mpRes » Single Event » Kyoto 250 » 6 » Race 2de | en

Kyoto 250 Season 6 - Race 2 (replay) download
Version LfS 0.6E XRT RB4 FZ5 KY1
Time 24.03.2013, 19:57:30
Distance 62 Laps (184.73 km)
Daytime Morning
Weather Cloudy
Wind No Wind
Statistics Tables

Race Result

Pos. (Start) Name Car Laps Total Time Gap [s] Stops Open Penalties Best Lap Leading Laps LH AU SH BH AC CV ST
19 of 19 cars finished the race.
1 (+3) 42 O.Hardwick XRT 62 55:13.04 1 - 47.54 55 (8-62) X X X W
2 (+1) 64 M.Kapal XRT 62 + 0.04 1 - 47.54 0 X X W
3 (-2) 32 P.Hall XRT 62 + 8.60 + 8.56 1 - 47.56 5 (1-3, 6-7) X X X M
4 (+4) 143 S.Sheppard XRT 62 + 9.24 + 0.64 1 - 47.56 0 X W
5 (±0) 14 R.Majoor XRT 62 + 9.46 + 0.22 1 - 47.61 0 X X W
6 (+4) 25 R.Kingsbury XRT 62 + 10.13 + 0.67 1 - 47.60 0 X X X W
7 (+2) 6 R.Blauwhoff XRT 62 + 10.24 + 0.11 1 - 47.61 0 X X X W
8 (-6) 19 P.Wdowiarz XRT 62 + 14.95 + 4.71 1 - 47.80 0 X X X M
9 (+3) 21 M.Kingsbury XRT 62 + 19.13 + 4.18 1 - 47.71 0 X X X W
10 (-4) 86 W.Fernandes XRT 62 + 20.69 + 1.56 1 - 48.00 0 X X W
11 (+4) 28 Z.Cagaš XRT 62 + 22.25 + 1.56 1 - 48.08 0 X X W
12 (+4) 44 B.Goga XRT 62 + 22.83 + 0.58 1 - 47.93 0 X X X M
13 (+1) 510 E.Harmon XRT 62 + 38.39 + 15.56 1 - 48.14 0 X X W
14 (-1) 05 C.Corns XRT 62 + 41.24 + 2.85 1 - 48.13 2 (4-5) X X X W
15 (+2) 55 T.Falkenberg XRT 62 + 45.91 + 4.67 1 - 48.14 0 X X W
16 (-5) 29 T.Stadius XRT 27 + 35 Laps + 35 Laps 1 - 48.40 0 X X W
17 (-10) 52 T.Korený XRT 8 + 54 Laps + 19 Laps 1 - 47.93 0 X X W
18 (+1) Jonathan Palmer RB4 1 + 61 Laps + 7 Laps 0 - 57:33.12 0 X X X M
19 (-1) Jonathon Provost RB4 1 + 61 Laps + 9.77 0 - 57:42.89 0 X X W

Pitstops

Name Lap Work Time [s] Total
17 cars made 17 pitstops with a total time of 3:46.85
19 P.Wdowiarz 4 10402_15_0 13.32 13.32
86 W.Fernandes 4 10402_15_0 13.32 13.32
05 C.Corns 5 10402_15_0 13.32 13.32
29 T.Stadius 4 10402_15_0 13.32 13.32
6 R.Blauwhoff 3 10402_15_0 13.32 13.32
21 M.Kingsbury 4 10402_15_0 13.32 13.32
25 R.Kingsbury 3 10402_15_0 13.32 13.32
55 T.Falkenberg 3 10402_15_0 13.33 13.33
143 S.Sheppard 4 10402_15_0 13.33 13.33
28 Z.Cagaš 3 10402_15_0 13.33 13.33
42 O.Hardwick 3 10402_15_0 13.33 13.33
14 R.Majoor 3 10402_15_0 13.34 13.34
32 P.Hall 4 10402_15_0 13.34 13.34
52 T.Korený 3 10402_15_0 13.35 13.35
64 M.Kapal 3 10402_15_0 13.35 13.35
44 B.Goga 3 10402_15_0 13.35 13.35
510 E.Harmon 4 10402_15_0 13.56 13.56

Average Lap and Stability

Name Average Lap Stability
Sort: Time Veloc. [km/h] Laps Difference [s]
First lap isn't considered for std. deviation.
Jonathan Palmer 57:33.12 3.11 1 0.00
Jonathon Provost 57:42.89 3.10 1 0.00
44 B.Goga 53.80 199.35 62 13.73
510 E.Harmon 54.06 198.43 62 13.76
55 T.Falkenberg 54.18 197.98 62 13.77
28 Z.Cagaš 53.80 199.39 62 14.01
05 C.Corns 54.10 198.26 62 14.03
25 R.Kingsbury 53.60 200.12 62 14.11
86 W.Fernandes 53.77 199.48 62 14.16
21 M.Kingsbury 53.74 199.57 62 14.21
143 S.Sheppard 53.59 200.17 62 14.34
6 R.Blauwhoff 53.60 200.11 62 14.35
19 P.Wdowiarz 53.68 199.83 62 14.37
32 P.Hall 53.57 200.21 62 14.40
14 R.Majoor 53.59 200.16 62 14.53
64 M.Kapal 53.44 200.72 62 14.64
42 O.Hardwick 53.44 200.73 62 14.66
29 T.Stadius 1:01.10 175.55 27 20.01
52 T.Korený 1:10.48 152.19 8 25.07

Sector Times

Name Best Sector 1 Best Sector 2 Best Possibe Lap Best Lap
Sort: Time Gap [s] Lap Time Gap [s] Lap Time Gap [s] Time Gap [s] Lap
Combined Best Lap: 47.52
42 O.Hardwick 16.52 --- 23 31.02 0.02 23 47.54 --- 47.54 --- 23
64 M.Kapal 16.52 --- 23 31.02 0.02 23 47.54 --- 47.54 --- 23
143 S.Sheppard 16.56 0.04 27 31.00 --- 27 47.56 --- 47.56 0.02 27
32 P.Hall 16.55 0.03 27 31.01 0.01 27 47.56 --- 47.56 0.02 27
25 R.Kingsbury 16.56 0.04 46 31.02 0.02 55 47.58 0.02 47.60 0.06 47
14 R.Majoor 16.57 0.05 9 31.02 0.02 25 47.59 0.02 47.61 0.07 25
6 R.Blauwhoff 16.53 0.01 46 31.03 0.03 25 47.56 0.05 47.61 0.07 25
21 M.Kingsbury 16.56 0.04 38 31.09 0.09 22 47.65 0.06 47.71 0.17 22
19 P.Wdowiarz 16.56 0.04 38 31.11 0.11 8 47.67 0.13 47.80 0.26 45
52 T.Korený 16.67 0.15 7 31.26 0.26 7 47.93 --- 47.93 0.39 7
44 B.Goga 16.63 0.11 61 31.26 0.26 56 47.89 0.04 47.93 0.39 61
86 W.Fernandes 16.69 0.17 54 31.28 0.28 22 47.97 0.03 48.00 0.46 54
28 Z.Cagaš 16.71 0.19 25 31.30 0.30 61 48.01 0.07 48.08 0.54 25
05 C.Corns 16.75 0.23 53 31.37 0.37 52 48.12 0.01 48.13 0.59 52
510 E.Harmon 16.76 0.24 11 31.37 0.37 35 48.13 0.01 48.14 0.60 11
55 T.Falkenberg 16.76 0.24 9 31.34 0.34 11 48.10 0.04 48.14 0.60 11
29 T.Stadius 16.85 0.33 24 31.47 0.47 9 48.32 0.08 48.40 0.86 9
Jonathan Palmer 3392.54 3376.02 1 60.58 29.58 1 57:33.12 --- 57:33.12 3405.58 1
Jonathon Provost 3392.12 3375.60 1 70.77 39.77 1 57:42.89 --- 57:42.89 3415.35 1

Flags

Name Yellows Caused Blues Seen
19 cars caused 316 yellow and 1 cars got 1 blue flags.
42 O.Hardwick 24 0
64 M.Kapal 15 0
32 P.Hall 16 0
143 S.Sheppard 18 0
14 R.Majoor 15 0
25 R.Kingsbury 16 0
6 R.Blauwhoff 24 0
19 P.Wdowiarz 17 0
21 M.Kingsbury 20 0
86 W.Fernandes 16 0
28 Z.Cagaš 17 0
44 B.Goga 20 0
510 E.Harmon 23 0
05 C.Corns 21 0
55 T.Falkenberg 17 1
29 T.Stadius 23 0
52 T.Korený 10 0
Jonathan Palmer 2 0
Jonathon Provost 2 0

Lap by Lap Analysis

Lap 42 O.Hardwick 64 M.Kapal 32 P.Hall 143 S.Sheppard 14 R.Majoor 25 R.Kingsbury 6 R.Blauwhoff 19 P.Wdowiarz 21 M.Kingsbury 86 W.Fernandes 28 Z.Cagaš 44 B.Goga 510 E.Harmon 05 C.Corns 55 T.Falkenberg 29 T.Stadius 52 T.Korený Jonathan Palmer Jonathon Provost
Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph Player Graph
Total 55:13.04 55:13.08 55:21.64 55:22.28 55:22.50 55:23.17 55:23.28 55:27.99 55:32.17 55:33.73 55:35.29 55:35.87 55:51.43 55:54.28 55:58.95 27:29.66 9:23.83 57:33.12 57:42.89
+ 0.04 + 8.60 + 9.24 + 9.46 + 10.13 + 10.24 + 14.95 + 19.13 + 20.69 + 22.25 + 22.83 + 38.39 + 41.24 + 45.91 + 35 Laps + 54 Laps + 61 Laps + 61 Laps
100%: 47.54 101%: 48.02 103%: 48.97 105%: 49.92 107%: 50.87 >107%: >50.87 Pitstop Takeover Penalty Lap Rejoin
1 1:54.87 1:54.68 1:54.34 1:56.19 1:55.12 1:57.66 1:57.25 1:54.48 1:58.15 1:55.51 2:00.29 1:59.82 1:59.05 1:58.86 2:01.22 1:57.98 1:55.42 57:33.12 57:42.89
2 1:47.38 1:47.59 1:47.50 1:46.57 1:47.26 1:45.38 1:45.68 1:47.75 1:44.98 1:47.15 1:43.36 1:43.90 1:44.56 1:44.51 1:42.62 1:45.31 1:47.24    
3 1:25.85 1:26.11 51.54 51.58 1:26.60 1:26.55 1:27.08 52.17 51.70 52.06 1:27.50 1:28.15 52.20 52.29 1:28.60 52.17 1:28.74    
4 58.77 58.57 1:21.71 1:22.66 58.72 59.13 58.64 1:22.68 1:23.66 1:23.55 58.75 58.83 1:24.38 48.62 58.89 1:24.20 58.84    
5 48.18 48.17 58.75 1:00.59 48.40 48.79 48.78 58.98 59.33 59.64 48.85 48.75 1:00.16 1:24.89 49.09 1:00.40 49.02    
6 47.86 47.85 48.29 48.12 48.37 48.07 48.08 48.43 48.00 48.42 48.43 48.27 49.17 59.15 48.97 48.75 48.39    
7 47.69 47.70 48.19 47.90 48.53 47.89 47.90 48.66 47.85 48.48 48.26 48.58 48.76 48.49 48.31 48.54 47.93    
8 47.85 47.85 48.29 48.04 47.96 48.12 48.11 47.87 48.05 48.37 48.33 48.64 48.42 48.49 48.35 48.45 48.25    
9 47.75 47.75 47.77 47.96 48.02 48.53 48.54 48.03 47.95 48.38 48.21 48.35 48.46 48.32 49.00 48.40      
10 47.73 47.73 47.72 47.83 48.08 48.03 47.95 48.11 47.83 48.27 48.24 1:00.71 48.37 48.32 48.55 48.45      
11 47.73 47.73 47.72 47.96 48.27 48.16 48.23 48.48 48.04 48.31 48.46 50.54 48.14 48.20 48.14 48.44      
12 47.86 47.86 47.87 48.01 48.35 47.96 47.96 47.95 47.94 48.36 48.34 48.65 48.36 48.24 48.38 48.45      
13 48.00 48.01 48.01 47.98 48.00 52.11 47.87 47.97 48.00 48.26 48.22 48.44 48.46 48.43 48.85 48.48      
14 53.22 54.44 54.82 52.42 53.42 55.10 54.76 53.04 52.87 53.78 55.41 48.81 54.87 54.34 54.91 53.61      
15 1:32.32 1:31.31 1:31.18 1:30.34 1:29.86 1:26.29 1:28.94 1:30.07 1:30.01 1:28.03 1:26.22 1:18.97 1:25.10 1:26.02 1:25.01 1:26.40      
16 1:47.91 1:48.00 1:47.93 1:47.92 1:48.26 1:48.38 1:48.91 1:48.14 1:48.00 1:48.43 1:48.81 1:48.78 1:48.69 1:49.07 1:49.06 1:48.47      
17 1:45.95 1:45.85 1:45.78 1:45.56 1:45.71 1:43.09 1:43.99 1:45.62 1:45.56 1:43.85 1:43.45 1:41.92 1:42.51 1:43.00 1:42.04 1:42.99      
18 51.56 51.39 51.29 51.84 52.01 51.77 51.23 51.70 51.62 51.75 51.97 51.78 52.09 52.50 52.04 52.09      
19 47.91 47.87 48.14 48.08 48.07 48.07 48.25 48.50 48.08 48.80 48.40 48.96 49.09 48.93 49.03 49.02      
20 47.83 47.83 48.07 47.87 48.32 48.32 48.28 48.85 47.89 48.82 48.90 49.01 48.85 1:06.20 48.59 48.58      
21 47.68 47.67 48.05 47.93 47.96 47.95 48.14 48.38 47.96 48.68 48.47 48.71 48.74 48.29 48.51 48.50      
22 47.65 47.65 48.29 47.76 47.73 47.74 48.19 48.29 47.71 48.17 48.14 48.55 48.60 48.25 48.36 48.66      
23 47.54 47.54 47.86 47.84 48.01 48.01 48.20 48.19 47.84 48.28 48.40 48.28 48.77 48.27 48.48 48.59      
24 47.65 47.65 47.86 47.97 48.06 48.07 48.07 48.15 48.93 48.49 48.30 48.25 48.35 48.38 48.49 48.62      
25 47.64 47.65 48.41 48.48 47.61 47.63 47.61 48.10 48.39 48.45 48.08 48.35 48.57 48.25 48.49 48.52      
26 47.78 47.78 48.18 48.22 47.85 48.28 47.84 48.09 48.82 48.36 48.15 48.23 48.65 48.31 49.16 48.91      
27 47.76 47.77 47.56 47.56 47.76 48.44 47.77 48.12 48.47 48.39 48.23 48.33 48.87 48.28 48.62 48.68      
28 48.00 47.98 47.83 47.85 47.73 48.04 47.72 48.19 47.99 48.36 48.16 48.18 48.50 48.26 48.89        
29 47.85 47.85 47.75 47.66 48.55 47.94 48.12 48.14 47.94 48.21 48.29 48.18 48.53 48.37 48.55        
30 47.69 47.69 48.41 48.26 48.54 47.91 49.10 48.16 47.92 48.24 48.24 48.28 49.02 48.40 49.03        
31 47.71 47.76 48.14 48.22 47.94 47.81 47.95 48.16 47.83 48.18 48.16 48.17 48.51 48.21 48.51        
32 48.07 48.03 48.37 48.21 47.96 47.96 47.96 48.16 47.96 48.25 48.17 48.26 48.60 48.31 48.76        
33 47.93 47.93 48.55 48.99 47.97 48.79 48.68 48.15 49.76 48.36 48.23 48.25 48.61 48.34 48.58        
34 47.84 47.84 48.14 48.03 48.29 47.85 47.98 48.16 48.57 48.23 48.22 48.33 48.55 48.29 48.56        
35 48.12 48.12 47.90 47.87 48.15 47.94 47.93 48.14 48.49 48.22 48.24 48.21 48.24 48.38 48.36        
36 47.90 47.89 47.97 48.01 48.34 48.28 48.42 48.45 48.52 48.33 48.24 48.23 49.02 48.36 49.00        
37 48.02 48.02 47.88 47.85 48.08 47.89 47.90 47.96 47.93 48.20 48.33 48.22 48.62 48.34 48.51        
38 47.79 47.80 47.80 47.80 47.84 47.83 47.87 47.93 47.93 48.31 48.21 48.18 49.02 48.22 49.30        
39 47.84 47.83 47.86 47.88 47.83 47.85 47.86 47.85 47.91 48.17 48.27 48.18 49.04 48.36 49.13        
40 47.82 47.84 47.84 47.83 47.87 47.89 48.06 48.09 48.27 48.24 48.17 48.20 48.78 48.31 48.65        
41 47.96 47.96 48.04 48.06 48.15 48.12 48.28 48.38 48.17 48.29 48.26 48.13 48.70 48.35 48.83        
42 47.89 47.87 47.90 47.86 48.11 48.61 48.23 48.06 48.02 48.21 48.19 48.16 48.63 48.25 48.91        
43 47.77 47.77 47.87 47.87 48.08 48.12 47.97 47.95 47.97 48.25 48.17 48.15 48.48 48.26 48.84        
44 47.82 47.83 47.87 48.47 48.17 48.11 48.10 47.95 47.94 48.22 48.17 48.12 48.53 48.25 48.74        
45 47.68 47.68 48.05 48.30 48.15 47.95 47.96 47.80 47.80 48.16 48.29 48.20 48.38 48.25 49.06        
46 47.75 47.75 48.03 48.27 48.05 47.80 47.71 47.84 47.84 48.09 48.18 48.22 48.41 48.28 48.97        
47 47.86 47.86 48.01 48.23 47.61 47.60 47.61 48.10 48.65 48.27 48.25 48.24 48.51 48.24 49.21        
48 47.84 47.84 48.13 48.24 47.78 47.77 47.78 48.22 48.37 48.14 48.22 48.09 48.49 48.44 49.27        
49 47.81 47.81 48.03 48.50 47.84 47.85 47.82 48.11 48.38 48.07 48.19 48.29 48.79 48.32 49.01        
50 47.81 47.81 48.11 48.00 47.91 47.90 47.93 48.10 48.23 48.19 48.40 48.19 48.42 48.25 49.10        
51 47.98 47.97 48.02 47.84 47.83 47.83 47.83 48.14 48.31 48.09 48.45 48.12 48.43 48.37 49.51        
52 47.80 47.81 48.09 47.99 47.86 48.04 47.85 48.10 48.22 48.12 48.27 48.15 48.34 48.13 49.57        
53 48.15 48.14 48.00 47.95 47.75 47.95 47.76 48.05 48.33 48.14 48.16 48.13 48.62 48.20 49.18        
54 47.90 47.91 48.00 47.97 47.78 47.97 47.74 48.07 48.34 48.00 48.63 48.29 48.79 48.19 48.78        
55 47.72 47.72 48.01 47.68 48.08 47.68 48.08 48.05 48.17 48.12 48.18 48.16 48.44 48.19 48.66        
56 47.83 47.83 48.01 47.71 48.03 47.67 47.83 48.04 48.19 48.11 48.25 48.05 48.32 48.18 48.85        
57 47.72 47.77 48.02 48.08 48.20 48.12 48.60 48.02 48.19 48.16 48.39 48.19 48.71 48.16 48.78        
58 47.77 47.72 47.96 47.84 47.79 47.81 47.78 48.31 48.25 48.24 48.53 48.34 49.00 48.18 48.62        
59 47.84 47.83 47.98 48.04 47.99 48.08 48.01 48.16 48.40 48.18 48.08 48.16 48.38 48.19 48.40        
60 47.82 47.83 48.02 48.05 48.11 48.28 48.02 48.03 48.63 48.16 48.26 48.09 48.58 48.20 48.38        
61 47.74 47.74 47.95 48.01 48.00 48.34 48.57 48.03 48.64 48.08 48.14 47.93 48.53 48.20 48.38        
62 48.08 48.05 47.98 47.68 47.83 48.07 48.02 48.14 48.48 48.10 48.53 49.04 48.67 48.15 48.31        

Lap by Lap Chart (click to enlarge)

Race Progress Chart (click to enlarge)