 39 24.98
Quint 1:15.83 141.45 51 27.78
© [SR] Mutt 1:18.75 136.21 18 31.10
[HR]NightFly 1:13.86 145.21 69 44.08
[SR]LizardFolk 1:25.85 124.95 100 1:32.68

Sector Times

Name Best Sector 1 Best Sector 2 Best Possibe Lap Best Lap
Sort: Time Gap [s] Lap Time Gap [s] Lap Time Gap [s] Time Gap [s] Lap
Combined Best Lap: 47.93
CoRe.BigTime 16.70 0.02 139 31.25 --- 123 47.95 0.11 48.06 --- 135
CoRe.DWB 16.74 0.06 124 31.33 0.08 119 48.07 0.03 48.10 0.04 123
W•マメŽPMD 16.68 --- 139 31.29 0.04 135 47.97 0.13 48.10 0.04 135
[¿] Sarge 91 16.81 0.13 76 31.28 0.03 71 48.09 0.06 48.15 0.09 71
°ァ。MistaTea 16.84 0.16 100 31.40 0.15 15 48.24 0.02 48.26 0.20 101
ァ。K.O'Keefe 16.76 0.08 26 31.40 0.15 47 48.16 0.14 48.30 0.24 47
[TC]›Zoomy‹ 16.79 0.11 136 31.41 0.16 74 48.20 0.18 48.38 0.32 124
W•マメ®Ice 16.92 0.24 13 31.51 0.26 13 48.43 --- 48.43 0.37 13
36 Starblue 16.96 0.28 120 31.47 0.22 96 48.43 0.02 48.45 0.39 96
[D1GP] ShanK 16.95 0.27 39 31.60 0.35 42 48.55 0.05 48.60 0.54 39
LazLoW82 16.97 0.29 76 31.57 0.32 72 48.54 0.07 48.61 0.55 72
Niko 16.93 0.25 118 31.64 0.39 34 48.57 0.07 48.64 0.58 34
[HR]NightFly 16.97 0.29 43 31.69 0.44 47 48.66 0.01 48.67 0.61 47
© [SR] Mutt 17.03 0.35 16 31.77 0.52 14 48.80 0.03 48.83 0.77 14
Konata-san 17.05 0.37 15 31.81 0.56 119 48.86 0.06 48.92 0.86 119
D. Tarlau 17.01 0.33 33 31.82 0.57 49 48.83 0.09 48.92 0.86 49
-MarK'- 17.03 0.35 118 31.90 0.65 28 48.93 0.11 49.04 0.98 118
Cimanu 17.05 0.37 90 31.96 0.71 74 49.01 0.08 49.09 1.03 74
[SR]Andrei221 17.15 0.47 17 31.97 0.72 16 49.12 0.03 49.15 1.09 17
[SR]LizardFolk 17.16 0.48 63 31.91 0.66 61 49.07 0.10 49.17 1.11 63
Keisu R. #0086 17.08 0.40 26 31.97 0.72 15 49.05 0.13 49.18 1.12 15
yfb.Zz0 17.12 0.44 18 31.96 0.71 15 49.08 0.12 49.20 1.14 15
[¿] Falcon 27 17.20 0.52 12 32.10 0.85 13 49.30 0.06 49.36 1.30 13
Quint 17.11 0.43 35 32.31 1.06 35 49.42 --- 49.42 1.36 35
[GWR]J Myster 17.86 1.18 12 33.19 1.94 13 51.05 0.11 51.16 3.10 16
Touge¬M Akina 17.54 0.86 15 33.37 2.12 14 50.91 0.48 51.39 3.33 15
Stan 19.17 2.49 12 37.50 6.25 11 56.67 3.08 59.75 11.69 11
[SR]BlackBird 61.62 44.94 1 58.98 27.73 1 2:00.60 --- 2:00.60 72.54 1

Flags

Name Yellows Caused Blues Seen
28 cars caused 2692 yellow and 16 cars got 746 blue flags.
CoRe.DWB 114 0
W•マメŽPMD 118 0
CoRe.BigTime 127 0
[¿] Sarge 91 117 42
[TC]›Zoomy‹ 134 0
Niko 142 52
Cimanu 129 65
Konata-san 126 50
36 Starblue 128 90
yfb.Zz0 141 96
-MarK'- 138 69
ァ。K.O'Keefe 141 0
°ァ。MistaTea 98 0
[SR]LizardFolk 105 82
LazLoW82 100 0
D. Tarlau 114 41
[HR]NightFly 137 61
[D1GP] ShanK 76 0
Quint 71 31
Touge¬M Akina 76 37
[SR]Andrei221 69 5
Keisu R. #0086 62 0
[GWR]J Myster 52 0
W•マメ®Ice 47 17
© [SR] Mutt 40 2
[¿] Falcon 27 40 6
Stan 46 0
[SR]BlackBird 4 0

Penalties

Name Lap Description
7 cars got a total of 13 penalties.
[¿] Sarge 91 15 DT (Speeding)
17 DT Cleared
Konata-san 48 DT (Speeding)
52 DT Cleared
106 DT (Speeding)
111 DT Cleared
135 DT (Speeding)
[SR]LizardFolk 80 DT (Speeding)
DT (Admin)
82 DT Cleared
LazLoW82 85 DT (Speeding)
89 DT (Admin)
D. Tarlau 42 DT (Speeding)
79 DT (Speeding)
Quint 1 SG (False Start)
21 SG Cleared
22 DT (Speeding)
27 DT Cleared
Stan 13 DT (Speeding)

Lap by Lap Analysis

Lap CoRe.DWB W•マメŽPMD CoRe.BigTime [¿] Sarge 91 [TC]›Zoomy‹ Niko Cimanu Konata-san 36 Starblue yfb.Zz0 -MarK'- ァ。K.O'Keefe °ァ。MistaTea [SR]LizardFolk LazLoW82 D. Tarlau [HR]NightFly [D1GP] ShanK Quint Touge¬M Akina [SR]Andrei221 Keisu R. #0086 [GWR]J Myster W•マメ®Ice © [SR] Mutt [¿] Falcon 27 Stan [SR]BlackBird Stefan Alfons 99
Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph
Total 2h 22:38.34 2h 22:38.40 2h 22:38.51 2h 22:40.38 2h 22:43.01 2h 23:00.71 2h 22:57.44 2h 22:46.51 2h 22:56.26 2h 22:38.20 2h 23:07.19 2h 14:32.42 1h 51:10.17 2h 23:04.60 1h 35:48.04 1h 27:57.36 1h 24:56.66 1h 06:21.10 1h 04:27.34 51:48.07 44:17.40 33:20.70 32:49.53 30:53.04 23:37.43 23:00.60 18:16.79 2:00.60 0.00
+ 0.06 + 0.17 + 2.04 + 4.67 + 3 Laps + 4 Laps + 5 Laps + 5 Laps + 6 Laps + 7 Laps + 10 Laps + 32 Laps + 40 Laps + 51 Laps + 61 Laps + 71 Laps + 80 Laps + 89 Laps + 101 Laps + 102 Laps + 114 Laps + 115 Laps + 118 Laps + 122 Laps + 123 Laps + 128 Laps + 139 Laps + 140 Laps
100%: 48.06 101%: 48.54 103%: 49.50 105%: 50.46 107%: 51.42 >107%: >51.42 Pitstop Takeover Penalty Lap Rejoin
1 1:50.13 1:49.49 1:49.71 1:51.08 1:53.68 1:56.06 1:56.34 1:54.22 1:51.56 1:56.88 1:58.56 1:54.57 1:50.70 2:01.87 1:55.17 2:02.66 1:55.71 1:52.27 1:59.42 1:56.36 1:52.76 2:00.95 1:59.72 1:49.08 1:52.51 1:51.88 1:59.94 2:00.60  
2 1:35.02 1:34.44 1:34.63 1:35.10 1:34.86 1:35.79 1:35.34 1:35.08 1:35.27 1:40.94 1:34.99 1:34.98 1:34.98 1:35.34 1:35.10 1:37.46 1:35.20 1:35.16 1:35.79 1:35.87 1:35.29 1:37.16 1:34.65 1:34.60 1:35.27 1:35.18 1:39.22    
3 1:34.29 1:34.56 1:34.48 1:34.34 1:34.47 1:32.86 1:32.51 1:33.95 1:34.26 1:33.07 1:34.10 1:33.87 1:34.42 1:33.39 1:33.44 1:31.22 1:33.54 1:34.35 1:34.46 1:33.36 1:34.11 1:34.07 1:34.82 1:34.42 1:34.23 1:34.30 1:30.92    
4 1:34.43 1:34.58 1:34.67 1:34.15 1:35.32 1:36.19 1:35.97 1:35.36 1:34.62 1:30.54 1:37.21 1:35.47 1:34.28 1:51.28 1:35.85 1:35.89 1:35.99 1:34.57 1:37.08 1:36.85 1:34.85 1:35.40 1:37.04 1:34.63 1:34.75 1:34.49 1:45.58    
5 1:34.85 1:34.83 1:34.79 1:35.61 1:34.77 1:34.93 1:35.08 1:34.84 1:35.13 1:34.78 1:33.42 1:35.29 1:34.94 1:22.30 1:35.16 1:30.19 1:35.10 1:34.92 1:32.19 1:34.35 1:34.74 1:30.67 1:32.88 1:34.86 1:34.77 1:35.20 1:31.99    
6 1:34.31 1:34.15 1:34.33 1:33.64 1:32.85 1:31.81 1:32.00 1:33.09 1:33.59 1:31.95 1:31.93 1:32.58 1:34.07 1:28.67 1:32.21 1:31.55 1:31.94 1:33.55 1:33.63 1:31.87 1:33.70 1:32.27 1:32.05 1:34.22 1:33.67 1:33.59 1:25.80    
7 1:34.67 1:35.17 1:34.99 1:34.39 1:33.18 1:32.86 1:33.12 1:32.93 1:34.36 1:33.03 1:33.21 1:32.91 1:34.59 1:32.27 1:33.15 2:22.09 1:33.15 1:33.42 1:32.73 1:34.28 1:33.17 1:33.20 1:32.51 1:35.40 1:33.73 1:33.89 1:32.24    
8 1:34.63 1:34.69 1:34.75 1:34.74 1:34.78 1:34.49 1:34.55 1:34.57 1:34.72 1:34.52 1:32.61 1:34.65 1:34.52 1:32.23 1:34.62 1:02.23 1:34.72 1:34.66 1:32.39 1:32.70 1:34.50 1:32.88 1:32.78 1:34.70 1:34.67 1:34.75 1:32.04    
9 1:34.95 1:34.91 1:34.57 1:34.97 1:35.71 1:35.15 1:35.31 1:38.40 1:35.21 1:35.70 1:35.86 1:35.52 1:35.05 1:34.50 1:34.49 1:20.61 1:35.48 1:35.15 1:37.78 1:37.29 1:35.18 1:35.62 1:38.33 1:34.71 2:44.17 1:35.03 1:36.83    
10 1:28.89 1:29.51 1:29.50 1:28.72 1:27.63 1:27.36 1:27.69 1:27.10 1:28.35 1:26.79 1:26.89 1:27.33 1:28.83 1:26.17 1:28.74 1:25.87 1:27.48 1:28.56 1:25.12 1:26.32 1:28.23 1:26.73 1:24.60 1:29.43 59.96 1:28.76 1:26.45    
11 50.33 50.67 50.68 51.91 51.92 51.45 52.15 54.08 52.60 54.05 52.69 51.92 50.98 52.67 53.54 54.87 55.03 1:05.85 54.67 1:10.36 51.69 52.96 53.32 50.24 49.58 51.78 59.75    
12 50.54 48.85 48.69 49.92 52.48 51.50 50.02 49.63 49.38 50.50 51.36 52.10 49.00 50.29 50.03 49.61 50.10 49.20 49.86 57.56 50.79 50.42 51.25 48.60 49.21 49.68 1:16.03    
13 48.85 48.63 48.52 49.23 49.29 49.21 49.50 49.95 49.18 50.73 57.47 49.01 48.62 50.09 49.71 51.81 49.92 49.27 51.38 53.42 49.62 49.46 51.24 48.43 49.50 49.36 Retired    
14 49.69 48.45 49.63 48.93 49.63 48.84 49.77 49.50 49.13 49.88 51.98 48.50 48.84 1:02.86 49.47 49.93 49.18 48.92 50.74 51.75 49.34 49.45 51.20 52.19 48.83 49.51      
15 48.80 48.57 48.65 1:34.03 49.40 49.47 49.64 49.03 49.01 49.20 50.07 48.61 48.49 7:21.01 49.52 49.33 49.19 49.01 51.44 51.39 49.27 49.18 51.17 1:34.98 48.92 1:38.27      
16 48.67 48.42 48.54 1:24.93 48.75 48.93 49.47 49.44 48.79 49.28 50.12 48.75 49.02 2:05.27 48.83 49.84 54.86 49.39 53.10 55.96 49.22 49.30 51.16 59.51 48.87 1:00.30      
17 48.56 49.68 48.96 59.82 48.74 48.94 49.50 49.37 48.76 50.87 51.52 49.76 48.92 1:12.84 49.22 49.48 49.74 49.30 55.83 1:10.59 49.15 49.37 51.48 1:10.03 1:14.79 1:04.63      
18 1:15.44 1:16.36 1:16.13 1:24.97 1:10.80 1:12.23 1:10.60 1:08.94 1:13.35 1:07.72 59.04 1:11.93 1:16.34 50.48 1:10.65 1:06.36 1:04.78 1:04.06 56.39 55.30 1:11.87 1:10.12 1:02.21 2:18.72 50.00        
19 1:34.95 1:34.87 1:34.84 1:32.94 1:36.04 1:35.39 1:36.32 1:36.58 1:35.34 1:36.15 1:36.15 1:35.38 1:34.87 50.00 1:36.68 1:35.71 1:36.24 1:36.41 1:36.95 56.73 1:35.31 1:36.71 1:36.16 58.95          
20 1:34.56 1:34.55 1:34.63 1:33.11 1:34.11 1:34.73 1:33.83 1:33.65 1:34.70 1:33.43 1:33.45 1:34.64 1:34.53 49.44 1:33.47 1:33.68 1:33.36 1:33.06 1:33.11 1:32.43 1:34.75 1:33.33 1:33.03 1:29.09          
21 1:35.11 1:35.01 1:35.17 1:34.65 1:34.74 1:34.63 1:34.75 1:34.50 1:34.84 1:34.40 1:33.28 1:34.71 1:35.20 49.33 1:34.65 1:34.41 1:34.59 2:34.15 2:06.80 1:31.45 1:34.79 1:34.64 1:33.92 1:34.85          
22 1:34.56 1:34.88 1:34.72 1:31.25 1:35.07 1:34.78 1:35.39 1:35.37 1:34.53 1:35.64 1:35.65 1:34.77 1:34.61 49.34 1:35.50 1:35.70 1:35.44 1:01.80 1:03.44 1:35.13 1:34.53 1:35.58 1:35.49 1:31.40          
23 1:30.64 1:31.19 1:30.95 50.66 1:29.74 1:29.70 1:30.27 1:30.37 1:30.42 1:30.60 1:30.05 1:29.78 1:30.88 49.38 1:30.13 1:30.61 1:30.73 1:05.70 1:28.93 1:31.76 1:30.06 1:30.31 1:30.47            
24 51.32 51.61 51.05 48.95 51.21 52.00 51.14 51.25 51.93 51.95 52.19 51.75 51.45 50.57 51.21 51.35 53.79 50.56 53.44 1:07.98 51.56 51.90 52.38            
25 49.43 48.83 48.73 49.25 49.58 49.01 49.91 49.43 49.41 51.09 50.47 49.04 48.99 49.97 49.17 49.50 50.48 48.86 57.15 51.47 49.48 49.34 1:05.67            
26 48.73 48.51 48.62 50.42 49.06 50.03 50.55 49.43 48.74 50.26 49.57 48.44 48.35 51.45 50.42 51.55 49.73 51.44 1:39.62 52.07 49.29 49.68              
27 49.34 48.43 48.53 48.96 50.17 49.80 50.71 49.73 2:30.56 50.96 50.73 48.51 48.89 50.31 50.53 1:02.07 50.15 54.06 1:08.30 52.65 1:20.41                
28 48.61 48.22 48.52 49.13 48.90 49.29 50.89 49.67 1:01.86 50.17 49.09 48.52 48.60 49.55 49.63 50.12 50.44 50.43 2:44.23 1:12.83 51.76                
29 48.87 48.72 48.68 49.12 49.23 49.28 50.44 49.18 48.92 50.04 49.25 54.20 48.50 49.63 49.64 49.38 50.97 49.48 1:04.13 2:24.41 49.87                
30 48.80 48.35 48.51 48.75 49.11 49.15 2:14.86 50.19 48.61 50.12 50.66 51.66 48.50 49.57 49.37 49.07 50.90 49.02 49.72 1:14.36 50.55                
31 48.51 48.62 48.51 49.10 49.06 49.68 1:00.86 49.54 48.70 50.34 49.21 48.83 48.41 49.58 49.08 49.31 2:18.40 49.30 50.94 1:01.45 51.20                
32 48.53 48.29 48.79 49.78 49.12 49.58 49.75 49.36 48.72 50.24 49.49 48.80 48.45 50.12 49.12 49.17 1:02.32 49.46 49.84 1:08.29 51.56                
33 48.52 48.43 49.30 49.14 49.36 48.96 49.44 49.08 48.75 50.02 50.26 49.21 48.68 49.81 48.95 49.12 48.85 48.90 50.42 1:05.78 50.72                
34 48.46 48.39 49.04 49.12 49.32 48.64 49.56 49.17 48.92 49.99 51.10 48.97 48.65 50.15 49.28 48.95 49.05 49.18 49.76 1:05.76 51.80                
35 48.55 48.44 48.93 48.90 48.97 48.68 50.39 49.43 56.37 49.95 51.83 48.71 48.64 50.90 49.41 49.10 55.22 49.16 49.42 2:23.88 51.23                
36 48.58 48.54 48.86 48.93 49.30 48.87 49.54 49.05 48.95 50.27 1:53.13 48.75 49.30 50.62 49.32 49.51 49.79 49.21 50.43 2:19.78 1:06.80                
37 48.53 48.62 48.81 48.86 49.81 49.52 49.31 49.33 49.46 53.20 1:02.91 55.94 48.80 50.18 49.49 49.37 49.67 49.05 50.45 1:06.83 51.94                
38 48.50 48.58 48.67 48.71 48.82 49.23 49.52 49.60 49.05 50.24 50.27 49.76 48.73 50.80 49.52 50.18 51.20 48.89 50.44 1:04.39 52.31                
39 48.52 48.53 49.12 49.01 48.78 49.10 49.59 49.54 48.72 50.14 49.73 49.11 48.60 50.77 49.54 51.05 50.48 48.60 50.29 1:03.06                  
40 48.65 48.36 49.09 48.92 48.87 49.02 49.61 49.65 48.76 50.37 49.08 50.94 48.67 51.74 49.49 51.38 49.67 49.08 51.39 Retired                  
41 48.53 48.48 49.07 48.80 49.43 48.78 49.48 49.58 48.69 51.20 49.81 49.49 48.69 1:54.53 49.36 52.69 49.76 49.02 54.93                    
42 48.33 48.43 48.87 48.67 49.05 49.24 49.95 49.53 48.75 51.28 49.59 48.68 49.02 1:01.17 49.33 2:13.13 48.88 48.60 1:43.73                    
43 48.44 48.49 48.94 48.71 49.10 49.08 49.42 49.64 48.64 51.64 50.86 48.65 48.79 49.44 49.00 1:03.04 49.03 48.60 1:16.12                    
44 48.45 48.62 48.92 48.87 49.06 49.00 49.45 50.31 48.97 2:17.65 51.62 48.60 48.79 1:02.98 48.95 49.26 49.51 49.01 1:16.81                    
45 48.44 48.56 48.88 48.69 48.79 49.31 49.64 49.48 48.63 1:02.80 50.50 48.65 49.12 51.58 48.95 49.19 48.79 48.79 2:41.95                    
46 48.55 48.84 49.00 48.99 49.26 49.15 49.37 49.45 48.65 52.25 50.53 48.74 49.47 2:14.99 49.47 49.53 48.82 48.94 1:06.38                    
47 48.55 48.51 48.87 49.44 49.01 49.53 49.59 49.57 48.72 52.18 50.67 48.30 49.21 1:01.73 49.11 49.25 48.67 48.74 50.66                    
48 48.51 48.43 48.99 49.13 49.25 49.19 49.22 2:08.00 48.65 50.40 52.54 49.02 49.19 1:21.60 49.55 49.46 49.61 48.64 1:21.29                    
49 48.46 48.35 48.91 49.07 49.03 48.95 49.48 1:00.47 49.78 1:17.57 51.64 48.76 49.09 1:34.62 49.60 48.92 49.79 48.87 1:34.69                    
50 48.46 48.43 48.77 49.13 48.79 49.24 1:07.95 1:09.61 56.16 1:34.93 1:00.32 48.67 49.14 1:35.12 49.53 52.82 50.32 48.82 1:35.04                    
51 49.77 51.59 49.18 52.67 48.96 49.09 1:24.12 1:41.17 1:34.20 1:34.83 1:33.86 49.38 49.29 1:36.97 49.30 1:25.45 1:27.71 49.20 1:32.54                    
52 1:23.79 1:24.52 1:19.30 49.17 1:10.92 1:09.84 1:35.97 1:31.40 1:35.84 1:35.03 1:35.42 1:02.36 1:19.48 1:07.10 1:01.82 1:36.02 1:36.00 1:02.41                      
53 1:34.58 1:34.54 2:45.87 1:03.20 1:34.31 1:33.54 1:34.17 1:33.58 1:34.12 1:34.54 1:34.53 1:33.73 1:34.30 2:20.05 1:34.53 1:33.94 1:34.13 1:33.77                      
54 1:34.49 1:34.53 1:00.80 1:34.52 1:34.84 1:35.04 1:34.13 1:34.55 1:34.67 1:36.35 1:24.84 1:34.69 1:34.56 1:37.33 1:34.63 1:34.78 1:34.81 1:34.43                      
55 1:34.76 1:34.80 1:02.87 1:34.80 1:34.71 1:34.75 1:36.13 1:35.40 1:35.48 1:31.91 53.29 1:34.74 1:34.66 1:35.68 1:34.84 1:35.15 1:35.19 1:34.74                      
56 1:34.75 1:34.74 1:34.70 1:34.57 1:34.82 1:34.94 1:33.59 1:33.83 1:33.70 54.90 56.62 1:34.90 1:34.71 1:33.25 1:34.77 1:33.64 1:33.85 1:34.69                      
57 1:34.93 1:34.98 1:35.26 1:36.27 1:36.07 1:36.52 53.93 55.16 54.61 1:04.35 1:30.69 1:36.08 1:35.05 1:32.34 1:36.42 54.01 1:11.25 1:35.42                      
58 1:32.35 1:32.70 1:31.60 1:31.42 1:30.45 1:31.10 1:06.61 1:05.36 1:04.70 1:34.51 53.24 1:30.71 1:32.11 1:56.26 1:30.51 1:03.50 53.84 1:31.70                      
59 51.30 51.93 51.66 51.45 51.34 51.23 1:31.96 1:31.88 1:33.59 1:34.09 1:02.32 51.56 51.59 1:16.12 52.39 1:34.59 1:28.52 51.42                      
60 1:07.82 1:07.95 1:04.01 1:06.54 1:07.81 1:07.25 1:34.62 2:21.43 1:34.52 1:36.27 1:34.30 1:13.26 1:07.63 49.93 1:06.44 1:34.58 1:34.03 1:07.88                      
61 1:34.48 1:34.51 1:34.65 1:34.50 1:34.45 1:34.45 1:36.26 1:02.33 1:36.40 1:33.65 1:34.51 1:33.64 1:34.54 49.36 1:34.66 1:36.30 1:36.23                        
62 2:21.71 1:34.25 1:34.33 1:34.58 1:34.37 1:34.38 1:33.23 1:22.47 1:33.31 1:32.17 1:35.64 2:24.09 1:34.30 49.30 1:35.39 1:33.19 1:33.24                        
63 1:00.37 1:34.60 1:35.73 1:34.84 1:34.48 1:34.68 1:32.78 1:30.64 1:32.45 57.55 1:14.06 59.79 1:34.82 49.17 1:34.70 1:32.62 1:32.57                        
64 1:28.85 1:35.67 1:34.34 1:35.37 1:35.66 1:35.48 52.56 1:06.80 52.28 51.40 50.81 1:22.71 1:35.47 49.32 1:35.53 52.46 55.13                        
65 1:31.28 1:32.63 1:32.06 1:32.35 1:32.60 1:32.73 50.37 50.60 51.37 50.45 1:05.00 1:30.27 1:32.68 49.70 1:32.59 49.92 49.87                        
66 51.68 51.46 52.37 51.59 51.16 2:36.89 50.38 49.31 49.05 50.16 53.11 51.79 51.07 50.59 52.85 50.32 49.00                        
67 49.55 49.44 48.97 49.28 48.91 1:00.67 49.89 49.37 49.82 50.41 49.63 49.43 48.71 49.99 50.48 49.94 50.50                        
68 48.76 48.96 48.82 48.93 48.92 49.50 49.63 49.11 52.16 50.41 49.16 50.23 48.99 52.83 49.62 49.34 52.64                        
69 48.54 48.45 48.54 48.78 49.99 49.70 49.44 49.10 48.75 50.44 49.50 49.84 48.67 50.79 48.92 49.84 6:22.39                        
70 48.92 48.35 48.38 48.55 49.39 49.49 49.54 49.01 48.60 50.49 49.27 48.93 48.60 50.78 49.12 49.51 Retired                        
71 48.68 48.35 48.16 48.15 48.70 49.16 49.39 49.08 50.28 49.96 51.20 48.84 48.37 50.42 49.45 49.45                          
72 48.54 48.32 48.54 48.54 48.67 49.24 49.85 49.26 50.05 49.83 49.93 48.80 48.45 50.19 48.61 49.67                          
73 48.51 48.35 48.25 48.26 49.11 49.51 49.47 49.12 49.28 50.36 51.83 48.65 48.60 50.87 48.82 49.59                          
74 48.64 48.35 48.52 48.40 48.58 49.78 49.09 49.21 49.07 50.43 51.48 48.75 48.53 50.99 48.76 49.48                          
75 48.64 48.20 48.45 48.43 48.58 49.52 49.57 49.54 49.24 50.98 51.10 48.66 48.37 52.14 48.85 49.78                          
76 48.68 48.22 48.46 48.47 48.69 49.85 49.34 49.56 49.17 50.08 50.00 48.65 48.37 52.83 48.71 49.52                          
77 48.62 48.41 48.74 48.72 48.85 49.42 49.27 49.54 49.08 49.96 50.43 48.88 48.62 53.31 49.42 49.69                          
78 48.56 48.23 48.43 48.45 49.04 50.78 49.37 49.61 49.31 53.22 50.42 49.08 49.02 55.56 50.68 49.81                          
79 48.64 48.27 48.94 49.12 49.07 49.93 49.49 49.27 49.25 50.31 50.71 48.94 48.65 2:35.27 51.41 1:12.69                          
80 48.65 48.26 48.54 48.50 48.60 49.61 49.41 49.26 49.49 50.21 50.70 48.80 48.47 1:28.24 50.54                            
81 48.64 48.24 48.28 48.28 48.84 49.21 49.22 49.12 49.55 50.20 49.97 48.89 48.46 2:06.25 52.09                            
82 48.54 48.33 48.64 48.56 50.11 49.78 49.33 49.34 49.30 50.17 49.93 48.66 48.51 2:56.15 52.10                            
83 48.65 48.45 48.77 48.85 49.86 49.82 49.39 49.18 49.17 50.67 49.25 48.50 48.39 1:05.87 52.33                            
84 48.51 48.35 48.35 48.34 49.08 49.97 49.36 49.40 49.30 52.10 49.86 48.59 48.40 1:05.96 52.03                            
85 48.49 48.25 48.32 48.91 50.17 49.19 49.73 49.30 49.53 50.48 54.88 48.64 48.60 1:53.59 2:03.64                            
86 48.53 48.35 48.76 49.53 49.16 49.39 49.56 49.22 49.57 50.80 51.46 48.47 48.92 13:38.84 1:01.75                            
87 48.51 48.34 48.66 48.90 48.91 49.41 49.28 49.12 49.66 50.84 1:51.17 48.49 48.95 3:29.23 50.79                            
88 48.54 48.31 48.59 49.11 49.72 49.38 49.31 49.40 2:13.28 49.90 1:04.86 49.23 48.59 5:44.38 50.74                            
89 48.52 48.31 48.63 49.11 49.13 49.37 49.24 49.03 1:01.44 49.96 51.21 48.92 48.62 1:44.19 52.46                            
90 48.55 48.62 48.54 49.19 48.81 49.55 49.10 49.03 50.03 50.39 51.63 48.89 48.48 1:37.76                              
91 48.50 48.30 48.72 49.35 49.18 49.21 49.26 49.19 49.19 50.18 55.03 49.11 48.38 1:31.23                              
92 48.53 48.30 48.63 49.17 48.96 49.24 49.31 49.04 48.67 50.46 50.80 49.14 48.37 1:01.66                              
93 48.56 48.45 48.85 48.64 49.95 49.06 49.21 48.98 48.63 49.75 51.04 48.65 48.45 55.03                              
94 48.60 48.40 48.54 48.84 48.99 49.18 49.20 49.06 48.71 50.24 52.05 48.44 48.78 59.20                              
95 48.48 48.37 48.68 48.77 49.53 49.24 49.32 49.02 48.62 49.97 57.47 48.79 48.71 1:04.66                              
96 48.52 48.27 48.93 49.01 49.19 49.18 49.26 49.00 48.45 50.63 1:57.81 48.76 48.43 52.75                              
97 48.47 48.33 48.65 48.96 49.41 49.91 1:44.73 49.08 48.55 50.26 1:05.12 48.71 48.36 51.45                              
98 48.75 48.59 50.06 48.92 50.00 49.84 1:02.07 49.41 48.80 49.87 50.72 49.13 48.94 54.72                              
99 48.55 48.42 49.04 49.29 49.47 49.13 49.90 49.04 49.23 50.00 50.08 48.79 48.60 54.81                              
100 48.44 48.21 48.66 48.74 49.80 49.25 49.66 49.20 58.56 50.29 52.38 48.76 48.28 55.69                              
101 48.53 48.16 48.74 48.73 49.30 49.23 49.77 49.19 1:26.22 50.85 1:17.03 48.77 48.26                                
102 48.48 48.14 48.69 48.93 48.92 50.27 1:13.08 53.23 2:28.38 56.92 1:34.16 48.50 48.51                                
103 48.38 48.17 48.60 48.78 48.85 1:15.04 1:34.40 1:17.36 1:01.52 1:29.31 1:34.28 48.64 48.50                                
104 48.47 48.19 48.59 48.83 49.14 1:34.13 1:33.87 1:35.01 1:18.62 1:33.77 1:34.51 1:05.33 49.28                                
105 48.53 48.52 48.90 49.27 49.29 1:34.22 1:35.44 1:16.53 1:37.72 1:35.43 1:32.39 52.11 48.62                                
106 1:14.84 1:50.93 1:14.64 2:09.65 1:02.14 1:34.54 1:32.23 1:33.67 55.03 1:32.45 51.97 53.15 2:06.41                                
107 1:34.29 1:14.41 1:34.45 1:00.25 2:27.30 1:32.56 52.14 1:00.99 49.00 52.33 49.77 1:45.30 1:02.05                                
108 1:34.24 1:33.56 1:34.21 1:11.50 1:01.52 51.72 50.47 51.33 48.95 50.18 50.46 1:17.41 1:23.24                                
109 1:34.72 1:35.13 1:34.78 1:34.85 1:12.52 49.23 49.82 51.47 1:19.25 50.27 1:26.37 1:35.00                                  
110 1:32.36 1:31.97 1:32.63 1:39.80 1:35.38 49.60 1:26.45 1:10.09 1:32.86 1:25.85 1:33.03 1:37.50                                  
111 51.01 50.67 51.10 55.46 56.12 1:27.64 1:32.67 1:00.51 52.47 1:32.75 51.34 56.79                                  
112 48.63 48.67 48.69 50.90 50.49 1:33.19 52.18 59.86 1:01.83 53.69 1:05.94 1:08.28                                  
113 48.62 48.49 48.41 50.31 49.37 51.92 50.62 1:32.52 48.85 50.29 49.86 51.76                                  
114 1:29.58 1:27.99 1:29.38 1:43.45 1:18.06 50.25 49.59 51.91 49.38 49.91 49.32 2:04.82                                  
115 1:33.75 1:33.45 1:33.78 1:04.04 1:32.51 49.14 49.64 49.81 48.94 50.12 49.58 59.76                                  
116 50.94 50.94 50.99 51.19 51.72 49.17 49.50 49.21 48.69 50.12 49.44 48.79                                  
117 48.55 48.68 48.74 49.26 50.15 48.86 49.54 48.95 48.61 50.15 49.29 48.54                                  
118 48.47 48.32 48.19 48.59 48.90 48.85 49.43 49.16 48.94 50.09 49.04 48.79                                  
119 48.17 48.18 48.42 48.76 48.58 49.16 49.43 48.92 48.79 50.06 49.31 49.00                                  
120 48.51 48.58 48.61 48.54 48.99 49.30 49.73 49.05 49.49 49.93 49.78 48.58                                  
121 48.35 48.47 48.52 48.56 48.64 49.12 49.82 49.28 49.75 50.51 54.55 48.70                                  
122 48.20 48.12 48.13 48.71 49.19 48.94 49.70 49.36 52.10 59.71 50.89 48.51                                  
123 48.10 48.37 48.09 48.60 48.61 50.21 59.13 49.93 1:29.98 53.48 1:22.07 48.51                                  
124 48.14 48.18 48.14 48.57 48.38 1:00.81 1:29.86 50.07 1:35.03 1:21.54 1:34.95 48.59                                  
125 48.16 48.23 48.27 48.95 48.57 1:32.94 1:34.74 58.86 1:32.38 1:35.61 1:32.02 48.47                                  
126 48.37 48.39 48.41 48.69 48.71 1:34.63 1:32.70 1:31.68 54.24 1:32.06 56.75 48.51                                  
127 1:07.85 1:09.05 1:08.91 1:02.29 1:02.47 1:33.44 53.49 1:35.02 52.50 52.58 56.47 48.72                                  
128 1:35.07 1:33.88 1:34.06 1:33.95 1:33.29 55.80 51.72 1:32.98 49.32 1:55.05 2:09.16 1:20.29                                  
129 1:34.55 1:34.47 1:34.56 1:34.38 1:33.70 50.65 49.97 55.63 49.42 1:01.78 1:05.62 1:30.48                                  
130 1:33.88 1:33.63 1:33.69 1:33.74 1:33.60 49.80 49.81 53.35 51.68 50.50 49.86 1:33.35                                  
131 50.77 50.86 50.74 51.67 51.52 50.12 49.90 54.82 49.11 51.16 55.09                                    
132 48.61 48.46 48.61 48.91 48.92 52.61 49.63 56.55 48.90 51.09 49.90                                    
133 48.62 48.57 48.63 48.69 48.88 49.36 49.80 56.20 48.81 50.20 50.01                                    
134 48.43 48.45 48.44 48.31 48.85 49.48 49.52 59.49 49.34 50.15                                      
135 48.16 48.10 48.06 48.46 48.74 49.42 50.06 2:37.19 48.91                                        
136 48.52 48.55 48.60 48.50 48.42 50.65 49.85                                            
137 48.41 48.48 48.43 48.38 48.65 49.72                                              
138 48.35 48.44 48.63 48.44 48.98                                                
139 48.56 48.27 48.28 48.59 48.95                                                
140 48.41 48.46 48.49 48.37 48.97                                                

Lap by Lap Chart (click to enlarge)

Race Progress Chart (click to enlarge)