| TBO Challenge Season 2010 - Round 2 Race 1 | (replay) ![]() |
||||
| Version | LfS 0.5Z25 | ![]() |
![]() |
![]() |
|
| Time | 06.02.2010, 19:34:56 | ||||
| Distance | 16 Laps (52.91 km) | ||||
| Daytime | Day | ||||
| Weather | Clear | ||||
| Wind | No Wind | ||||
- Statistics Tables
| 
| TBO Challenge Season 2010 - Round 2 Race 1 | (replay) ![]() |
||||
| Version | LfS 0.5Z25 | ![]() |
![]() |
![]() |
|
| Time | 06.02.2010, 19:34:56 | ||||
| Distance | 16 Laps (52.91 km) | ||||
| Daytime | Day | ||||
| Weather | Clear | ||||
| Wind | No Wind | ||||
| Pos. | (Start) | Name | Car | Laps | Total Time | Gap [s] | Stops | Open Penalties | Best Lap | Leading Laps | LH | AU | SH | BH | AC | CV | ST | |
| 24 of 28 cars finished the race. | ||||||||||||||||||
| 1 | (±0) | 1 R.Blauwhoff | FXO | 16 | 22:50.11 | 0 | - | 1:24.77 | 16 (1-16) | X | X | W | ||||||
| 2 | (+4) | 60 D.Lind | XRT | 16 | + 6.22 | 0 | - | 1:24.99 | 0 | X | X | W | ||||||
| 3 | (+7) | 57 R.v.Buren | XRT | 16 | + 8.96 | + 2.74 | 0 | - | 1:25.23 | 0 | X | X | W | |||||
| 4 | (+5) | 9 P.Diaz | XRT | 16 | + 11.44 | + 2.48 | 0 | - | 1:25.21 | 0 | X | X | X | W | ||||
| 5 | (-3) | 54 J.Bakšys | FXO | 16 | + 13.09 | + 1.65 | 0 | - | 1:25.45 | 0 | X | X | W | |||||
| 6 | (-3) | 238 M.Šilhánek | XRT | 16 | + 15.02 | + 1.93 | 0 | - | 1:25.27 | 0 | X | X | W | |||||
| 7 | (+5) | 89 R.Osza | XRT | 16 | + 16.20 | + 1.18 | 0 | - | 1:25.31 | 0 | X | X | X | W | ||||
| 8 | (-3) | 05 R.Pearson | XRT | 16 | + 23.78 | + 7.58 | 0 | - | 1:25.26 | 0 | X | X | W | |||||
| 9 | (+4) | 93 A.Moroz | XRT | 16 | + 27.51 | + 3.73 | 0 | - | 1:25.86 | 0 | X | X | W | |||||
| 10 | (+1) | 14 P.Navarrete | FXO | 16 | + 31.55 | + 4.04 | 0 | - | 1:25.25 | 0 | X | X | W | |||||
| 11 | (+5) | 8 N.Demec | FXO | 16 | + 32.78 | + 1.23 | 0 | - | 1:26.08 | 0 | X | X | W | |||||
| 12 | (-5) | 07 G.Orla | FXO | 16 | + 34.47 | + 1.69 | 0 | - | 1:26.40 | 0 | X | X | X | W | ||||
| 13 | (+4) | 33 Y.Laprevotte | FXO | 16 | + 39.07 | + 4.60 | 0 | - | 1:26.34 | 0 | X | X | M | |||||
| 14 | (+10) | 37 J.Mace | FXO | 16 | + 39.51 | + 0.44 | 0 | - | 1:26.22 | 0 | X | W | ||||||
| 15 | (+5) | 06 J.Sedgwick | FXO | 16 | + 39.75 | + 0.24 | 0 | - | 1:26.51 | 0 | X | W | ||||||
| 16 | (+3) | 87 N.Puntola | XRT | 16 | + 43.15 | + 3.40 | 0 | - | 1:26.50 | 0 | X | W | ||||||
| 17 | (+1) | 70 A.Staškevičius | FXO | 16 | + 43.48 | + 0.33 | 0 | - | 1:26.15 | 0 | X | X | W | |||||
| 18 | (+9) | 23 J.Dohnalík | XRT | 16 | + 47.09 | + 3.61 | 0 | - | 1:26.80 | 0 | X | X | W | |||||
| 19 | (-4) | 52 M.Booth | XRT | 16 | + 48.69 | + 1.60 | 0 | - | 1:27.19 | 0 | X | X | W | |||||
| 20 | (+2) | 68 S.Moore | FXO | 16 | + 51.40 | + 2.71 | 0 | - | 1:26.05 | 0 | X | W | ||||||
| 21 | (+4) | 17 L.Chebbi | FXO | 16 | + 55.75 | + 4.35 | 0 | - | 1:26.89 | 0 | X | X | W | |||||
| 22 | (+1) | 99 L.Davidson | FXO | 16 | + 59.56 | + 3.81 | 0 | - | 1:27.69 | 0 | X | W | ||||||
| 23 | (+3) | 13 Y.Laszlo | FXO | 16 | + 1:03.83 | + 4.27 | 0 | - | 1:26.87 | 0 | X | X | X | X | Ks | |||
| 24 | (+4) | 12 N.Lamothe | FXO | 16 | + 1:17.65 | + 13.82 | 0 | - | 1:27.66 | 0 | X | X | W | |||||
| - | (21) | 51 L.Matonis | FXO | 8 | DNF | 0 | - | 1:29.06 | 0 | X | X | W | ||||||
| - | (14) | 4 K.Järve | XRT | 7 | DNF | 0 | - | 1:26.51 | 0 | X | X | W | ||||||
| - | (4) | 83 G.Casagrande | FXO | 6 | DNF | 0 | - | 1:25.22 | 0 | X | X | W | ||||||
| - | (8) | 11 N.McEvoy | XRT | 5 | DNF | 0 | - | 1:25.79 | 0 | X | X | W | ||||||
| Name | Average Lap | Stability | ||
| Sort: | Time | Veloc. [km/h] | Laps | Difference [s] |
| First lap isn't considered for std. deviation. | ||||
| 1 R.Blauwhoff | 1:25.63 | 139.02 | 16 | 0.53 |
| 60 D.Lind | 1:26.02 | 138.39 | 16 | 0.57 |
| 54 J.Bakšys | 1:26.45 | 137.71 | 16 | 0.63 |
| 57 R.v.Buren | 1:26.19 | 138.12 | 16 | 0.75 |
| 238 M.Šilhánek | 1:26.57 | 137.52 | 16 | 0.76 |
| 89 R.Osza | 1:26.64 | 137.40 | 16 | 0.78 |
| 9 P.Diaz | 1:26.35 | 137.87 | 16 | 0.79 |
| 93 A.Moroz | 1:27.35 | 136.29 | 16 | 0.87 |
| 52 M.Booth | 1:28.68 | 134.25 | 16 | 0.89 |
| 33 Y.Laprevotte | 1:28.07 | 135.17 | 16 | 0.99 |
| 07 G.Orla | 1:27.79 | 135.61 | 16 | 1.00 |
| 8 N.Demec | 1:27.68 | 135.77 | 16 | 1.03 |
| 99 L.Davidson | 1:29.35 | 133.23 | 16 | 1.09 |
| 06 J.Sedgwick | 1:28.12 | 135.10 | 16 | 1.14 |
| 37 J.Mace | 1:28.10 | 135.13 | 16 | 1.14 |
| 23 J.Dohnalík | 1:28.58 | 134.40 | 16 | 1.19 |
| 14 P.Navarrete | 1:27.60 | 135.89 | 16 | 1.25 |
| 87 N.Puntola | 1:28.33 | 134.78 | 16 | 1.39 |
| 68 S.Moore | 1:28.84 | 134.00 | 16 | 1.44 |
| 05 R.Pearson | 1:27.12 | 136.65 | 16 | 1.49 |
| 17 L.Chebbi | 1:29.12 | 133.59 | 16 | 1.57 |
| 13 Y.Laszlo | 1:29.62 | 132.83 | 16 | 1.58 |
| 70 A.Staškevičius | 1:28.35 | 134.75 | 16 | 1.62 |
| 83 G.Casagrande | 1:27.16 | 136.59 | 6 | 1.74 |
| 11 N.McEvoy | 1:28.27 | 134.86 | 5 | 2.22 |
| 12 N.Lamothe | 1:30.49 | 131.57 | 16 | 2.23 |
| 4 K.Järve | 1:29.75 | 132.64 | 7 | 2.87 |
| 51 L.Matonis | 1:32.69 | 128.44 | 8 | 2.99 |
| Name | Best Sector 1 | Best Sector 2 | Best Sector 3 | Best Possibe Lap | Best Lap | |||||||||
| Sort: | Time | Gap [s] | Lap | Time | Gap [s] | Lap | Time | Gap [s] | Lap | Time | Gap [s] | Time | Gap [s] | Lap |
| Combined Best Lap: 1:24.62 | ||||||||||||||
| 1 R.Blauwhoff | 22.83 | --- | 5 | 35.19 | --- | 3 | 26.60 | --- | 16 | 1:24.62 | 0.15 | 1:24.77 | --- | 16 |
| 60 D.Lind | 22.96 | 0.13 | 4 | 35.24 | 0.05 | 4 | 26.79 | 0.19 | 4 | 1:24.99 | --- | 1:24.99 | 0.22 | 4 |
| 9 P.Diaz | 23.10 | 0.27 | 3 | 35.26 | 0.07 | 5 | 26.71 | 0.11 | 4 | 1:25.07 | 0.14 | 1:25.21 | 0.44 | 4 |
| 83 G.Casagrande | 22.90 | 0.07 | 4 | 35.46 | 0.27 | 5 | 26.78 | 0.18 | 4 | 1:25.14 | 0.08 | 1:25.22 | 0.45 | 4 |
| 57 R.v.Buren | 22.97 | 0.14 | 5 | 35.29 | 0.10 | 4 | 26.60 | --- | 14 | 1:24.86 | 0.37 | 1:25.23 | 0.46 | 4 |
| 14 P.Navarrete | 23.01 | 0.18 | 5 | 35.52 | 0.33 | 9 | 26.67 | 0.07 | 8 | 1:25.20 | 0.05 | 1:25.25 | 0.48 | 9 |
| 05 R.Pearson | 23.10 | 0.27 | 12 | 35.29 | 0.10 | 6 | 26.68 | 0.08 | 9 | 1:25.07 | 0.19 | 1:25.26 | 0.49 | 9 |
| 238 M.Šilhánek | 23.11 | 0.28 | 4 | 35.29 | 0.10 | 4 | 26.67 | 0.07 | 2 | 1:25.07 | 0.20 | 1:25.27 | 0.50 | 4 |
| 89 R.Osza | 23.13 | 0.30 | 8 | 35.34 | 0.15 | 3 | 26.80 | 0.20 | 3 | 1:25.27 | 0.04 | 1:25.31 | 0.54 | 8 |
| 54 J.Bakšys | 23.00 | 0.17 | 8 | 35.49 | 0.30 | 4 | 26.81 | 0.21 | 5 | 1:25.30 | 0.15 | 1:25.45 | 0.68 | 5 |
| 11 N.McEvoy | 23.23 | 0.40 | 4 | 35.53 | 0.34 | 4 | 27.03 | 0.43 | 4 | 1:25.79 | --- | 1:25.79 | 1.02 | 4 |
| 93 A.Moroz | 23.19 | 0.36 | 16 | 35.52 | 0.33 | 7 | 26.94 | 0.34 | 14 | 1:25.65 | 0.21 | 1:25.86 | 1.09 | 15 |
| 68 S.Moore | 23.23 | 0.40 | 8 | 35.83 | 0.64 | 8 | 26.99 | 0.39 | 8 | 1:26.05 | --- | 1:26.05 | 1.28 | 8 |
| 8 N.Demec | 23.07 | 0.24 | 5 | 35.59 | 0.40 | 5 | 26.96 | 0.36 | 4 | 1:25.62 | 0.46 | 1:26.08 | 1.31 | 5 |
| 70 A.Staškevičius | 23.36 | 0.53 | 14 | 35.73 | 0.54 | 14 | 26.80 | 0.20 | 16 | 1:25.89 | 0.26 | 1:26.15 | 1.38 | 16 |
| 37 J.Mace | 23.19 | 0.36 | 14 | 35.57 | 0.38 | 15 | 27.02 | 0.42 | 9 | 1:25.78 | 0.44 | 1:26.22 | 1.45 | 9 |
| 33 Y.Laprevotte | 23.21 | 0.38 | 3 | 35.64 | 0.45 | 15 | 27.02 | 0.42 | 13 | 1:25.87 | 0.47 | 1:26.34 | 1.57 | 15 |
| 07 G.Orla | 23.25 | 0.42 | 10 | 35.83 | 0.64 | 16 | 26.93 | 0.33 | 6 | 1:26.01 | 0.39 | 1:26.40 | 1.63 | 5 |
| 87 N.Puntola | 23.33 | 0.50 | 9 | 35.84 | 0.65 | 13 | 27.00 | 0.40 | 14 | 1:26.17 | 0.33 | 1:26.50 | 1.73 | 9 |
| 06 J.Sedgwick | 23.07 | 0.24 | 3 | 35.84 | 0.65 | 5 | 27.02 | 0.42 | 4 | 1:25.93 | 0.58 | 1:26.51 | 1.74 | 3 |
| 4 K.Järve | 23.33 | 0.50 | 4 | 35.91 | 0.72 | 5 | 27.16 | 0.56 | 2 | 1:26.40 | 0.11 | 1:26.51 | 1.74 | 4 |
| 23 J.Dohnalík | 23.42 | 0.59 | 9 | 35.70 | 0.51 | 16 | 27.26 | 0.66 | 10 | 1:26.38 | 0.42 | 1:26.80 | 2.03 | 16 |
| 13 Y.Laszlo | 23.35 | 0.52 | 4 | 36.03 | 0.84 | 4 | 27.29 | 0.69 | 11 | 1:26.67 | 0.20 | 1:26.87 | 2.10 | 11 |
| 17 L.Chebbi | 23.34 | 0.51 | 14 | 35.74 | 0.55 | 2 | 27.30 | 0.70 | 12 | 1:26.38 | 0.51 | 1:26.89 | 2.12 | 14 |
| 52 M.Booth | 23.24 | 0.41 | 16 | 35.96 | 0.77 | 6 | 27.29 | 0.69 | 15 | 1:26.49 | 0.70 | 1:27.19 | 2.42 | 9 |
| 12 N.Lamothe | 23.59 | 0.76 | 4 | 35.93 | 0.74 | 2 | 27.39 | 0.79 | 7 | 1:26.91 | 0.75 | 1:27.66 | 2.89 | 3 |
| 99 L.Davidson | 23.66 | 0.83 | 4 | 36.03 | 0.84 | 6 | 27.39 | 0.79 | 11 | 1:27.08 | 0.61 | 1:27.69 | 2.92 | 8 |
| 51 L.Matonis | 23.39 | 0.56 | 3 | 36.67 | 1.48 | 7 | 27.34 | 0.74 | 2 | 1:27.40 | 1.66 | 1:29.06 | 4.29 | 2 |
| Name | Yellows Caused | Blues Seen |
| 17 cars caused 60 yellow and 0 cars got 0 blue flags. | ||
| 05 R.Pearson | 5 | 0 |
| 93 A.Moroz | 1 | 0 |
| 14 P.Navarrete | 2 | 0 |
| 8 N.Demec | 1 | 0 |
| 07 G.Orla | 1 | 0 |
| 33 Y.Laprevotte | 2 | 0 |
| 87 N.Puntola | 2 | 0 |
| 70 A.Staškevičius | 2 | 0 |
| 23 J.Dohnalík | 2 | 0 |
| 52 M.Booth | 5 | 0 |
| 68 S.Moore | 2 | 0 |
| 17 L.Chebbi | 2 | 0 |
| 99 L.Davidson | 6 | 0 |
| 13 Y.Laszlo | 9 | 0 |
| 12 N.Lamothe | 9 | 0 |
| 51 L.Matonis | 8 | 0 |
| 4 K.Järve | 1 | 0 |
| Lap | 1 R.Blauwhoff | 60 D.Lind | 57 R.v.Buren | 9 P.Diaz | 54 J.Bakšys | 238 M.Šilhánek | 89 R.Osza | 05 R.Pearson | 93 A.Moroz | 14 P.Navarrete | 8 N.Demec | 07 G.Orla | 33 Y.Laprevotte | 37 J.Mace | 06 J.Sedgwick | 87 N.Puntola | 70 A.Staškevičius | 23 J.Dohnalík | 52 M.Booth | 68 S.Moore | 17 L.Chebbi | 99 L.Davidson | 13 Y.Laszlo | 12 N.Lamothe | 51 L.Matonis | 4 K.Järve | 83 G.Casagrande | 11 N.McEvoy | ||||||||||
| Total | 22:50.11 | 22:56.33 | 22:59.07 | 23:01.55 | 23:03.20 | 23:05.13 | 23:06.31 | 23:13.89 | 23:17.62 | 23:21.66 | 23:22.89 | 23:24.58 | 23:29.18 | 23:29.62 | 23:29.86 | 23:33.26 | 23:33.59 | 23:37.20 | 23:38.80 | 23:41.51 | 23:45.86 | 23:49.67 | 23:53.94 | 24:07.76 | 12:21.51 | 10:28.28 | 8:42.93 | 7:21.36 | ||||||||||
| + 6.22 | + 8.96 | + 11.44 | + 13.09 | + 15.02 | + 16.20 | + 23.78 | + 27.51 | + 31.55 | + 32.78 | + 34.47 | + 39.07 | + 39.51 | + 39.75 | + 43.15 | + 43.48 | + 47.09 | + 48.69 | + 51.40 | + 55.75 | + 59.56 | + 1:03.83 | + 1:17.65 | DNF | DNF | DNF | DNF | ||||||||||||
|
||||||||||||||||||||||||||||||||||||||
| 1 | 1:32.30 | 1:32.98 | 1:35.74 | 1:36.38 | 1:34.67 | 1:34.57 | 1:36.43 | 1:41.27 | 1:36.90 | 1:38.65 | 1:38.79 | 1:37.26 | 1:40.86 | 1:42.49 | 1:40.51 | 1:38.43 | 1:42.73 | 1:42.97 | 1:39.35 | 1:44.87 | 1:44.06 | 1:43.92 | 1:45.17 | 1:44.43 | 1:45.01 | 1:37.95 | 1:34.83 | 1:35.75 | ||||||||||
| 2 | 1:24.81 | 1:25.32 | 1:25.84 | 1:25.81 | 1:26.38 | 1:25.30 | 1:26.52 | 1:27.82 | 1:27.78 | 1:27.51 | 1:27.40 | 1:26.91 | 1:27.83 | 1:27.33 | 1:27.07 | 1:27.40 | 1:27.16 | 1:27.64 | 1:28.51 | 1:27.97 | 1:27.61 | 1:27.98 | 1:28.21 | 1:28.36 | 1:29.06 | 1:27.27 | 1:25.93 | 1:26.86 | ||||||||||
| 3 | 1:25.14 | 1:25.46 | 1:25.33 | 1:25.57 | 1:25.66 | 1:25.74 | 1:25.51 | 1:29.28 | 1:26.38 | 1:28.02 | 1:26.55 | 1:26.55 | 1:28.05 | 1:27.99 | 1:26.51 | 1:31.18 | 1:28.07 | 1:28.64 | 1:28.45 | 1:28.39 | 1:27.72 | 1:28.11 | 1:27.79 | 1:27.66 | 1:29.38 | 1:27.07 | 1:25.80 | 1:26.12 | ||||||||||
| 4 | 1:25.51 | 1:24.99 | 1:25.23 | 1:25.21 | 1:25.85 | 1:25.27 | 1:26.45 | 1:26.83 | 1:27.21 | 1:26.01 | 1:26.71 | 1:27.07 | 1:26.91 | 1:27.67 | 1:27.06 | 1:28.28 | 1:28.25 | 1:28.12 | 1:29.03 | 1:28.59 | 1:27.53 | 1:28.64 | 1:28.09 | 1:35.91 | 1:30.25 | 1:26.51 | 1:25.22 | 1:25.79 | ||||||||||
| 5 | 1:24.99 | 1:25.33 | 1:25.41 | 1:25.44 | 1:25.45 | 1:25.66 | 1:26.31 | 1:25.99 | 1:26.36 | 1:28.62 | 1:26.08 | 1:26.40 | 1:27.26 | 1:28.33 | 1:26.72 | 1:27.77 | 1:29.51 | 1:27.11 | 1:28.29 | 1:27.42 | 1:27.71 | 1:29.04 | 1:27.80 | 1:30.99 | 1:31.20 | 1:33.17 | 1:25.59 | 1:26.84 | ||||||||||
| 6 | 1:25.06 | 1:25.07 | 1:25.53 | 1:25.28 | 1:25.86 | 1:25.56 | 1:25.55 | 1:25.48 | 1:26.65 | 1:27.23 | 1:26.36 | 1:26.42 | 1:27.68 | 1:27.48 | 1:27.19 | 1:27.72 | 1:26.68 | 1:27.16 | 1:27.50 | 1:27.46 | 1:27.39 | 1:28.04 | 1:32.18 | 1:30.55 | 1:31.50 | 1:28.71 | 1:25.56 | |||||||||||
| 7 | 1:25.25 | 1:25.92 | 1:25.36 | 1:25.38 | 1:25.91 | 1:25.85 | 1:26.22 | 1:25.76 | 1:25.98 | 1:26.20 | 1:26.89 | 1:26.76 | 1:27.02 | 1:26.66 | 1:27.22 | 1:28.00 | 1:30.72 | 1:27.64 | 1:28.09 | 1:27.75 | 1:31.51 | 1:27.96 | 1:28.56 | 1:28.18 | 1:29.41 | 1:27.60 | ||||||||||||
| 8 | 1:25.26 | 1:25.69 | 1:25.53 | 1:25.55 | 1:25.45 | 1:26.60 | 1:25.31 | 1:25.78 | 1:27.90 | 1:26.58 | 1:26.57 | 1:27.60 | 1:27.60 | 1:26.69 | 1:29.34 | 1:26.94 | 1:26.64 | 1:27.44 | 1:27.65 | 1:26.05 | 1:27.53 | 1:27.69 | 1:28.94 | 1:29.16 | 1:35.70 | |||||||||||||
| 9 | 1:25.09 | 1:25.49 | 1:25.40 | 1:26.50 | 1:26.24 | 1:26.10 | 1:25.66 | 1:25.26 | 1:26.63 | 1:25.25 | 1:27.15 | 1:26.61 | 1:27.26 | 1:26.22 | 1:26.69 | 1:26.50 | 1:26.53 | 1:27.14 | 1:27.19 | 1:26.94 | 1:27.35 | 1:28.52 | 1:28.74 | 1:30.70 | ||||||||||||||
| 10 | 1:25.16 | 1:25.95 | 1:25.37 | 1:25.37 | 1:25.81 | 1:27.13 | 1:26.20 | 1:25.80 | 1:26.72 | 1:25.91 | 1:26.27 | 1:26.74 | 1:27.23 | 1:27.21 | 1:27.37 | 1:27.03 | 1:26.50 | 1:26.84 | 1:28.17 | 1:26.91 | 1:27.58 | 1:28.29 | 1:28.46 | 1:29.05 | ||||||||||||||
| 11 | 1:25.09 | 1:25.67 | 1:25.45 | 1:25.90 | 1:25.74 | 1:26.21 | 1:25.79 | 1:26.90 | 1:26.74 | 1:27.23 | 1:28.43 | 1:28.59 | 1:26.66 | 1:26.64 | 1:26.64 | 1:26.92 | 1:27.06 | 1:27.43 | 1:27.72 | 1:28.40 | 1:28.72 | 1:29.18 | 1:26.87 | 1:29.10 | ||||||||||||||
| 12 | 1:25.07 | 1:25.33 | 1:25.38 | 1:25.68 | 1:25.87 | 1:26.73 | 1:25.89 | 1:25.36 | 1:26.25 | 1:27.90 | 1:28.36 | 1:27.43 | 1:27.34 | 1:27.37 | 1:27.41 | 1:26.73 | 1:27.14 | 1:28.80 | 1:27.89 | 1:27.67 | 1:27.61 | 1:28.15 | 1:28.31 | 1:28.40 | ||||||||||||||
| 13 | 1:25.49 | 1:25.68 | 1:25.48 | 1:25.61 | 1:26.19 | 1:26.42 | 1:26.44 | 1:25.30 | 1:26.72 | 1:26.88 | 1:26.87 | 1:27.39 | 1:26.81 | 1:26.94 | 1:26.88 | 1:26.87 | 1:27.43 | 1:28.49 | 1:27.78 | 1:27.67 | 1:28.10 | 1:28.97 | 1:28.51 | 1:29.32 | ||||||||||||||
| 14 | 1:25.39 | 1:25.90 | 1:25.39 | 1:25.54 | 1:25.88 | 1:26.01 | 1:25.89 | 1:25.40 | 1:26.74 | 1:27.88 | 1:27.18 | 1:28.97 | 1:27.31 | 1:26.82 | 1:27.18 | 1:26.82 | 1:26.35 | 1:27.95 | 1:28.15 | 1:27.91 | 1:26.89 | 1:28.43 | 1:29.17 | 1:28.76 | ||||||||||||||
| 15 | 1:25.73 | 1:25.54 | 1:25.98 | 1:25.95 | 1:26.00 | 1:25.81 | 1:25.79 | 1:26.08 | 1:25.86 | 1:26.07 | 1:26.84 | 1:26.87 | 1:26.34 | 1:26.76 | 1:27.57 | 1:27.58 | 1:26.67 | 1:27.03 | 1:27.41 | 1:30.13 | 1:29.73 | 1:28.18 | 1:28.03 | 1:28.87 | ||||||||||||||
| 16 | 1:24.77 | 1:26.01 | 1:26.65 | 1:26.38 | 1:26.24 | 1:26.17 | 1:26.35 | 1:25.58 | 1:26.80 | 1:25.72 | 1:26.44 | 1:27.01 | 1:27.02 | 1:27.02 | 1:28.50 | 1:29.09 | 1:26.15 | 1:26.80 | 1:27.62 | 1:27.38 | 1:28.82 | 1:28.57 | 1:29.11 | 1:28.32 | ||||||||||||||